Foundation Preparation and Foundation Treatment in dams

Types of Dams
Gravity dams.
Concrete Gravity dams Masonry Dams R.C.C dams

Embankment dam.
Earthen dams Rock fill dams Rock fill dam with U/s membrane

Arch dam. Buttress Dam. Other dams

Causes of Failure of Dams


OVERTOPPING FOUNDATION OTHERS

29% 53% 18%

Dam Foundation requirement

Foundation is the lower most part of the Dam which transmit the load from the dam safely to the rock stratum. Dam foundation requirements are based on the type of dam proposed and is largely dependent on the strength, deformation, and permeability characteristics of site materials. To determine the depth of excavation needed to achieve an adequate foundation, observation of site conditions in borings and test pits, field testing of soil and rock, laboratory testing of representative samples and, ultimately, design analysis is needed.

Terminologies Related to Dam Foundations


Grouting: A process of pouring or injecting grout in the joints, hollows, cracks, faults, shattered zones or fracture zones, etc. Lugeon: The Lugeon is the unit of permeability Which is most popular and relevant unit for grouting purposes
1 lugeon unit = 1 liter of water taken per meter of test length, per minute, at 10 bars pressure

Pattern: Arrangement of holes in plan and vertical section. Drainage: It is the disposal of surface and seepage water in the abutments, foundation and the body of the Dam. Shear Key: A longitudinal trench in the foundation of concrete/ masonry dam and backfilled with concrete in order to increase the resistance against sliding.

Foundation Investigations

The Shear Strength Permeability of each Material The Deformation Modulus to define the deformation of the foundation. Depth of Over burden Joint pattern Fold Orientation, etc. These parameters can be Determined by Surface or Sub-Surface explorations

Foundation Problems
Most of the dams have to be built on complex foundations requiring special treatments. Various types of geological features encountered are:

1. 2. 3. 4.

Faults Shear Zones Shear Seams Shattered/Highly jointed rock 5. Foundations with more than one type of rock with different properties

6. Folds 7. Buried Channels 8. Jointing pattern of the rock mass 9. Caverns/Cavities 10. Springs etc.

Faults and Shear zones

A fault or fault line is a planar fracture in rock in which the rock on one side of the fracture has moved with respect to the rock on the other side.

A shear zone or shear is a wide zone of distributed shearing in rock. Typically this is a type of fault but it may be difficult to place a distinct fault plane into the shear zone. Shear zones may form zones of much more intense foliation, deformation, and folding. En echelon veins or fractures may be observed within shear zones.

Foundation Problems
Those Geological features can cause 1. Mechanical problems leading to excessive stress concentrations, deformations, stability problems etc. 2. Hydraulic problems like possibility of piping below the dam along the weak features such as faults, shear zones etc. 3. Sliding stability problems along shear seams/joints etc.

Foundation Problems (Faults)

Shih-Kang spillway weir damaged by 1999 Chi-Chi earthquake: Spillway openings 17 and 18 destroyed by fault movement

Effect of fault movement on Shih-Kang dam: Detail of destroyed spillway openings 17 and 18

Foundation Problems

Concrete dams are more susceptible to damage from differential settlement than embankment dams, Conditions are most severe where the foundation comprise materials with different moduli. For the condition shown in Fig-(A) , differential settlement can induce stresses in the concrete. And elastic and non- elastic behavior of rocks causes permanent deformation of the foundation caused by cycles of reservoir filling and emptying Fig (B). Fig - (A) FIG (B)

Foundation Problems
Rock Foundation:

Most natural and induced cavities develop in soluble rocks, most notably limestone, dolomite, gypsum, and rock salt. Typical karst conditions develop in lime stones and dolomites by solution-widening of joints and bedding planes caused by flowing ground water. Eventually, his process develops into a heterogeneous arrangement of cavities with irregular sinkholes occurring where cavity roofs have collapsed. The amount of solution that occurs in limestone and dolomite would be negligible in the lifetime of a typical project. Hence, existing cavities are the major concern. Gypsum and anhydrite are less common than lime stones, but they have the additional concern of solution and collapse or settlement during the useful life of a typical structure. Flow of ground water, particularly to water supply wells, has been known to dissolve gypsum and cause collapse of structures.

Foundation Preparation for Gravity Dams

Generally a considerable length of area needs to be excavated to enable the various operations to go on continuously. Excavation of foundation for concrete spillway and similar overflow structures should be carried out to the desired depth and concrete should be laid on sound rock.

Excavation within 500 mm of the foundation grade should be done just before concrete is laid on sound rock and should not be allowed to remain exposed for long time. In case the geological exploration indicates existence of faults, shear or weak zones, necessary treatment of the foundation should be carried out before laying the concrete.

