Sie sind auf Seite 1von 64

Resource Planning

Chapter 15

2007 Pearson Education

How Resource Planning fits the Operations Management Philosophy

Operations As a Competitive Weapon Operations Strategy Project Management

Process Strategy Process Analysis Process Performance and Quality Constraint Management Process Layout Lean Systems

Supply Chain Strategy Location Inventory Management Forecasting Sales and Operations Planning Resource Planning Scheduling

2007 Pearson Education

Resource Planning at Starwood


Starwood manages employees, equipment, and supplies at 750 hotels around the world to ensure that the needs and expectations of each and every customer are met. To help forecast these needs, Starwood now uses an enterprise resource planning (ERP) system. Included in the ERP system by Oracle is an electronic reservation system that profiles the preferences of guests, allowing the staff to provide a customized experience for each guest. The ERP system schedules the hotels staff members, projects the amount of food, beverages, and other resources needed for the hotels food-service department. Starwoods ERP system also features a centralized database with accounting data, payroll, accounts payable information, general ledger and balance sheet, as well as income statements for its various properties.
2007 Pearson Education

Resource Planning and ERP


Resource planning: A process that takes sales and operations plans; processes information in the way of time standards, routings, and other information on how the firm produces its services or products; and then plans the input requirements. Enterprise process: A companywide process that cuts across functional areas, business units, geographical regions, and product lines. Enterprise resource planning (ERP) systems: Large, integrated information systems that support many enterprise processes and data storage needs.
2007 Pearson Education

ERP Application Modules

2007 Pearson Education

ERP Design
ERP revolves around a single comprehensive database that can be made available across the entire organization (or enterprise). The database collects data and feeds them into the various modular applications (or suites).
As new information is entered as a transaction in one application, related information is automatically updated in the other applications. The ERP system streamlines the data flows throughout the organization and provides employees with direct access to a wealth of real-time operating information. ERP eliminates many of the cross-functional coordination problems older nonintegrated systems suffered from.
2007 Pearson Education

Dependent Demand
Dependent demand: The demand for an item that occurs because the quantity required varies with the production plans for other items held in the firms inventory. Parent: Any product that is manufactured from one or more components.

Component: An item that goes through one or more operations to be transformed into or become part of one or more parents.

2007 Pearson Education

Lumpy Dependent Demand Resulting from Continuous Independent Demand

2007 Pearson Education

Parent Inventory (Independent)

Component Demand (Dependent)

Possible Planning and Control Systems


The most prominent systems now in use are the material requirements planning (MRP) system, the Drum-Buffer-Rope (DBR) system, and lean systems.

Products with many levels


of components, and more customization Lumpy demand, often with larger batch sizes Make-to-order, assembleto-order, and make-to-stock strategies Lower and intermediate volumes, with flexible flows
2007 Pearson Education

Capacity is leveraged to
control bottlenecks and entire system flow Simpler product structures and more standardized products Assemble-to-order or maketo-stock strategy Relatively higher volumes, with flexible flows transitioning to line flows

Using system as catalyst for


continuous improvement Small lot sizes, consistent quality, reliable suppliers, and flexible workforce Assemble-to-order or maketo-stock strategy High volumes and wellbalanced line flows

Material Requirements Planning


Material requirements planning (MRP): A
computerized information system developed specifically to help manufacturers manage dependent demand inventory and schedule replenishment orders.

MRP explosion: A process that converts the requirements


of various final products into a material requirements plan that specifies the replenishment schedules of all the subassemblies, components, and raw materials needed to produce final products.

Bill of materials (BOM): A record of all the components


of an item, the parentcomponent relationships, and the usage quantities derived from engineering and process designs.
2007 Pearson Education

MRP Inputs

Authorized master production schedule

Other sources of demand

Inventory transactions

Inventory records

MRP explosion

Bills of materials

Engineering and process designs

Material requirements plan


2007 Pearson Education

Bill of Materials Terms


Usage quantity: The number of units of a component that are needed to make one unit of its immediate parent. Inventory items:
End item: The final product sold to a customer. Intermediate item: An item that has at least one parent and at least one component. Subassembly: An intermediate item that is assembled (as opposed to being transformed by other means) from more than one component. Purchased item: An item that has one or more parents but no components because it comes from a supplier.

