Sie sind auf Seite 1von 54

Contents

Sr. No Topics
I Concept & Need of an International Logistics Park
II Concept of Regional Hub & Demand & Supply
III Mumbai Region - Bhiwandi Emerging Warehouse Hub
IV Operational Challenges Bhiwandi Warehousing Hub
V Renaissance Logistic Park A Snapshot
VI Key Learnings & Best Practices
VII Client Expectation & Needs Satisfaction
VIII Business Proposition & Way Forward

Global Logistics Industry (LI) Scenario
Page 4
Global Logistics Industry (LI) = US$ 3500 billion
Indias Logistics Industry (LI) = US$ 66 billion
Indias LI % to Global Industry = 1.90 %
International Logistics Performance Index (LPI)
LPI depends upon the following areas:
1. Infrastructure : Quality of trade & transport related infrastructure
2. Logistics competence : Competence and quality of logistics
services
3. Timeliness : Timeliness in shipments in reaching destination within
the scheduled or expected delivery time
4. Tracking & Tracing : Ability to track & trace consignments
5. International shipments : Ease of arranging competitively priced
shipments
6. Customs : Efficiency of clearance process
Rank Country
1 Germany
2 Singapore
7 Japan
8 U.K.
15 U.S.A.
27 China
47 India
Source: World Bank LPI Survey 2010
International Spends on Logistics Management
Country
Logistics Spending
(% of GDP)
3
rd
Party Logistics
(% of total movement)
US 9.50 % 57 %
Japan 10.50 % 80 %
UK 11.00 % 68 %
China 18.60 % < 10 %*
India 13.00 % < 10 %
Lower the % of logistics spent to GDP, better is the logistics management

Higher % of 3PL shows a higher share of organized players

Developing countries spend excess on logistics management

* China exception to rule due to geographical conditions

Global Logistics Industry (LI) Scenario
Present Logistic Market
of India FY 2009-10
Particulars
Present F.Y.2009-10
% Share (US $ in Bn) (Rs. In 000' Cr)
India's Total Logistic Market 100% 125.00 625.00
Organized 6% 7.5 37.5
Unorganized 94% 117.5 587.50
Particulars
Future F.Y.2012-13
% Share (US $ in Bn) (Rs. In 000' Cr)
India's Total Logistic Market 100% 135.00 560.00
Organized 14% 18.90 94.50
Unorganized 86% 116.10 580.50
Expected Logistic
Market of India for the
F.Y. 2012-13
Indias LI Scenario
Page 7
Organised LI in India
6%
94%
India's Total Logistic Market
Organized
Unorganized
Need of the hour : International Quality of Logistics Parks
Without this vital infrastructure, the cost of Logistics Industry will also stay higher
& the efficiency will be low.
Share of organised LI in India : 6%
4
34
54
0
10
20
30
40
50
60
India US Europe

Potential Regional Hubs in India
JLL Warehousing Hubs Mckinsey High Growth (Production-
Consumption) Clusters
1 NCR NCR
Mumbai Mumbai Pune - Nashik
3 Bangalore Bangalore - Mysore
4 Kolkata Kolkata
5 Chennai Chennai
6 Hyderabad Hyderabad
7 Pune Mumbai Pune - Nashik
8 Ahmedabad Surat - Ahemdabad
9 Surat Surat - Ahmedabad
10 Goa
11 Chandigarh
12 Kochi Kochi Trivendrum
13 Vishakhapatanam Vizag - Kakinada
14 Nagpur
15 Coimbatore Coimbatore Salem
Logistic Parks Demand Factors
Major Demand for Logistics comes from:
Industrial Activity
Automobile Industry
Electronics & Electrical Industry
Textiles Industry
Machine & Engineering
Chemical & Pharmaceuticals
Food Processing Industry
Manufacturing SEZs
Agricultural
Retail Sector
EXIM Cargo