Section Along Dam Axis


520 510 500 490 480 470
474.3519

NSL

ROCK LINE

NSL

460
126.7527 219.7000 127.8992

450 440
8

ELEVATOR SHAFT BREAST WALL TOP OF DAM


EL.423.80 EL.420.80

ELEVATOR SHAFT

STAIR CASE
4 1

ROCK LINE

430 420 410 NSL

EL.423.80

EL.420.80

EL.417.20

1
EL.414.20 EL.411.20 EL.409.40 EL.406.40 EL.404.60

2 CJ

25.0000

NSL
EL.406.00 EL.404.80

21 CJ
EL.406.00

24
EL.419.00

22
EL.406.00 EL.406.00

23
EL.406.00

EL.415.60

EL.412.80

EL.409.40

EL.409.40

EL.406.00

EL.401.60

400 390

EL.399.80

EL.396.80

CJ 3 CJ 4
EL.371.80 EL.368.40 EL.368.40

20
EL.396.80 EL.393.40 EL.388.80 EL.385.40 EL.385.40

EL.401.40

EL.400.20

EL.396.80

EL.394.00 EL.393.40

EL.390.00

EL.390.00

EL.388.20

EL.385.20

EL.382.20

380 370 360 350 340 330 320 310 300 290 280 270 260 DATUM 250

FOUNDATION GRADE

GUIDE WALL

19
EL.382.00 EL.378.60 EL.378.60 EL.375.20 EL.375.20 EL.371.80

EL.382.00

EL.379.20

EL.376.20

EL.374.40

EL.372.60

EL.369.00

EL.365.40

EL.362.40

EL. 362.89
EL.365.00 EL.363.40 EL.360.00 EL.359.60 EL.360.00 EL.356.60 EL.356.60 EL.356.20 EL.356.20 EL.354.80 EL.354.80 EL.352.80 EL.352.80

EL.365.00

ROCK LINE

EL.351.40

EL.351.40

EL.349.40

EL.349.40

EL.348.00

EL.348.00

EL.344.60

EL.344.60

EL.341.20

EL.341.20

CJ
EL.337.80 EL.334.40 EL.334.40 EL.331.00 EL.331.00 EL.330.00 EL.329.00 EL.329.00

EL.346.00

EL.346.00

10

11

12

13

14

15

16

17

18
EL.339.20 EL.335.80 EL.335.80 EL.332.40 EL.332.40 EL.330.00 EL.329.20

EL.342.60

EL.342.60

EL.339.20

EL.337.80

FOUNDATION GRADE GUIDE WALL

EL.325.60

EL.325.60

EL.325.80

EL.325.80

EL.322.20

EL.322.20

CJ
EL.315.40 EL.312.00 EL.309.40 EL.306.40

CJ

CJ
EL.319.00 EL.315.60 EL.309.20 EL.309.20

EL.322.40

EL.322.40

EL.318.80

EL.318.80

EL.319.00

EL.315.40

EL.315.60

EL.312.20

NSL
EL.303.00 EL.300.00 EL.300.00 EL.300.00 EL.296.60 EL.296.60 EL.296.80 EL.293.20 EL.293.20 EL.293.40

EL.305.80

EL.305.80

EL.303.00

EL.302.40

ROCK LINE

EL.289.80

EL.289.80

EL.287.60

EL.286.40

EL.286.40

EL.285.20

EL.284.00 EL.283.20 EL.283.00 EL.283.00

EL.281.80

ROCK LINE

EL.279.60

EL.279.60 EL.278.80

EL.276.20 EL.275.40 EL.274.80

EL.273.00 EL.272.60 EL.271.80

EL.271.80

EL.270.60

EL.269.00

EL.267.60 EL.266.80

EL.267.40

EL.265.80 EL.265.40

INSPECTION GALLERY FOUNDATION GRADE

508 500 490 480

460 450 440

420 410 390 380 370 350

320

310

320

330

400

410

420

430

440

450

460

470

340

350 360 370 380

390

480 490

ELEVATION(m)

391.37 396.97 402.94 409.54

417.90

426.94

441.67

485.52

498.30

358.50

370.85

381.47

509.83

521.56

535.78

552.86

DISTANCE(m)

585.22 589.99

608.56

00.00 3.82 8.89 15.31

43.99 48.09 52.81 58.90 64.56 70.16

23.34 29.33 33.55

78.52

90.83

500

Foundation Preparation for Gravity Dams

Blasting operation should be carried out carefully without affecting the rock mass beyond the required area of excavation and shall be restricted to minimum 500 mm above the foundation levels and at least 30 m away from any existing structure. However, in special cases the blasting may be carried out at a distance of less than 30 m from any existing structure using controlled blasting. If necessary, field tests may be carried out to decide various parameters of controlled blasting. It is desirable to keep the foundation slope upwards in downstream direction

