Beruflich Dokumente
Kultur Dokumente
11/24/2013
First of all, What is OPM (i.e. the product formerly known as GEMMS)?
On July 20, Oracle announced the GEMMS product suite will now be referred to as Oracle Process Manufacturing (OPM). OPM is designed exclusively for process manufacturers
Consumer Packaged Goods
Food, Beverage, Health and Beauty, Household Products
Industrial Products
Chemical, Pharmaceutical, Petroleum, Metals, Mining, Paper and Glass
11/24/2013
OPM Modules
11/24/2013
Inventory Purchasing Order Fulfillment Formula Production Process Operations Control Costing Quality Physical Inventory Laboratory Material Requirements Planning Master Production Scheduling Capacity Requirements Planning EC Intrastat
The current version of OPM is 4.10.06. It is integrated with Oracle 10.7 It is available in GUI only as a SmartClient. The term SmartClient is an oxymoron. It is highly suggested to use Citrix WinFrame as the client interface. Version 11.0 due in December will be written in Developer 2000 and be integrated with Oracle 11.0 NCA
11/24/2013 4
SOP improvements
Usability Team
The approach for design and deployment is not unlike other ERP applications
FastTrack4 Oracle
Testing and Delivery
As-Is and To-Be phases can range from 6 weeks to 6 months depending on the amount of change the client requires (i.e. systems replacement versus Reengineering). Most often GEMMS can be implemented in 6 to 10 months start to finish.
11/24/2013 8
The testing environment is intended as a sandbox for the project team to play The development environment serves as a test bed for new patches and upgrades
Oracle typically releases GEMMS patches every quarter and a major release each year
A training environment may be necessary as regularly scheduled classes are too few and far between
11/24/2013 9
Moving from To-Be to Will-Be requires confirmation that the processes can be performed in the system as designed. Using process flows as the basis for test scripts is the best method for insuring a comprehensive test. Documenting gaps and locking down the design now will save you from scrambling at go-live
11/24/2013 10
When To-be processes are confirmed, its time to start configuring the system
GL is setup first, then GEMMS can proceed. There are only a few data dependencies from Financials
Customers entered prior to Pricing Vendors entered prior to Contracts
The Item Master may be modified if no transactions have yet to occur. Make sure it is correct before on-hand balances are created.
11/24/2013 11
Nearly one-third of the integration points were upgraded in OPM release 4.1 integrated with Financials 10.7
11/24/2013
12
Master Files are synched through triggers and a data synchronization utility
Integration
AP FOB Codes AP Terms Codes SalesReps Currency Codes Exchange Rate Types Exchange Rates Customers Customer Association Vendors Vendor Association Shipper Association Warehouse Buyers Shipper Codes Freight Bill Method Items UOM UOM Types
Method Used
C, PL/SQL C, PL/SQL C, PL/SQL C, PL/SQL C, PL/SQL C, PL/SQL C, PL/SQL C, PL/SQL C, PL/SQL View PL/SQL Trigger PL/SQL Trigger PL/SQL Trigger View PL/SQL Trigger PL/SQL Trigger PL/SQL Trigger PL/SQL Trigger
13
11/24/2013
Method Used
JPL, PL/SQL JPL, PL/SQL C, PL/SQL C, PL/SQL C, PL/SQL C, PL/SQL
11/24/2013
14
Drill Downs have been a great selling point of OPM for years.
Integration
AP Payment History AR Invoice History OF GL Drill Down OF AR Drill Down
Method Used
JPL, PL/SQL JPL, PL/SQL Oracle Forms, View Oracle Forms, View
11/24/2013
15
Method Used
JPL, PL/SQL JPL, PL/SQL JPL, PL/SQL JPL, PL/SQL JPL, PL/SQL JPL, Oracle Forms
11/24/2013
16
Programs have been written in the field to import item master, formula master, pricing and various other tables. Six APIs exist in Process Operations Control to link DCS and PLC devices The GEMMS Technical Reference Manual is your best friend for these activities.
11/24/2013
17
After the production system is fully loaded, a stress test should be performed
Each module should be unit tested The entire system should be tested to simulate concurrent usage All background processes should be tested MRP, Cost Update, Data Synch, Test Subledger
11/24/2013 18
End-User Training is best conducted by the client project team member with superuser assistance. Make sure the trainers have taken a course on How Adults Learn. I have had success with Big Bang and the staged implementation approach One of the biggest tasks is the dynamic data conversion for items/lots/locations
11/24/2013 19
Using Developer 2000 tool set Full AOL compliance Discoverer 3.1 Oracle 8 Database support Oracle Web Forms + NCA = WAN Performance
Migration Approach
JAM Version
JAM Forms/ Reports
JAM JPL (4GL)
PL/SQL
C APIs
Requisitions
User entered purchase requisitions Expense or Inventory items Workflow based approval
RFQs & Quotations MRO Purchasing Integration with MRP Pay on Receipt
Web Suppliers
Supplier access through a browser View invoices, payments, P.O.s, past due receipts, etc.
Strategy: focus on process industries Release 4.1 Began shipping September 97 Continue to improve quality, customer satisfaction Release 11.0 Convert to Developer/2000 Integrate Oracle Purchasing
27