Part commonality: The degree to which a component has more than one immediate parent.
2007 Pearson Education

Bill of Materials

Back slats

Seat cushion

Leg supports

Seat-frame boards

Back legs

Front legs

A Ladder-back chair

2007 Pearson Education

Bill of Materials
A Ladder-back chair

B (1) Ladder-back subassembly

C (1) Seat subassembly

D (2) Front legs

E (4) Leg supports

F (2) Back legs

G (4) Back slats

H (1) Seat frame

I (1) Seat cushion

J (4) Seat-frame boards


2007 Pearson Education

Master Production Schedule


Master production schedule (MPS): A part of the material requirements plan that details how many end items will be produced within specified periods of time. MPS for a Family of chairs
April 1 Ladder-back chair Kitchen chair Desk chair Aggregate production plan for chair family
2007 Pearson Education

May 3 4 5 6 7 8

150
120 200 200 200

150
120 200

670

670

Master Production Scheduling Process


Operations must first create a prospective MPS to test whether it meets the schedule with the resources.

2007 Pearson Education

Developing a Master Production Schedule


MPS for Weeks 1 & 2
Forecast is less than booked orders in week 1; projected on-hand inventory balance = 55 + 0 38 = 17.

Forecast exceeds booked orders in week 2; projected onhand inventory balance = 17 + 0 30 = 13. The shortage signals a need to schedule an MPS quantity for completion in week 2.
2007 Pearson Education

Available-To-Promise Inventory
Available-to-promise (ATP) inventory: The quantity of end items that marketing can promise to deliver on specified dates.
It is the difference between the customer orders already booked and the quantity that operations is planning to produce.

As new customer orders are accepted, the ATP inventory is reduced to reflect the commitment of the firm to ship those quantities
Actual inventory stays unchanged until the order is removed from inventory and shipped to the customer.

2007 Pearson Education

MPS Worksheet

2007 Pearson Education

MPS
Schedule with

Item: Ladder-back chair

Order Policy: 150 units Lead Time: 1 week April May 3 30 4 30 5 35 6 35 7 35 8 35

ATP

Quantity on Hand: Forecast

55

1 30

2 30

Customer orders booked Projected on-hand inventory MPS quantity

38

27

24

17

137

107

77

42

122

87

150

150

MPS start Available-topromise (ATP) inventory

150

150

17

91

150

The total ordersbooked booked until the next MPS receipt The totalof ofcustomer customer orders until the next MPS receipt is 38 is 27 The ATP = 55 (on-hand) (MPS quantity) 38 = + units. 24 +8 = 59 units. The ATP + =0 150 (MPS quantity) 17. 59 = 91 units. 2007 Pearson Education

MPS for Product A


Application 15.1

2007 Pearson Education

MPS for Product A


Application 15.1

2007 Pearson Education

Inventory Record
Inventory record: A record that shows an items lot-size policy, lead time, and various time-phased data.
Gross requirements: The total demand derived from all parent production plans.

Scheduled Receipts (open orders) are orders that have been placed but not yet completed.
Projected on-hand inventory: An estimate of the amount of inventory available each week after gross requirements have been satisfied. Planned receipts: Orders that are not yet released to the shop or supplier. Planned order release: An indication of when an order for a specified quantity of an item is to be issued.
2007 Pearson Education

Inventory Record 8-Period Worksheet

2007 Pearson Education

Inventory Record
Shows an items lot-size policy, lead time, and various time-phased data.
Lot Size: 230 units Item: C Description: Ladder-back Chair Seat subassembly Lead Time: 2 weeks
Week 1 Gross requirements Scheduled receipts Projected on-hand 37 inventory Planned receipts Planned order releases 230 150 230 117 2 0 0 3 0 0 4 120 0 5 0 0 227 6 150 0 7 120 0 187 8 0 0 187

