BY: ANKIT RAJ EEE,5th sem 100210722421

CHAPTER NO. 1 2. 3. 4. 5.

CONTENTS INTODUCTION OF TATA POWER COAL FUELLED ELECTRICITY GENERATING UNIT RANKINE CYCLE FLY ASH DISPOSAL SYSTEM BRIEF SYSTEM DESCRIPTION

PAGE NO.

It was started in 1997 by acquiring the 67.5MW captive power plant from TATA STEEL. Initially it started with single unit of 67.5MW, but keeping in view the modernization and rapid industrial development of JHARKHAND in general & TATA STEEL in particular , two more units were setup in 2001 & 2002 respectively .In September 2005 one more unit was setup into keep with the growing demand for power from the industries in Jamshedpur. TOTAL GENERATION:- 547.5mw UNIT 1(1997):- 67.5MW UNIT 2(2001):- 120MW UNIT 3(2002):- 120MW UNIT 4(2005):- 120MW UNIT 5(2009):- 120MW

A modern pulverized coal-fired electricity generation facility uses the most commonly employed Rankinebased thermodynamic cycle . steam at desired pressure , temperature and mass flow is produced in a steam generator & expanded through a turbine generator . The exhaust steam is then condensed in a condenser & the liquid is used again in the steam generator.

Burning of pulverized coal in the furnace results in the generation of large quantity of ash . This ash constitutes of 80% fly ash and 20% bottom ash. Fly ash is one of the residues generated in combustion, and comprises the fine particles that rise with the flue gases.

Bottom ash hopper Scrapper conveyor Clinker Grinder

Belt Conveyor
Bottom Ash Silo

Vibrating feeder Truck

ESP HOPPER

TRANSMITTER VESSEL
FLY ASH SILO SPOUT/ASH CONDITIONER CLOSE/OPEN TRUCK

S.I . NO 1.

Alternative Dense phase pneumatic system

Merits Conveying speed is low. Wear and tear is minimum.

Demerits Free movement space is limited below ESP area

2. Vacuum type pneumatic system

Clear space is available below ESP area.

Conveying speed is high Wear and tear is high Fall in vaccum results in reduction of capacity

For road construction Cement production Stabilization of soft soils Mine reclamation Mineral filler in asphaltic concrete Bricks

Pressure is created in transmitter vessel.


Size of vessel is depends on number of cycles

Capacity=2000 T
2 Nos

Storage Capacity=18hrs

Provided on two of the outlets on each of the silos Telescope into inlet of container trucks thus reducing dust nuisance Fitted with level probe

For the operation of complete ash handling system of boiler UNIT# 4 a dedicated PLC/PC system has been supplied. Complete system can be distributed in four sub-system: 1.)Ash collected from hoppers, ESP 1st to 7th field hoppers & stack hopper is conveyed to a common fly ash silo through dense phase pneumatic conveying system. 2.) the bottom ash from bottom ash hopper-1 & 2 of UNIT#4 is conveyed to ash slurry Pump. 3.)Conveying of ash slurry from the ash slurry Pump to the ash disposal pond. 4.)Fly ash silo unloading system distributed in four system.