Rated as the best airport for 7 consecutive years (2005-2012) Overwhelming facilities Best departure and arrival process in the whole industry
November 1992: Phase I construction and site preparation initiated March 2001 : Phase I competed
February 2002: Phase II construction starts June 2008: Phase II construction is completed
2011: Phase III construction starts 2017: Phase III construction is expected to be completed Estimated expenditure: 4 trillion (USD3.7 billion)
CONTROL TOWER
22 story, 100.4 meters tall A Parabolic antenna is located on the highest floor, which is used by he Airport Surface Detection Equipment Detects all airplanes and obstacles within 5km Total area of Control Tower is 179sqm, the 3rd largest in the world
RUNWAYS
3 parallel asphalt runways, 15R/33L, 15L33R and 16/43 Both 15R/33L and 15L/33R are each 3750 meters long, while runway 16/34 is 4000 meters long All runways are equipped with ILS CAT IIIb at both sides to allow for operation in visibility conditions as low as 50 meters Air Traffic Controllers can provide progressive taxiing to an aircraft by setting the computer to manipulate the taxi and runway lights so that it will lead them to their designated gate or parking stand
MAIN TERMINAL
The main passenger terminal measures 594,000 sqm Was designed by Curtis W. Fentress of Fentress Architects Construction cost was 1.3816 trillion (USD 1.2 billion) The terminal has:
44 boarding ports (all of which can accommodate the new Airbus A380) 50 customs inspection ports 2 biological quarantine counters 6 stationary and 14 portable passenger quarantine counters 120 arrival passport inspection counters 8 arrival security ports 28 departure security ports 252 check in counters 120 departure passport inspection counters
CONCOURSE
Completed at the end of May 2008 All foreign airlines use this terminal as of 10th June 2008 Connected to the Main Terminal by two parallel 870metre long underground passageways equipped with IATs (Intra Airport Transit). Has 30 gates and 6 lounges
CARGO TERMINAL
The Cargo Terminal Area (CTA) comprises:
6 cargo terminals 5 separated warehouses All E/F class 36 parking stands for freighters Administration offices
GROUND TRANSPORT
Bus
Bus stops are located on the arrival floor Bus tickets and information are available here
Taxi
Taxi stops are located on the arrival floor Jumbo taxis, branded taxis and regular taxis are available here
ACCOLADES 2013
Best Airport In The World
Award Presentation : GT Tested Awards Organization : Global Traveler Circulation : World
ACCOLADES 2013
Airport with the Best Duty Free
Award Presentation : Airport with the Best Duty Free Organization : Business Traveler Magazine Circulation : World
ACCOLADES 2013
Airport of the Year 2013
Award Presentation : World Air Cargo Awards 2013 Organization : Air Cargo Week Circulation : World