117

117

227
230

77

230 230

2007 Pearson Education 2007 Pearson Education

Projected on-hand inventory : An estimate ofan the amount of Scheduled Receipts orders) are orders that have been Gross requirements :(open The total demand derived from all parent Planned order release : An that indication ofyet when order for a Planned receipts : Orders are not released to the shop inventory available each week after gross requirements have placed but not yet completed. specified quantity of an item is to be issued. production plans. or the supplier. been satisfied.

Lot Size: 230 units Item: C Description: Ladder-back Chair Seat subassembly Lead Time: 2 weeks Week 1 Gross requirements Scheduled receipts Projected on-hand 37 inventory Planned receipts Planned order releases 230 2 3 4 5 6 7 8

150
230 117

0
0 117

0
0 117

120
0 227 230

0
0 227

150
0 77

120
0

0
0 187

187

230
230

The first a planned receipt lasts until 4, week 7, whenof projected inventory would drop Without planned receipt in week a shortage 3 units will occur: 117 +0 +0 to 77 + 120 = 43the units. Adding the second receipt brings 120 =0+ 30 units. Adding planned receipt bringsplanned the balance to 117 + 0the + balance to = 77 + 0units. + 230 120 = 187 units. Thelead corresponding planned order 230 120 227 Offsetting for a 2-week time puts the corresponding release for week 5 (or week minus plannedis order release back to 7 week 2. 2 weeks).
2007 Pearson Education 2007 Pearson Education

Planning Factors
Planning lead time: An estimate of the time between placing an order for an item and receiving the item in inventory. Setup time Processing time Materials handling time between operations Waiting time Lot-sizing rules: A rule that determines the timing and size of order quantities. 2007 Pearson Education

Lot Sizing Rules


Fixed Order Quantity (FOQ)
Fixed order quantity (FOQ): A rule that maintains the same order quantity each time an order is issued. Dictated by
Equipment capacity limits Quantity discount Truckload capacity Minimum purchase quantity EOQ
2007 Pearson Education

H10-A Using FOQ


Application 15.2

2007 Pearson Education

H10-A Using FOQ


Application 15.2

2007 Pearson Education

Lot Sizing Rules


Periodic Order Quantity (POQ)
Periodic order quantity (POQ): A rule that allows a different order quantity for each order issued but tends to issue the order at predetermined time intervals.
The order quantity equals the amount of the item needed to covers P weeks worth of gross requirements.
POQ lot size to arrive in week t

Total Gross requirements for P weeks, including week t

Projected on-hand inventory balance at end of week t-1

2007 Pearson Education

The POQ (P = 3) Rule for the


Ladder-back Chair Seat Subassembly
Item: C Description: Ladder-back Chair Seat subassembly Week 1 Gross requirements Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 2007 Pearson Education 153 150 2 3 4 120 5 6 150 7 120 8 Lot Size: P = 3 Lead Time: 2 weeks

230

(120 + 0 + 150) - 117 = 153


117 117 150 150 0 0 0

37

117

153

120

120

H10-A Using POQ


Application 15.3

2007 Pearson Education

H10-A Using POQ


Application 15.3

2007 Pearson Education

Lot-for-Lot
Lot-for-lot (L4L) rule: A rule under which the lot size ordered covers the gross requirements of a single week. Thus P = 1, and the goal is to minimize inventory levels. The projected on-hand inventory combined with the new order will equal zero at the end of week t.
L4L lot size to arrive in week t

Gross requirements for week t

Projected on-hand inventory balance at end of week t-1

2007 Pearson Education

The Lot-for-Lot (L4L) Rule for the


Ladder-back Chair Seat Subassembly
Item: C Description: Ladder-back Chair Seat subassembly Lot Size: Lead Time: 2 weeks

