Sie sind auf Seite 1von 23

Presentation of Energy Conservation in Govt. Buildings of Maharashtra State.

Energy Saving

Energy Saved is Energy Generated.

Saving of Energy is the need of the day.


Government is one of the major consumer of Energy.

The Govt. has to lead others by taking effective steps to save the energy

Energy Saving

278 million units of energy per annum are consumed by Maharashtra State Government Office Buildings This is equal to 105 MW Generation during working hours under the assumption of 10 hours /day, 22 days /month, 12 months /year. One unit saved is TWO units generated. Annually Rs.111 crores are spent by the Government on energy bill .

Energy Saving

Energy Efficient Lamps and Equipments can save energy bill up to 30 %. 100/60/40 watts bulbs can be replaced by CFL lamps of 22/11/9 watts having power factor more than 0.9. 40/36W Fluo. fittings can be replaced by 28W E+/T5 fluo. fittings or their chokes by electronic chokes.

Four pillars of successful Energy Management

Four pillars of successful Energy Management : Key Elements

Successful energy management programme needs the total support of senior management. The other important requirements are

A well-charted strategy plan. An effective monitoring system. Adequate technical ability for analyzing and implementing energy saving options.

In any organization, which does not already possess an energy efficient ethics, good communication downwards from senior officials will be vital first step.
Active participation & planning for the energy management

Ways of Energy Conservation


Awareness Replacement of conventional fittings with E+ fluo. fittings Replacement of conventional pumps with submersible pumps/energy efficient pumps Replacement of old water coolers with energy efficient water coolers Replacement of GLS lamps with CFL lamps Incorporating timers for passage lights Incorporating digi guards for ACs Incorporating DPSD for compound & street lights

Ways of Energy Conservation

Replacement of electric water heaters with solar water heaters


Replacement of water coolers with heat pumps

Replacement of resistance type regulators with electronic regulators


Replacement of conventional chokes with electronic chokes Incorporating VFDs for hydro pneumatic systems, pumps & central AC plants Incorporating 3VF drives for lifts Smart Card (SIM) based Power Controller

Energy Saving at Vidhan Bhavan


Sr. No. Year Use of fitting / Equipment Nos. Capital cost (Rs. Lacs) 8.17 13.8 12.02 3.22 3.22 Date of commis -ioning 12/01 12/01 2/02 2/02 2/02 Saving in bill (Rs. Lacs) 2.97 5.49 5.37 1.79 1.79 Simple payback period (yrs) 2.8 2.5 2.2 1.8 1.8

1 2 3 4 5

2001-02 2001-02 2001-02 2001-02 2001-02

VFD for water pump Power factor correction capacitor panel E+ 28 W tube fitting in place of 40 W fitting Using reflector for 4 X 2 X 20 W New reflector with one tube in place of 2 X 40 W tube

6 Nos. 350 KVAR 1493 1493 1493

An expenditure of Rs. 40.43 lacs has accrued saving of Rs. 17.41 lacs per annum.

Energy Saving at Mantralaya


Sr. No. Year Equipment Used Quantity (Nos.) Cost of installation Rs.Lakhs 3.66 3.47 10.78 21.77 72933 159357 Units saved Saving in energy bill Rs(Lakhs) 2.67 10 months 4.28 3.65 7.97 2 -11 2-8 Simple pay back YearsMonths 1 2 3 4 2001-02 2002-03 2002-03 2003-04 E+fluo. Tubes E+fluo. Tubes Capacitor panel 180 KVAR 120 KVAR 1238 2705

5
6 7

2003-04
2004-05 2004-05

Capacitor panel
E+fluo. Tubes CFL 28W

50 KVAR
3572 810

27.77 11.60 203246 122705

1.58
10.16 6.14 2 -8 1 -11

An expenditure of Rs. 79.05 lacs accrued saving of Rs. 36.45 lacs in four years ( 5% increase in load).