Demand Parameters in Top 8 Locations
S.N. Location Demand Factors
1.
NCR Delhi
Industry (Auto, Textile, Electronics, Machine &Engineering, SEZs),
retail, & agriculture
2.
Mumbai
Industry (Electronics, pharma, textiles, auto -components), retail,
agriculture, EXIM cargo
3.
Chennai
Industry (Auto, electronics, textiles, SEZ), retail, EXIM cargo
4.
Kolkata
Agriculture, EXIM, retail
5.
Bangalore
Industry (Electronics, textile, auto), retail, agriculture
6.
Hyderabad
Retail, industry (Pharma)
7.
Pune
Industry (electronics, auto, textile/garment), retail
8.
Vishakhapatanam
EXIM cargo, industry (Chemicals & pharma, SEZ), agriculture
Supply Scenario of Logistics Space
S.N. Place/ City
Number of CWC
Warehouses Number of ICD/ CFS
1 NCR Delhi 25 12
2 Mumbai 18 30
3 Chennai 4 20
4 Kolkata 11 7
5 Bangalore 7 3
6 Hyderabad 1 2
7 Pune 2 2
8 Vishakhapatanam 4 4
554016
1015123
94545
182098
104136
20285 29378
114730
0
200000
400000
600000
800000
1000000
1200000
Total CWC Capacity in 8 Locations
(MT)
Establishment of ICDs/CFSs
offer advance logistic
facilities and play important
role in organized logistic
activity
CWC is the biggest player in Logistics sector with
operations from Agri-warehouses to ICDs


