Sie sind auf Seite 1von 46

A Seminar on

VALIDATION OF FLUID BED AND TRAY DRYER

CONTENT:
Why to validate? Parts of Equipment Validation Who should do Equipment Validation? Equipment qualification Typical process flow of solid dosage form Validation of fluid bed dryer Validation of Tray dryer

WHY TO VALIDATE?
Equipment validation is Vital for Safety Fewer interruptions of work Lower repair costs Elimination of premature replacement Less standby equipment Identification of high maintenance cost Reduction of variation in results Greater confidence in the reliability of results
3

PARTS OF EQUIPMENT VALIDATION


Design Qualification (DQ)

Performance Qualification (PQ)

Equipment Validation

Installation Qualification (IQ)

Operational Qualification (OQ)


4

WHO SHOULD DO EQUIPMENT VALIDATION?


THE VENDOR OR THE USER?

The user has the ultimate responsibility for equipment qualification. DQ should always be done by the user. While IQ for a small and low cost instrument is usually done by the user, and IQ for large, complex and high cost instruments should be done by the vendor. OQ can be done by either the user or the vendor. PQ should always be done by the user

EQUIPMENT QUALIFICATION
Equipment qualification / validation includes following things : Design qualification (DQ) Installation qualification (IQ) Operational qualification (OQ) Performance qualification (PQ)

TYPICAL PROCESS FLOW OF SOLID DOSAGE FORM


Addition of raw material -active excipients Preble bending -high speed mixer granulator Granulating - high speed mixer granulator Drying -fluid bed dryer -tray dryer

Tableting -high speed rotary

Blending -v-blender

Addition of raw material -lubricant -disintegrants

Sizing -mill/sieve

TYPICAL VARIABLE OF DRYING PROCESS


Control variable Initial temperature Load size Drying temperature program Air flow program Drying time Cooling time

Measured responses Density Yield Moisture content

VALIDATION OF FLUID BED DRYER

FLUID BED DRYER

10

FBD CONTROL PARAMETERS


Fixed
Bowl change Porosity of filter bags Bowl sieve

Variable (monitor)
Inlet/exhaust air temperature Product temperature Drying time Air volume Humidity of incoming air Humidity of exhaust air

Response (Test)
Particle size distribution Densities Loss on drying Assay

11

INSTALLATION QUALIFICATION(IQ)
Installation

Procedure:

After checking all the specifications as mentioned in the selection criteria, service engineer of the manufacturer shall be called for commissioning, if necessary. Authorized validation team shall carry out installation. Department Head of production, QA & engineering shall evaluate installation report
12

Conti

Acceptance Criteria For Installation Qualification: The equipment shall fulfill the selection criteria & its purpose of Application. Name of the manufacturer & supplier shall be as mentioned in the Purchase order The manufacturer/supplier shall provide complete equipment manual along with the equipment

All recommended utilities of recommended capacities are to be provided near the place of installation
13

Conti
Revalidation Criteria The equipment shall be revalidated if; Location of the equipment is changed. There is change of spare/parts,major maintenance or breakdown that have a direct effect on the performance of the equipment

14

Conti
Conclusion: The equipment shall be considered qualified for installation provided it meets all the parameters mentioned in the acceptance criteria. After receiving installation report, it shall be evaluated & released for operational qualification, provided installation report is evaluated & the equipment is found meeting all parameters of acceptance criteria

15

OPERATIONAL QUALIFICATION (OQ)


Training record Before initiating OQ ensure that SOP for Cleaning and operation of FBD is available.

Purpose: To train the qualification team for performing OQ

16

Conti
Procedure Initiate the actual operation of the FBD to ensure that machine is operating within specification. Check the OQ parameters against their specifications. Observe the functioning of all controls available on control panel Record the observation Perform and attach report of heat distribution study as per ` Heat distribution study procedure

17

Conti
Acceptance criteria (Heat Distribution Study:) Temperature difference between all thermocouples and set temperature should not differ by more than 5 C. All operating inputs provided on the equipment when tested shall-successfully comply -meet tolerance limit The equipment should successfully perform when operated as per SOP

18

Conti
Critical gauges/indicators provided on the equipment---calibrated The equipment when operated shall not - produce abnormal sound - show any discrepancy in its smooth operation.

19

Conti
Revalidation Criteria: The equipment shall be revalidated if; Location of the equipment is changed. There is change of spare/ parts, major maintenance or breakdown that have a direct effect on the performance of the equipment Critical gauges shall be replaced or corrected At normal revalidation schedule.

20

PERFORMANCE QUALIFICATION(PQ)
To check Heat Distribution by placing 10 thermocouples in geometric pattern with the FBD Shell and empty Product Container without any load to ensure heat distribution in the drying chamber Heat distribution study will be performed at 65 5C for two hour after achieving the temperature on the controlling sensors to ensure proper heat distribution.