Energy Efficient Equipments used in New Govt. Building works during 2001-2005
Sr. No . Name of Circle Solar CFLStreet Electro E+ Electronic DPSD (Nos.) Light Solar Solar CFL Lamp (Nos.) nic Fitting Regulator Street water (Nos.) choke (Nos.) (Nos.) Light heate (Nos.) 9 Watt 11 Watt 2x11W 1x18 W 2x26W 125W 250W 11W 18W r 10436 3127 1397 2310 17270 269 0 0 0 269 1003 1410 598 331 3342 350 0 0 526 876 48 641 255 16 960 1128 0 0 262 1390 1353 150 43 52 1598 123 233 62 52 470 535 0 169 30 734 20 63 0 2 85 0 10 0 0 6 0 6 2 0 2 0 4

1 2 3 4

Mumbai Pune Aurangabad Nagpur Total

526 123 46 264 0 0

836 133

By this Demand Side, 822 KW is saved.

Saving by Awareness in J.J. Hospital Units 0.8 MU & Amount Rs. 38.53 Lakhs in three years Saving by use of VFD in New Administrative Building -- Unit 30,000/year & Amount Rs.1.5 Lakhs/ year

Energy Saving Proposals submitted to Govt. for 35 bldgs. attracting EC Act 2001
Sr. No. Category Present Replacement (Quantity) Capital Cost (Rs. lacs) 469.06 Energy bill saving /year (Rs. lacs) 399.16 Payback period (yrs) 1.2 1. Fluo. fitting Conventional 40W (76023 Nos.) E+(28W) (53303 Nos.)

2.

Passage Lights: Conventional 40W fluo. fitting (1896 Nos.)


Water Pumps Conventional (61 Nos.)

CFL 11 W (1896 Nos.)


Submersible (61 Nos.)

2.84

7.98

0.4

3.

18.3

13.97

1.3

4.
5.

Passage Lights: Without Timer (144 Nos.)


Lamps GLS (40/100W) (3374 Nos.)

With Timer (144 Nos.)


CFL 11W (3374 Nos.)

0.3
5.06

0.76
27.75

0.5
0.2

Energy Saving Proposals submitted to Govt. for 35 bldgs. attracting EC Act 2001
Sr. Category No . 6. AC units Present Replacement Capital Cost (Rs. lacs) 19.94 Energy bill saving /year (Rs. lacs) 12.76 Payback period (yrs) 1.6

Without Digiguard (539 Nos.)

With Digiguard (539 Nos.)

7.
8. 9. 10.

Compound & Flood Lights


Water Heating System Water Cooling Hydro Pneumatic System

Without DPSD (614 Nos.)


Electric (1145 Nos.) Water Coolers (425 Nos.) Without VFD (15 Nos.)

With DPSD (614 Nos.)


Solar (167 Nos.) Heat Pumps (9 Nos.) With VFD (15 Nos.)

17.19
480 90 22.5

9.88
75.23 32.39 6.48

1.74
6.4 2.7 3.5

Energy Saving Proposals submitted to Govt. for 35 bldgs. attracting EC Act 2001
Sr. No. Category Present Replacement Capital Cost (Rs. lacs) 202.18 48.94 Energy bill saving /year (Rs. lacs) 41.26 13.84 Payback period (yrs) 5 3.5

11. 12.

Water Pumps Lifts

Without VFD (41 Nos.) Without 3VF drive (19Nos.) Resistive (6716 Nos.)

With VFD (41 Nos.) With 3VF drive (19Nos.) Electronic (6716 Nos.)

13.