Key Logistics Hubs in MMR
Established
/Emerging
Logistic
Hubs in
Mumbai
Averag
e
Rentals
Rs/ Sq
Ft/
Month
Land Cost Rs in
Crores/ Acre
Bhiwandi 13 1.00
Panvel 17 2.00
Taloja 20
Trans Thane
Creek
Rasayani 16
Patalganga 15
Main Users / Sectors of the Proposed Product
SN Sectors % Share
1 Textile Sector 6%
2 Automobile Sector 32%
3 FMCG Sector 18%
4 Pharma Sector 14%
5 Cement Sector 4%
6 IT Sector 16%
7 Other 10%
Total 100%
Focus: Bhiwandi City
Current Market Trend Of Rental Rate Of
Warehousing Complex In Bhiwandi
Warehousing Complex Rent Per Sq.Ft.
A Grade Warehouses Rs.15 Rs.18
B Grade Warehouses Rs. 11 Rs.14
C Grade Warehouses Rs. 8 Rs.10
Buyers Segment / Key Players In Various Industries
Courier Industry
Bludart
First flight
AFL
DTDC
Overnight
Professional Courier
Warehousing Industry
CWC
DHL logistics
AFL
Om Logistics
Safex
Delhi Assam
Roadways
Patel Roadways
DHL
Schenker BAX
Semb Corp
Panalpina
Agil Freight Logistics
Air Express
Bluedart
Gati
Road Express
Gati
Safexpress
TNT
TCI
Source : CII Report, World Bank Survey, Report by Cushman and Wakefield, REC, ASSOCHAM Survey
Buyers
Segments/
Players in
various
Industries
Focus: Bhiwandi Warehousing Hub
Future Demand
13%
2%
22%
13%
50%
Future Demand for Warehouses for Year 2010-2015
Switchover of Corporate from
illegal Warehouses in Bhiwandi
Agro & Industrial Need for
Warehouses
Retailing Sector Need for
Warehouses
Export & Import (Cargo Handling)
Need for Warehouses
Total Warehouses Space
Demanded in Bhiwandi Sector
Switchover of Corporate
from existing Illegal Warehouses
SN Particulars
Area in Mln
Sq.Ft.
1 Switchover of Corporate from illegal Warehouses in Bhiwandi 15.00
2 Agro & Industrial Need for Warehouses 2.40
3 Retailing Sector Need for Warehouses 25.00
4 Export & Import (Cargo Handling) Need for Warehouses 15.08
Total Warehouses Space Demanded in Bhiwandi Sector 57.48
SN
Industrial
Sectors
Area in
Lac
Sq.ft.
I Agriculture 8.67
II Metal 2.40
III Chemical 1.00
IV Petrochemical 7.58
V Pharmaceutical 0.09
VI Cement 3.92
Total ( I to VI ) 24.00
Converted into
Million Sq.Ft.
2.40
Future Demand
Agro & Industrial need for Warehouses 2010 - 15
Particulars
No. of
Units
Warehouse Space
Required (Mln sq.ft.)
Need in Mumbai &
MMR Region
(Mln Sq.Ft.)
Retail : WH = 1 : 0.50 20%
Shopping Malls 225 45.00 9.00
Hyper Market 280 14.00 2.80
Dept. Stores 400 10.00 2.00
Super Market 3,200 40.00 8.00
Mega Specialty
Stores
1,200
6.00 1.20
Exclusive Brand
Outlets
20,000
10.00 2.00
Total 125.00 25.00
Allowance of FDI in Retail sector (Single brand & Multi-brand), number of Malls, Hypermarkets,
Supermarkets will increase in the coming years.
Leading Corporates like Pantaloons (Big Bazaar), TATA (Westside), Reliance (Hypercity), Bharti
Retails, Rahejas (Shoppers Stop), Reliance Retails, DLF Shopping Malls, Bata, Archies,
Crossword and other global players are in the foray.
Retail market is growing at 20%- 25% p.a.
Future Demand
Retail Sector need for Warehouses 2010 - 15
Addl. Coastal Cargo Handling Space required 150 Lac Sq. Ft.
Addl. Air Cargo Handling Space required 0.76 Lac Sq. Ft.
Total Area 15.08 Mln Sq. Ft.
Future Demand
Export & Import (Cargo handling) need for Warehouses 2010 - 15
India has the vast coastline of 7,517 Kms
95% of Indias foreign trade by volume involves sea transportation
45 other non major/ private ports are being modernized urgently to make Indian goods competitive in the
international market.
Reduction in tax (Import duty, Ad-volerum Duty, Port Charges) will give a tremendous boost to cargo
handling traffic
Rising Globalization and Increased International Trade between the countries, WTO, and the new SAFTA
agreement signed between the SARRAC countries will boost the import and export of the country in the future years.
Along the 720 km coastal line of the Maharashtra State, two major ports, namely Mumbai Port Trust (MbPT) and
Jawaharlal Nehru Port Trust (JNPT) at Nhawa-Sheva are in operation
Total Space Req. = 1 Tonne : 6 Sq.Ft.

Major Issues faced by Operator
in Bhiwandi Warehousing Hub
S.N
1 Absences of Legal and
Marketable title for
warehouse
Non-compliance of
Development control
rules & legal
approvals
Absence of planned
complex
Absence of Infra &
Utilities of world class
levels
2 No common facilities
& amenities in
warehousing complex
Substandard
warehouse building
with broken floor.
Cracked walls,
heating, dusty
environment etc
Non-compliance
Building for modern
facilities like Racking
system, forklifts, dock
leveler etc
Local issues of various
monopoly of varia,
local transport, labour
supply, security etc
3 Non-compliance of
fire & safety norms
hence loss of
insurance cover
No human Interface in
terms of toilets,
restrooms, food
courts hygiene
Water logging
flooding & termites
Insects pests creating
lot of goods lost
No specialised
facilities for
temperature control ,
cold storage, chemical
storage high cost
good storage in strong
room etc.