21

Conti
Procedure After completion of OQ initiate the PQ of FBD. The effectiveness of drying will be qualified by determining reduction of % moisture content in drying process. 3 batches/ lots of any product will be taken for PQ of FBD. At least 2.0 gm of sample is sampled for % MC check from the top, middle and bottom trays and will be reported

22

Conti
In case of any deviation inform to department head for necessary action Document the deviation details Deviation is acceptable or not will be decided -if yes -if not

23

Conti
Acceptance criteria The reduction in moisture content after drying should be as per the specification in the BMR % RSD of LOD should not be more than 6 % The equipment should produce intended outputs with respect to quality & quantity consistently

24

Conti
Revalidation Criteria: The equipment shall be revalidated if; Location of the equipment is changed. There is change of spare/ parts, major maintenance or breakdown that have a direct effect on the performance of the equipment At normal revalidation schedule.

25

PROCEDURE FOR DRYING EFFICACY STUDY IN FLUIDIZED BED DRYER: Ensure the cleaning of machine Load the wet mass in the FBD product container Set the process time & outlet temperature and run the FBD. After completion of drying take out FBD bowl and collect the sample At least 2.0 gm of sample is sampled for % MC check from the top, middle and bottom trays and will be reported

26

Conti
Sampling Procedure: Ware nose mask, hand gloves before sampling. Label the sample bag with details as Product name, stage, date, time and sign Collect app. 2.0 gms of dried material composite sample in poly bag as per location shown Record the details of analysis.

27

Validation of Tray dryer


28

TRAY DRYER

29

TRAY DRYER CONTROL PARAMETERS


Fixed
Trays

Variable (monitor)
Inlet/exhaust air temperature Product temperature Drying time Air volume Humidity of incoming air Humidity of exhaust air

Response (Test)
Particle size distribution Densities Loss on drying Assay

30

INSTALLATION QUALIFICATION(IQ)
Procedure: Selection criteria shall be defined and based on specific function to be carried out by the machine & its efficiency. Requirement of accessories shall be decided & listed out. Supplier or manufacturer selection

31

Conti
Purchase Details: The purchase order no. & date shall be checked The accessories & their spare parts if any shall be checked as per purchase order The delivery period shall be as per purchase order Supplier or manufacturer name & address shall be checked Any deviation observed should be informed to the supplier or manufacturer

32

Conti
Details of the Equipment Equipment name, make & model no. shall be noted down In-house identification no. shall be allocated Location for installation shall be decided Utilities required shall be listed down

33

Conti
Installation Procedure: After checking all the specifications as mentioned in the selection criteria, service engineer of the manufacturer shall be called for commissioning, if necessary. Authorized validation team shall carry out installation Department Head of production, QA & engineering shall evaluate installation report

34

Conti
Acceptance Criteria For IQ Fulfill the selection criteria & its purpose of Application The equipment shall be as per purchase order Accessories received shall be as per purchase order Should meet pre-selected design parameters Manufacturer/supplier shall provide complete equipment manual Material of construction shall be as per purchase order

35

OPERATIONAL QUALIFICATION (OQ)


Training record Before initiating OQ ensure that SOP for Cleaning and operation of Tray dryer is available.

Purpose: To train the qualification team for performing OQ

36

Conti
Procedure Initiate the actual operation of the TD to ensure that machine is operating within specification. Check the OQ parameters against their specifications. Observe the functioning of all controls available on control panel Record the observation

37

Conti

Acceptance criteria All operating inputs provided on the equipment when tested shall-successfully comply -meet tolerance limit The equipment should successfully perform when operated as per SOP Critical gauges/indicators provided on the equipment--calibrated The equipment when operated shall not - produce abnormal sound - show any discrepancy in its smooth operation.
38

PERFORMANCE QUALIFICATION(PQ)
To check Heat Distribution by placing 10 thermocouples in geometric pattern with the TD Shell and empty Product Container without any load to ensure heat distribution in the drying chamber Heat distribution study will be performed at +45 C and +105C for one hour after achieving the temperature on the controlling sensors to ensure proper heat distribution.

39

Conti
Procedure After completion of OQ initiate the PQ of TD The effectiveness of drying will be qualified by determining reduction of % moisture content in drying process. 3 batches/ lots of any product will be taken for PQ of TD At least 2.0 gm of sample is sampled for % MC check from the top, middle and bottom trays and will be reported

40

41

Conti
In case of any deviation inform to department head for necessary action Document the deviation details Deviation is acceptable or not will be decided -if yes -if not

42

Conti
Acceptance criteria Temperature difference between all thermocouples and set temperature should not differ by more than 5 C. The reduction in moisture content after drying should be as per the specification in the BMR % RSD of LOD should not be more than 6 % The equipment should produce intended outputs with respect to quality & quantity consistently

43

REFERENCES
Berry I.R., and Nash R.A., Pharmaceutical Process validation second edition, revised and expanded; Marcel Dekker series; 83-110.

44

SEMINAR OPEN FOR DISCUSSION