Ceiling Fan Regulators

12.08

12

Energy Saving Proposals submitted to Govt. for 35 bldgs. attracting EC Act 2001
Sr. No. Present Replace by Capital Cost for replacement (Rs. Lacs) Saving in energy Bill Pay back every year Period (Rs. Lacs) Heat water Pump for Water coolers (328 Chilled water/ A.C. (151 Nos.) Nos.) Water coolers & L. Hot & chilled water heat P. G. at New pump system ( Council Hall 6 Nos.) Centralised Air condition units (6 Nos.) 60/ 80W ceiling fans ( 1728 Nos.) Split AC Units ( 73 Nos) Energy Efficient ceiling Fans ( 1728 Nos.)

14

261.76

51.6

15

20.4

7.32

2.8

16

36.54 16.03 1723.12

37.49 13.32 763.19

1 1.2 2.26

17

Total ::

An expenditure of Rs.1723.12 lacs can save 17.09 Millions Energy units per annum & accrues saving of Rs. 763.19 lacs per annum in bill.

ENERGY SAVING PROPOSAL OF OTHER GOVT. BUILDINGS


E+ fittings Sr. no. Department Qty (Nos) 35057 7415 32288 46199 9342 34907 34938 6084 16759 92 855 63638 3974 3245 861 337 425 296416 Capital Cost 3.09 0.65 2.84 4.07 0.82 3.07 3.07 0.54 1.47 0.01 0.08 5.60 0.35 0.29 0.08 0.03 0.04 26.10 CFL Fittings Qty Capital (Nos) Cost 7386 1653 5521 8907 2807 7496 12772 1288 2146 16 134 11385 826 638 334 53 209 63571 0.11 0.02 0.08 0.13 0.04 0.11 0.19 0.02 0.03 0.00 0.00 0.17 0.01 0.01 0.01 0.00 0.00 0.93 Solar Water Heaters Qty (Ltrs) 0 0 0 0 0 0 287750 0 0 0 0 0 0 0 0 0 0 287750

(Rs. in Crores)
Grand Total Energy Saving per year (million units) 3.01 0.64 2.7 3.92 0.85 3 6.52 0.52 1.36 0.01 0.07 5.35 0.34 0.28 0.08 0.03 0.04 28.72

Capital Capital Cost Cost 0.00 0.00 0.00 0.00 0.00 0.00 5.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.80 3.20 0.67 2.92 4.20 0.86 3.18 3.26 0.56 1.50 0.01 0.08 5.77 0.36 0.30 0.09 0.03 0.04 27.03

1 2 3 4 5 6 7 8 9

Home (Police) Home (Jail) Law & Judiciary Education Social Welfare Revenue Public Works (NonResi) Pblic Works (Resi) Other Administrative.

10 Labour Dept. 11 Vidhan Bhavan 12 Public Health 13 Finance 14 Animal Husbandry 15 Fisheries 16 Tech. Education 17 Dairy Deptt.

An expenditure of Rs. 27.03 crores accrues saving of Rs. 12.92 crores per annum & 28.72 million units .

ENERGY SAVING PROPOSAL OF OTHER GOVT. BUILDINGS


E+ fittings Sr. no. Department Qty (Nos) 35057 7415 32288 46199 9342 34907 34938 Capital Cost 3.09 0.65 2.84 4.07 0.82 3.07 3.07 0.54 1.47 0.01 0.08 5.60 0.35 0.29 0.08 0.03 0.04 26.10 CFL Fittings Solar Street Light Fittings Solar Water Heaters

(Rs. in Crores)
Grand Total Energy Saving per year (million units) 4.15 0.84 3.2 4.69 1.26 3.76 7.54 0.81 1.48 0.01 0.09 6.33 0.46 0.41 0.13 0.04 0.1 35.3

Qty Capital Qty Capital (Nos) Cost (Nos) Cost 7386 1653 5521 8907 2807 7496 12772 1288 2146 16 134 11385 826 638 334 53 209 63571 0.11 0.02 0.08 0.13 0.04 0.11 0.19 0.02 0.03 0.00 0.00 0.17 0.01 0.01 0.01 0.00 0.00 4424 776 1952 2992 1590 2937 3942 1118 477 0 72 3822 470 513 195 35 203 10.35 1.82 4.57 7.00 3.72 6.87

Qty Capital Capital (Ltrs) Cost Cost 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 5.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.80 13.55 2.49 7.49 11.20 4.58 10.05 18.28 3.18 2.62 0.01 0.25 14.71 1.46 1.50 0.55 0.11 0.52 92.55

1 2 3 4 5 6 7 8 9

Home (Police) Home (Jail) Law & Judiciary Education Social Welfare Revenue Public Works (NonResi) Other Administrative.