L4L Rule
1 Gross requirements Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 2007 Pearson Education 3 150 2 3 4

Week 5 6 150 7 120 8

120

230

(120 + 0 + 0) - 117 = 3
117 117 0 0 0 0 0

37

117

150

120

150

120

H10-A Using L4L


Application 15.4

2007 Pearson Education

H10-A Using L4L


Application 15.4

2007 Pearson Education

Comparing Lot-Sizing Rules


FOQ, POQ, and L4L rules affect inventory costs and setup and ordering costs. In the example, each rule took effect in week 4, when the first order was placed.
A comparison of projected on-hand inventory averaged over weeks 4 through 8 of the planning horizon for the ladder-back chair seat subassembly: FOQ: (227+227+77+187+187)/5 = 181 units POQ: (150+150+0+0+0)/5 = 60 units L4L: (0+0+0+0+0)/5 = 0 units

FOQ generates high inventory because it creates remnants. POQ reduces on-hand inventory because it does a better job of matching order quantity to requirements. L4L minimizes inventory investment but maximizes the number of orders placed.
2007 Pearson Education

Safety Stock
The usual policy is to use safety stock for end items and purchased items to protect against fluctuating customer orders and unreliable suppliers of components but to avoid using it as much as possible for intermediate items. Schedule a planned receipt whenever the projected on-hand inventory balance drops below the desired safety stock level.
Ladder-back Chair Seat subassembly

2007 Pearson Education

MRP translates, or explodes, the MPS and other sources of demand into the requirements needed for all of the subassemblies, components, and raw materials the firm needs to produce parent items. This process generates the material requirements plan for each component item.
MRP explosion

Material requirements plan


Action notices Releasing new orders Adjusting due dates
Routings and time standards

Priority reports Dispatch lists Supplier schedules

Capacity reports Capacity requirements planning Finite capacity scheduling Input-output control

Manufacturing resources plan


Performance reports Cost and price data

2007 Pearson Education 2007 Pearson Education

Material Requirements Plan


SEAT SUBASSEMBLY Weeks Gross Requirements Reqirements Scheduled Receipts Projected on-hand: 37 Planned Receipts Planned order Releases 1 150 230 2 3 4 120 5

LOT SIZE = 230 Units LEAD TIME = 2 Weeks 6 7 8 150 120

117

117

117

On hand Inventory + Scheduled receipts Gross Requirements


Seat Frames Weeks Reqirements Gross Requirements Scheduled Receipts Projected on-hand Inv. = 40 Planned Receipts Planned order Releases 1 2 3 4 5

LOT SIZE = 300 LEAD TIME = 1 Week 6 7 8

300

Seat Cushions Weeks Gross Reqirements Requirements Scheduled Receipts Projected on-hand Inv. = 0 Planned Receipts Planned order Releases 2007 Pearson Education 2007 Pearson Education 1 2 3 4 5

LOT SIZE = L4L LEAD TIME = 1 week 6 7 8

SEAT SUBASSEMBLY Reqirements Requirements Gross Requirements Scheduled Receipts Projected on-hand: 37 Planned Receipts Planned order Releases

Material Requirements Plan


Weeks 1 150 230 2 3 4 120 5

LOT SIZE = 230 Units LEAD TIME = 2 Weeks 6 7 8 150 120

117

117 230

117

227 230

227

117 units is insufficient to meet gross requirements of 120 for week 4, Frames so a planned order release of 230 must be scheduled. Seat
Weeks Gross Requirements Reqirements Scheduled Receipts Projected on-hand Inv. = 40 Planned Receipts Planned order Releases 1 2 3 4 5

LOT SIZE = 300 LEAD TIME = 1 Week 6 7 8

300

Seat Cushions Weeks Gross Reqirements Requirements Scheduled Receipts Projected on-hand Inv. = 0 Planned Receipts Planned order Releases 2007 Pearson Education 2007 Pearson Education 1 2 3 4 5