Foundation Preparation for Gravity Dams

Immediately before placing concrete/ masonry, all surface of foundations upon or against which the concrete/masonry is to be placed, should be free from standing water, mud, debris, organic deposits, and other foreign material which may prevent a tight bond between the rock and concrete/masonry. All surfaces of rock upon or against which the concrete/masonry is to be placed should be clean, solid and free from all objectionable coatings, sand loose, semidetached or unsound fragments and should be sufficiently rough to ensure satisfactory bond with the concrete/ masonry.

Foundation Preparation for Gravity Dams

Foundation Preparation for Gravity Dams

Stepping in the foundation should be avoided and a continuous foundation profile provided . The slope in foundation grade should not exceed 45. If the foundation grade has a slope greater than 45 suitable berm has to be provided. Whenever the foundation is sloping steeply and shear zones, faults and other weak layers exist in the foundation, necessary treatment of the foundation should be carried out before laying the concrete.

Foundation Preparation for Gravity Dams

Foundation Treatment Against Sliding


The following measures are usually taken to improve the Sliding resistance of dam Foundation Roughening of Base. Provision of Shear Key. Upstream Sloping of Dam base. Use of Anchors. Use of Mat Foundation. Providing Buttress Structure. Struts bearing against sound rock ledge on the Down stream side. Adopting a Slightly arched arrangement of the dam.

Shear Key

Rock Anchors

Treatment of Fault and Weak Zones

Faults and weak zones exist in most rock formations, their size, Continuity and orientations are important factors in determining the suitability of a foundation for any dam. Type of Fault Low- Angle Faults (Dip angle < 450) Problem to Foundation Providing Inadequate Sliding Resistance Treatment
1. Excavating

out the weak material 2. Providing Shear Keys 3. Use Rock Anchors
1. Dental

High Angle Faults (Dip angle > 450)

The main problem is that of Bridging over of the Structure and the resulting Stress Concentrations

treatment 2. Providing Seepage Cutoff on U/s 3. Use Rock Anchors

Dental Treatment for Faults and Seams.

Very often the faults, shear seams or shattered zones met with after excavation extend to such depths that it is impracticable to clean them out entirely. These conditions require special treatment. Stress concentrations may occur in the dam due to the presence of such low modulus zones. To minimize the build up of stresses in the dam, a portion of the weak zone is replaced by concrete. The procedure for reinforcing and consolidating such weak geological features is frequently called Dental Treatment. These seams are excavated to a depth sufficient to produce elastic qualities (stresses/ strains /deformations) and bearing strength nearly equal to the values (both in the dam and foundation) had such seams not been present in the foundations.

Dental Treatment for Faults and Seams.

Based on theoretical studies carried out for Shasta and then for Friant dams, USBR has developed the following approximate formulae for determining the depth of concrete plug: d = 0.0066 b H + 1.5 d = 0.3 b + 1.5 for H > 46 m for H < 46 m

where, H = Height of the dam above foundation level in m b = width of the weak zone in m d = Depth of excavation of weak zone below surface of adjoining sound rock for providing concrete plug in m.

Dental Treatment for Faults and Seams.

Dental Treatment for Faults and Seams.

Other measures
In swelling rocks hold down piers and tensioned rock anchors are used to reduce heave due to rock swelling

Grouting and Drainage Provisions for Foundations


The principal purpose of grouting is to fill openings in a foundation and render it impervious to percolating water. It is also used to improve the strength and elastic properties of the foundation material into which it is injected. The method of grouting, in large measure, depends upon the nature of treatment to be given to foundation materials which, in turn, depends upon the geological features. For details of grouting for foundation treatment, reference may be made to IS 6066 : 1994.

Grouting and Drainage Provisions for Foundations

Consolidation Grouting - For filling up the joints, cracks, crevices etc. and there by making the foundation homogeneous.

Grouting and Drainage Provisions for Foundations

Curtain Grouting - For making a curtain to cutoff/ minimize

seepage

Grouting and Drainage Provisions for Foundations

Drainage arrangements - To drain off seepage water and thus reduce uplift. Some rules in this respect are

Grouting and Drainage Provisions for Foundations


Consolidation Grouting :

Holes at 3-6 m c/c 6 m to 15m deep, Normal to dam - rock interface

Curtain Grouting : As per IS 11293 (Part 2): 1993 The depth of grout curtain depends upon the type and conditions of the rock mass with respect to its permeability. The following empirical criteria may be used as a guide which is based on going practice.

