Beruflich Dokumente
Kultur Dokumente
PERIOD:JULY DECEMBER 11
INTRODUCTION OF COMPANY
Coral Telecom Limited an ISO 9001:2000 certified company Established in 1996 Coral Telecom today covers the full range of communication needs.
Its products offer total control over the technology, both in terms of hardware and software.
The Costumer of coral Telecom is in world wide. Coral Telecom also has a wholly owned, Independent R&D division in Nodia(U.P) The production of coral telecom is in Solan(H.P)
Coral Telecom is the EPABX Company in India with its own R&D.
The company exports its products to 14 countries across the globe with a strong presence in UAE
Coral Telecom has implemented large telecom projects both in the private and government sectors Coral Telecom has evolved itself as a potent company capable of realizing its mission statement.
SBDX
DX
IRIS
PDMUX
RIDEX
SBDX
SBDX is Small Business Digital Exchange MAX USER CAPACITY :
37
DX
DX is Digital Exchange MIN USER CAPACITY :
40
512
PDMUX
Primary Digital Multiplexer
MAX USER CAPACITY :
128
EXAMPLE
SHIMLA
RAILWAY STATION
KNDAGAAT
RAILWAY STATION
RAILWAY STATION
SOLAN
TRRRRR
RTRRRR
RRTRRR
KALKA
RRRRRT
RAILWAY STATION
PARWANU
RAILWAY STATION
DHARAMPUR
RAILWAY STATION
RRRRTR
RRRTRR
IRIS IVDX
IRIS IVDX can handle data as freely as it would handle voice traffic
RIDEX
CORAL RIDEX
RIDEX is Ruggedized Integrated digital Exchange RIDEX It Is Also Known as Military Cabinet
FEATURE
Light Weight and less than 20 Kg. EMC : MIL-STD-461D
Operating : 20 to +55oC
Storage : -40 to +85oC Operator with 4X40 Capacity up to 512 ports
Torque controlled screw driver Wire stripper and cutter Nut Runner
Spanner Set Combinational pliers Spanner for Ring Nut Duster (6 inches x 6 inches) Loctite (247)
Glass cleaner
STEP 5-
Place the back Panel of the system on the flat top table and Fix the thermal pad on the back
STEP 6-Place the FCBC card on top of the thermal pad and put
the aluminum cover
STEP 7-
Install the 3 pin AC Filter along with Gasket from the inner side of the rear panel of the system cabinet. Install the AC On/Off switch along with waterproof Cap . Install the AC fuse holder on the cabinet and install the AC Power LED on the Panel as well DC also
FOR DC
FOR AC
PWR Harness Connect the Earth Wire from Earth terminal to the system Motherboard. Install the AC PWR Harness Connect the FCBC to Motherboard Harness between the FCBC and the Motherboard.
STEP 9Tighten the back panel of the system by tightened the 10 Nos.
Required hardware
VFD Glass Fix the 4x4 Numerical keypad rubbers on the 4 x 4 keypad PCA . Fix the 2x8 functional keypad rubbers on the 2 x 8 keypad PCA . 4x4 keyboard VFD GLASS
2x 8 keyboard
STEP 11-
1 2 2 4 1 4 4
PSU OPR
PSU
FCBC
FRONT VIEW
12V,24V,48V
24V ,48V
OUTPUT
Power Backup
:
:
48 V DC
12V,24V,48V battery bank
Microcontroller
24V
40V,52V,48V
WORKING
FEATURE
Output
current is Programmable
Over voltage is possible Compatible with all major battery types When Ac offline than automatically Dc will be on Integrated thermal protection
which converts -48V DC input to +5V, -24V, -48V and +48V as per other cards requirement.
We use two PSU Card on a system ,when the working PSU card fails, the protection card takes over automatically. Input fusing and output over current protection are provided as safety features
5V
50V
555 TIMER & EURO CONNECTOR
Input 32 to 72V DC
GND
-24V
-48V
-24V
TESTING
VISUAL& SOLDERING QUALITY BUMP TEST OR MODIFICATION CHECK ENVIRONMENTAL TEST LED 1 INDICATION ,LED 2 INDICATION APPLY DIFFERENT INPUT VOLTAGES CORRESPONDING DIFFERENT OUTPUT VOLTAGES
APPLY DIFFERENT INPUT VOLTAGES WITH LOAD CORRESPONDING DIFFERENT OUTPUT VOLTAGES
CPU-HD
Control
Multilevel distribution Microprocessor : EP 9302 CPU clock rate is 200Mz Program memory :Flash ROM 128 Mb Data Base : static RAM 8 Mb RAM up battery voltage 3.6VDc voltage
Main processor
BATTERY
CPLD
FPGA
IP ETHERNET
FPGA
BLOCK DIAGRAM
Buffer CPLD UART 1
FPGA UART 4
Prosser EP9302
FLASH
SDRAM
RTC PLL
DSP
SRAM
SP Memory
OSC
FEATURE WORK
REST CARD UTC OPR GSM RIC Software Detail Total system assembling Final Testing of system System installation Advantage & disadvantage Total Cost Conclusion
Introduction ,Block Diagram , Component overview Testing Working,used,Advantage Disadvantage