LOT SIZE = L4L LEAD TIME = 1 week 6 7 8

SEAT SUBASSEMBLY Reqirements Gross Requirements Scheduled Receipts Projected on-hand: 37 Planned Receipts Planned order Releases

Material Requirements Plan


Weeks 1 150 230 2 3 4 120 5

LOT SIZE = 230 Units LEAD TIME = 2 Weeks 6 7 8 150 120

117

117 230

117

227 230

227 230

77

187 230

187

77 units is insufficient to meet gross requirements of 150 for week 6, Frames so a planned order release of 230 must be scheduled. Seat
Weeks Gross Requirements Reqirements Scheduled Receipts Projected on-hand Inv. = 40 Planned Receipts Planned order Releases 1 2 3 4 5

LOT SIZE = 300 LEAD TIME = 1 Week 6 7 8

300

Seat Cushions Weeks Gross Reqirements Requirements Scheduled Receipts Projected on-hand Inv. = 0 Planned Receipts Planned order Releases 2007 Pearson Education 2007 Pearson Education 1 2 3 4 5

LOT SIZE = L4L LEAD TIME = 1 week 6 7 8

SEAT SUBASSEMBLY Reqirements Gross Requirements Scheduled Receipts Projected on-hand: 37 Planned Receipts Planned order Releases

Material Requirements Plan


Weeks 1 150 230 2 3 4 120 5

LOT SIZE = 230 Units LEAD TIME = 2 Weeks 6 7 8 150 120

117

117 230

117

227 230

227 230

77

187 230

187

Seat Frames Weeks 1 2 3 4 5

LOT SIZE = 300 LEAD TIME = 1 Week 6 7 8

Gross Reqirements Requirements Scheduled Receipts Projected on-hand Inv. = 40 Planned Receipts Planned order Releases

230 300

230

Seat Cushions Weeks Gross Requirements Reqirements Scheduled Receipts Projected on-hand Inv. = 0 Planned Receipts Planned order Releases 2007 Pearson Education 1 2 3 4 5

LOT SIZE = L4L LEAD TIME = 1 week 6 7 8

230

230

2007 Pearson Education

SEAT SUBASSEMBLY Gross Reqirements Requirements Scheduled Receipts Projected on-hand: 37 Planned Receipts Planned order Releases

Material Requirements Plan


Weeks 1 150 230 2 3 4 120 5

LOT SIZE = 230 Units LEAD TIME = 2 Weeks 6 7 8 150 120

117

117 230

117

227 230

227 230

77

187 230

187

Seat Frames Weeks Gross Reqirements Requirements Scheduled Receipts Projected on-hand Inv. = 40 Planned Receipts Planned order Releases 1 2 3 4 5

LOT SIZE = 300 LEAD TIME = 1 Week 6 7 8

40

230 300 110 110

230

110 300

300 110 is on-hand carried in untilprevious week 5production when more is needed. 40 on hand plus 300 in receipts minus demand ofin 230 = 110 Lot40 of 300 must be scheduled to start week 4 and isinventory carried from plan to week one. LOT SIZE = L4L arrives as planned receipt in week 5.
Seat Cushions Weeks Gross Reqirements Requirements Scheduled Receipts Projected on-hand Inv. = 0 Planned Receipts Planned order Releases 2007 Pearson Education 2007 Pearson Education 1 2 3 4 5

LEAD TIME = 1 week 6 7 8

230

230

Material Requirements Plan


SEAT SUBASSEMBLY Weeks Reqirements Gross Requirements Scheduled Receipts Projected on-hand: 37 Planned Receipts Planned order Releases 1 150 230 2 3 4 120 5

LOT SIZE = 230 Units LEAD TIME = 2 Weeks 6 7 8 150 120

117

117 230

117

227 230

227 230

77

187 230

187

Seat Frames Weeks 1 2 3 4 5

LOT SIZE = 300 LEAD TIME = 1 Week 6 7 8

Gross Reqirements Requirements Scheduled Receipts Projected on-hand Inv. = 40 Planned Receipts Planned order Releases