9.22 287750 2.62 1.12 0.00 0.17 8.94 1.10 1.20 0.46 0.08 0.48 0 0 0 0 0 0 0 0 0 0

Public Works (Non-Resi) 6084 16759 92 855 63638 3974 3245 861 337 425 296416

10 Labour Dept. 11 Vidhan Bhavan 12 Public Health 13 Finance 14 Animal Husbundary 15 Fisheries 16 Tech. Education 17 Dairy Deptt.

0.93 25518

59.72 287750

An expenditure of Rs. 92.55 crores accrues saving of Rs. 15.89 crores per annum & 35.3 million units .

Energy Saving in Important Govt.Bldgs : 2004-2005 (Rs. In Lacs)


Name of the Building Consumption in units 2003-04 Mantralaya Navin Vidhan Bhavan Mumbai High Court Manora J J Hospital Total 4037085 1325600 681996 2346520 1570770 9961971 2004-05 3959960 1225000 675855 2294500 1561000 Saving (units) 77125 100600 6141 52020 9770 % 1.91% 7.59% 0.90% 2.22% 0.62% 2.47% Energy Bill 2003-04 2004-05 260.58 90.27 46.87 159.59 60.62 617.93 229.94 74.04 41.27 157.17 52.47 554.89 Energy Saving Rs. 30.64 16.23 5.6 2.42 8.15 63.04 % 11.76% 17.98% 11.95% 1.52% 13.44% 10.20%

9716315 245656

Energy Saving of Electrical Wing Offices of PWD


Annual Energy Saving of Electrical Wing
Sr. Month & Year Units No. 1 1 2 3 4 2 Mar-04 Apr-04 May-04 Jun-04 3 22125 19691 24379 21280 Month & Year 5 Mar-05 Apr-05 May-05 Jun-05 units Consumed 6 17063 16726 20770 16221 Differnce Units 8 5062 2965 3609 5059 Percentage 9 22.88 15.06 14.80 23.77

BOT Pilot Projects of PWD Bldgs


MLA Hostel, Nagpur Ravi Bhavan, Nagpur Golf Club, Nashik (Circuit House)

Inspection Bunglow, Pune


Subhedari Rest House, Aurangabad

BOT Pilot Projects of PWD Bldgs : Abstract (Rs. In Lacs)


Sr. No. 1 2 3 4 5 Name of the Building No. of Suits 386 128 51 45 56 666 LPD Capacity (Ltrs) 39000 6600 4700 4500 8400 58700 E+ CFL Fittings Fittings (Nos.) (Nos.) 1158 340 58 177 200 1933 1644 130 139 256 0 2169 Capital Cost 70.71 14.4 9.66 12.43 15.31 122.51 Expected Net Saving 17.23 3.47 2.37 2.62 4.56 30.25 Payback Period 7 YRS 7 YRS 7 YRS 8 YRS 5 YRS IRR M.L.A. Hostel, Nagpur Ravi Bhavan, Nagpur Golf Club, Nashik Subhedari Rest House, Aurangabad Inspection Bunglow, Pune Total 15.46% 15.08% 15.69% 14.01% 14.93%

Similar Proposals for BOT can be implemented for other departments after their assurance to share the saving with the BOT operator.

One Unit of Energy saved is equivalent to Two Units of Energy Generated.

Thank You
Save Energy To Build Nation.

Das könnte Ihnen auch gefallen