D=2/3 H +8 D= Depth of the grout curtain in m, and H= Hydraulic head Holes at 3.0 m c/c

Grouting and Drainage Provisions for Foundations

Location: a water supply dam for Los Angeles, California, USA.

Name: St Francis Dam

THIS DAM COLLAPSED! It had unsuitable foundation rock, and it was NOT GROUTED! It was built in 1924-26, before the need for grouting was understood. Max height = 205ft [63m]

Foundation And Abutment Preparation of Dams

The Foundation and Abutment preparation of Dams Can be Explained Under the Following Headings, 1. Earth foundations. 2. Rock Foundations. 3. Abutment Treatments.

Earth Foundations

The design of dams on earth foundations is based on the in situ shear strength of the foundation soils. Foundation preparation usually consists of clearing, grubbing to remove stumps and large roots in approximately the top 3 ft, and stripping to remove sod, topsoil, boulders, organic materials, rubbish fills, and other undesirable materials. It is not generally necessary to remove organic-stained soils. Highly compressible soils occurring in a thin surface layer or in isolated pockets should be removed. After stripping, the foundation surface will be in a loose condition and should be compacted. Note : If a silty or clayey foundation soil has a high water content and high degree of saturation, attempts to compact the surface with heavy sheep-foot or rubber-tired rollers will only remold the soil and disturb it

Earth Foundations (Cont.)


Stump holes should be filled and compacted by power-driven hand tampers. For dams on impervious earth foundations not requiring a cutoff, an inspection trench having a minimum depth of 6 ft should be made. This will permit inspection for abandoned pipes, soft pockets, tile fields, pervious zones, or other undesirable features not discovered by earlier exploration. Differential settlement of an embankment may lead to tension zones along the upper portion of the dam and to possible cracking along the longitudinal axis in the vicinity of steep abutment slopes at tieins or closure sections. To minimize this possibility, steep abutment slopes and foundation excavation slopes should be flattened, if feasible, particularly beneath the impervious zone of the embankment

Rock Foundations

Rock foundations should be cleaned of all loose fragments, including semidetached surface blocks of rock spanning relatively open crevices. Projecting knobs of rock should be removed to facilitate operation of compaction equipment and to avoid differential settlement. Cracks, joints, and openings beneath the core and possibly elsewhere should be filled with mortar or lean concrete according to the width of opening. The excavation of shallow exploration or core trenches by blasting may damage the rock. Where this may occur, exploration trenches are not recommended, unless they can be excavated without blasting. Where core trenches disclose cavities, large cracks, and joints, the core trench should be backfilled with concrete to prevent possible erosion of core materials by water seeping through joints or other openings in the rock.

Rock Foundations (Cont.)

Where an earth dam is constructed on a jointed rock foundation, it is essential to prevent embankment fill from entering joints or other openings in the rock. Shale foundations should not be permitted to dry out before placing embankment fill, nor should they be permitted to swell prior to fill placement. Limestone rock foundation may contain solution cavities and require detailed investigations Where faults or wide joints occur in the embankment foundation, they should be dug out, cleaned and backfilled with lean concrete This type of treatment is obviously required beneath cores of earth and rock-fill dams and also beneath rock-fill shells.

Abutment Treatment

The principal hazards that exist on rock abutments are due to irregularities in the cleaned surfaces and to cracks or fissures in the rock. Cleaned areas of the abutments should include all surfaces beneath the dam with particular attention given to areas in contact with the core and filters. It is good practice to do both a preliminary and final cleanup of these areas. The purpose of the preliminary cleanup is to facilitate inspection to identify areas that require additional preparation and treatment. Within these areas, all irregularities should be removed or trimmed back to form a reasonably uniform slope on the entire abutment. Overhangs must be eliminated by use of concrete backfill beneath the overhang or by barring and wedging to remove the overhanging rock.

Abutment Treatment (Cont.)


Concrete backfill may have to be placed by shotcrete, gunite, or similar methods to fill corners beneath overhangs. Vertical rock surfaces beneath the embankment should be avoided or, if permitted, should not be higher than 5 ft, and benches between vertical surfaces should be of such width as to provide a stepped slope comparable to the uniform slope on adjacent areas. Relatively flat abutments are desirable to avoid possible tension zones and resultant cracking in the embankment, but this may not be economically possible where abutment slopes are steep. Flattening of the abutment slope may reduce the effects of rebound cracking (i.e., stress relief cracking) that may have accompanied the development of steep valley walls. The cost of abutment flattening may be offset by reductions in abutment grouting. The cost of foundation and abutment treatment may be large and should be considered when selecting dam sites and type of dam.