40

230 300 110

230 110 110 300


LOT SIZE = L4L LEAD TIME = 1 week 6 7 8

180 180
300

180 180

The 180 in inventory carried until the next gross On-Hand for week 5 is 300 + 110 - 230 = 180 requirements. Seat Cushions
Weeks Reqirements Gross Requirements Scheduled Receipts Projected on-hand Inv. = 0 Planned Receipts Planned order Releases 2007 Pearson Education 2007 Pearson Education 1 2 3 4 5

230

230

Material Requirements Plan


SEAT SUBASSEMBLY Weeks Reqirements Gross Requirements Scheduled Receipts Projected on-hand: 37 Planned Receipts Planned order Releases 1 150 230 2 3 4 120 5

LOT SIZE = 230 Units LEAD TIME = 2 Weeks 6 7 8 150 120

117

117 230

117

227 230

227 230

77

187 230

187

Seat Frames Weeks Reqirements Gross Requirements Scheduled Receipts Projected on-hand Inv. = 40 Planned Receipts Planned order Releases 1 2 3 4 5

LOT SIZE = 300 LEAD TIME = 1 Week 6 7 8

40

230 300 110

230 110 110 300


LOT SIZE = L4L LEAD TIME = 1 week 6 7 8

180
300

180

180 180

Planned order releases are sized tounits gross requirements. Two planned order releases of 230 are scheduled. Projected on-hand inventory remains at zero.
Seat Cushions Weeks Reqirements Gross Requirements Scheduled Receipts Projected on-hand Inv. = 0 Planned Receipts Planned order Releases 2007 Pearson Education 2007 Pearson Education 1 2 3 4 5

230

230

0
230

0
230

0
230

0
230

Material Requirements Plan


SEAT SUBASSEMBLY Weeks Gross Reqirements Requirements Scheduled Receipts Projected on-hand: 37 Planned Receipts Planned order Releases 1 150 230 117 2 3 4 120 227 230 5

LOT SIZE = 230 Units LEAD TIME = 2 Weeks 6 7 8 150 120 0 77 187 230 187

117 230

117

227 230

Seat Frames Weeks Reqirements Gross Requirements Scheduled Receipts Projected on-hand Inv. = 40 Planned Receipts Planned order Releases 1 2 230 300 110 3 4 5 230 180 300

LOT SIZE = 300 LEAD TIME = 1 Week 6 7 8

40

110

110 300

180

180

180

Gross requirements for seat-frame boards will be 1200 units (or 4x LOT SIZE = 300) L4L in week 3. Seat Cushions LEAD TIME = 1 week
Weeks Reqirements Gross Requirements Scheduled Receipts Projected on-hand Inv. = 0 Planned Receipts Planned order Releases 2007 Pearson Education 2007 Pearson Education 1 2 230 0 230 3 4 5 230 0 230 6 7 8

0 230

0 230

Other Important Reports


Action notice: A computer-generated memo alerting planners about releasing new orders and adjusting the due dates of scheduled receipts. Capacity requirements planning (CRP): A technique used for projecting time-phased capacity requirements for workstations; its purpose is to match the material requirements plan with the capacity of key processes. Manufacturing resource planning (MRP II): A system that ties the basic MRP system to the companys financial system and to other core and supporting processes.
2007 Pearson Education

Item As MPS and BOM


Application 15.5

2007 Pearson Education

Inventory Data
Application 15.5

2007 Pearson Education

Item D
Application 15.5

2007 Pearson Education

Item B
Application 15.5

2007 Pearson Education

Item C
Application 15.5

2007 Pearson Education

Drum-Buffer-Rope System
Drum-Buffer-Rope (DBR): A planning and control system that regulates the flow of work-in-process materials at the bottleneck or the capacity constrained resource (CCR) in a productive system.
Drum-Buffer-Rope System with a Capacity Constrained Resource (CCR)

