Anacostia Waterfront Transportation Master Plan 2013 Update

December 12, 2013

Tonights Speakers
Sanjay Kumar, P.E. DDOT Program Manager Anacostia Waterfront Initiative Sanjay.Kumar@dc.gov (202) 741-5356
Richard Staudinger, P.E. Anacostia Waterfront Initiative Richard. Staudinger@CH2M.com (202) 513-4605

Partnering Agencies
DC Water Office of the Deputy Mayor for Planning and Economic Development Department of General Services Department of Public Works District Department of the Environment Federal Highway Administration National Park Service Office of Planning
3

Meeting Agenda
6:30 p.m.
6:45 p.m.

Sign In
AWI Transportation Master Plan Overview Presentation Open House

7:15 p.m.

8:30 p.m.

Adjourn

Anacostia Waterfront FINAL REPORT JUNE 2005

Creating a World-Class Waterfront


30-Year, $10 Billion Program

Created by March 2000 Memorandum of Understanding Between the District and 19 Other Federal and Regional Agencies
5 Key Themes:

o Restore: A clean and active river.


o Connect: Eliminating barriers and gaining access. o Play: A great riverfront park system. o Celebrate: Cultural destinations of distinct character. o Live: Building strong waterfront neighborhoods.
5

AWI Framework and Progress


Led by Four District Agencies: o Department of Transportation

o Office of the Deputy Mayor for Planning and Economic Development


o Office of Planning

o Department of the Environment


Guided by 2003 Anacostia Waterfront Framework Plan

2010 10 Years Of Progress Report

AWI Transportation Master Plan


Continuous Pedestrian and Bicycle Access Along Waterfront Modal Shift to Public Transit Great Urban Boulevards with Mixed Uses, Landscaping and Great Civic Spaces Redesign Bridges in the Tradition of Great Civic Architecture

AWI Transportation Master Plan


Reduce Highway and Freeway Barriers Between Neighborhoods and Waterfront Parks Reconnect the City Street Grid to Waterfront Parks

Support and Foster Economic Development

Whats New Since 2008 TMP ?


Projects increased from 31 to 52 Corridors increased from four to six 16 projects completed Remaining projects vary in status from Planning, Environmental Documentation, Design or Construction. Projects no longer under active consideration: o Tunnel connecting I-395 with I-295 o Extension of Massachusetts Avenue over the Anacostia River o Reconfiguration of the Pennsylvania Avenue / I-295 interchange

Transportation Projects by Phase

10

AWI Transportation Corridors

Projects
1. Frederick Douglass Memorial Bridge Rehabilitation 2. Ballpark Roadways (2008 Near-Term Improvements) 3. South Capitol St Phase 1 Segments 1 & 2 4. South Capitol St Phase 2 Segments 4 & 5 5. I-295/Malcolm X Bridge Rehabilitation 6. I-295/Malcolm X Interchange

Status
Completed Completed

Design
Design Completed Design

12

Projects
1. Suitland Parkway Pedestrian/Bike Trail
2. South Capitol St Phase 2 Segment 3 3. Martin Luther King, Jr. Avenue Two-Way Reconstruction 4. Martin Luther King, Jr. Avenue Two-Way Widening

Status
Planning Design Completed Design

13

Projects
1. Pennsylvania & Potomac Ave SE Intersection 2. Pennsylvania Ave & DC 295 Entrance Ramp Improvements 3. Pennsylvania Ave & Minnesota Ave Intersection 4. Pedestrian Bridge: Anacostia High School to Anacostia Park 5. 11th Street Bridge ProjectPhase 1 6. 11th Street Bridge Project Phase 2 7. Barney Circle and Southeast Boulevard 8. Virginia Avenue / CSX National Gateway 12th Street SE

Status
Environmental Documentation Completed Design Completed Completed Under Construction Environmental Documentation Environmental Documentation

14

Projects
1. Kenilworth Corridor Near Term Improvements 3. East Capitol Street Interchange 4. Benning Road Interchange

Status
Completed

2. Nannie Helen Burroughs Interchange Completed Planning Planning

5. Eastern Avenue Interchange


6. Kenilworth Avenue Mainline Improvements 7. Parkside Pedestrian Bridge

Completed
Planning Design Design

8. DC 295/Kenilworth Pedestrian Bridges

15

Projects
1. 4th Street SW Reconstruction 3. The Wharf Infrastructure 4. Maryland Avenue SW / CSX National Gateway 5. M Street SE/SW Transportation Study

Status
Completed Design Planning Planning

2. Maine Avenue SW Improvements Completed

16

Anacostia Riverwalk Trails Corridor

Planning Design Completed

17

Projects
1. DC Streetcar 2. Water Taxi 3. Soccer Stadium 4. St. Elizabeths East Infrastructure 5. 14th Street Bridge Improvements 6. DC Water Clean Rivers/ CSO Project 7. Anacostia Park Master Plan

Status
Planning, Design and Construction Planning Planning Design Environmental Documentation Design and Construction Environmental Documentation Environmental Documentation Design and Construction Design and Construction

8. Long Bridge Study


AWI Master Drainage Plan Private Development

18

Sources of Project Funding


Uncommitted 8% Local 14%

Federal 25%
Private 53%

19

More Information

20

Thank You and Open House!

21