Market Demand 650 units/week


2007 Pearson Education

Drum-Buffer-Rope System in Practice


The U.S. Marine Corps Maintenance Center in Albany, Georgia, overhauls and repairs vehicles used by the Corps. Repairs to equipment can vary tremendously at the U.S. Marine Corps Maintenance Center in Albany, Georgia. The center struggled to keep up with its repairs until managers implemented the simplified form of a drum-buffer-rope system. The result? Repair times fell from 167 days to just 58 days, on average.
2007 Pearson Education

Resource Planning for Service Providers


Dependent demand for services Restaurant Airlines Hospitals Hotels Bill of Resources: A record of a firms parent-component relationships and all of the materials, equipment time, staff, and other resources.
2007 Pearson Education

Level 1 Discharge

Bill of Resources (BOR)


A record of a service firms parent component relationships and all of the materials, equipment time, staff, and other resources associated with them, including usage quantities. BOR for Treating an Aneurysm
Level 6 Preoperative care (Angiogram)

Level 2 Intermediate care

Level 3 Postoperative care (Step down)


Level 4 Postoperative care (Intensive)

Level 5 Surgery Level 6 Preoperative care (Angiogram) Level 7 Preoperative care (Testing)

Nurse (6 hr)

MD (1 hr)

Therapy (1 hr)

Bed (24 hr)

Lab (3 tests)

Kitchen (1 meal)

Pharmacy (10 medicines)

2007 Pearson Education 2007 Pearson Education

Solved Problem 1
A LT = 1 B (3) LT = 2 D (1) LT = 3
LT = Lead time
2007 Pearson Education

C (1) LT = 3 F (1) LT = 1 G (1) LT = 3

If there is no existing inventory, how many units of items G, E, and D must be purchased to produce five units of end item A?

E (2) LT = 6

D (1) LT = 3 5 units of item G 30 units of item E 20 units of item D

Solved Problem 3
The MPS for product A calls for the assembly department to begin final assembly according to the following schedule: 100 units in week 2; 200 units in week 4; 120 units in week 6; 180 units in week 7; and 60 units in week 8. Develop a material requirements plan for the next eight weeks for items B, C, and D.
ITEM C
L4L 2 weeks 200 (week 1) 0

A LT = 2 B (1) LT = 1
D

C (2) LT = 2 D (1) LT = 3

DATA CATEGORY Lot-sizing rule Lead time Scheduled receipts Beginning (on-hand) inventory
2007 Pearson Education

B POQ (P=3) 1 week None 20

FOQ = 500 units 3 weeks None 425

Solved Problem 3
Item: B Description: Week 1 Gross requirements Scheduled receipts Projected on-hand 20 inventory Planned receipts Planned order releases 280 20 200 280 360 200 0 0 240 360 60 0 0 0 2 100 3 4 200 5 6 120 7 180 8 60 9 10 Lot size: POQ (P = 3) Lead time: 1 week

2007 Pearson Education 2007 Pearson Education

Solved Problem 3
Item: C Description: Week 1 Gross requirements Scheduled receipts Projected on-hand 0 inventory Planned receipts 200 0 400 400 240 360 0 0 240 120 0 360 0 120 0 0 2 200 3 4 400 5 6 240 7 360 8 120 9 10 Lot size: L4L Lead time: 2 weeks

200

Planned order releases


2007 Pearson Education 2007 Pearson Education

Solved Problem 3
Item: D Description: Week 1 Gross requirements Scheduled receipts Projected on-hand 425 inventory Planned receipts Planned order releases 500 500 425 25 25 285 500 425 500 305 305 305 360 305 2 400 3 4 240 5 360 6 120 7 8 9 10 Lot size: FOQ = 500 units Lead time: 3 weeks

2007 Pearson Education 2007 Pearson Education

Das könnte Ihnen auch gefallen