Master Plan - Renaissance
Project Summary Sr. No
Particulars Description
A
Project promoted by Special
Purpose Vehicle
Renaissance Infrastructure
B Type of Project
376 acres of Integrated Warehousing and Industrial
Complex
- Standard Warehousing complex of 120 acres
- Green Industrial Complex of 80 acres
- BTS Warehouse complex of 62.5 acres
- BTSIndustrial Complex of 95 acres + 9 acres
Commercial spare of 9 acres
C Green Industrial Units
138 Units - Each 6,250 sq ft Small plot with building
24 Units - Each 18,750 sq ft large plot with building
1360 Units - Each 2065 sq ft Industrial gala
D Warehousing Capacity
27 buildings
2 million sq. ft. area
3 lac million metric tonnes storage capacity
Unique Selling Propositions
Assurance
1 First 100% Legal Warehousing complex in Bhiwandi
2
The project is promoted by the Special Purpose Vehicle(SPV) and is being developed
under the approvals granted by Central and State Government to SPV
3
All land rights are in the name of SPV, further transferred to buyer ensuring 100% title
legality
4
The complex is master planned, designed and executed by PMC approved by
Government of India
What makes Renaissance Warehousing Business-class?
Contd

Business Class Facilities
1 The superior warehousing facilities speed up the throughput time and efficiency of the
business operations from checking into terminals, docking unloading, loading, palletizing
and checking out.
2
46 ft. exclusive road for every building with 68 ft. main road and 121 ft. (8-lane-one way)
circular loop road around the entire complex
3
The complex comes with world-class exclusive common facilities:
Inbound and outbound truck terminal
HRD training centre
Food courts, commercial complex, trade centre
Warehouse support services outlets
Logistics equipment and service centres
Goods storage, trading and display support services
4
The complex will have all MIDC equivalent facilities of roads, water distribution, power
supply, drainage, security system and fire fighting system
5 The fire fighting station located within the complex
6
The complex will be professionally managed by a dedicated Operations and Management
team headed by the CEO
Contd
Business Class Design
1 All 27 buildings of the warehousing complex are branded world-class PEB structures
2
The new warehouse structure has exclusive features of building insulation, air-conditioned,
racking compliance and exclusive road for each warehouse building with controlled access
3
Screwless, standing seam roofing (SS 2000): Puncture- free roof system, roofing system is
designed to handle expansion and contraction of the sheets during high temperature
variations and avoiding corrosion
4
FM II (TR34) compliant flat floor for safety, precision, wide and narrow aisle racking
arrangement. Strong reinforced, abrasion crack and dust resistant floor designed for
racking and forklift loading
5
Poliginus reflective insulation: Heat insulated (reduction of 7C when outside temperature
is 45C plus), fire retardant, improves work efficiency and offers safer storage of goods.
6
Pallet compliant flooring: The warehouse layout (length, breadth and height) is compliant
to positioning of heavy duty racking system and designed to maximise the number of pallet
positions
7 Continuous canopy of 6 m over-hung with Soffit
Location
Location of Future
Ring Road MMR Plan
Location Plan
1
2
Proposed Ring Road - MMR Plan

Location Map
100% Marketable Title & Freehold
Property
Step 1 to 6 to make property 100% marketable to freehold
SPV transfer the title to the buyer or purchaser
1
2
Project Land & Approvals

World Class Infra
Road Section
Traffic Management: Facilitating Business
Facilitating a smooth flow: Our world-class traffic management systems are strategically
planned to ensure that your goods move business-class. The terminals, wide central
roads, directional guides, signages, inter-connected roads leading to warehouse and
other units are planned for smooth flow and hassle-free movement.
S.N
A Truck Terminal C Entrance Management
The truck terminal has been designed
considering the length of the containers (60 ft.,
40 ft. and 30 ft.), with a parking capacity of 100
trucks.
For every truck which enters, the security checks for
vacant space in the respective warehouse. Trucks
will be permitted to enter the premises only if there
is room else will be instructed
to be parked in the truck terminal until availability
of space in that warehouse.
B Facilities in Truck Terminal D Security Post
a. Canteen / Mess
b. Driver Dormitory
c. Shops
Each entrance has a security cabin responsible for
screening all
the vehicles entering, coordinating on the
availability of space
with the warehouse in-charge and directing them
towards the
truck terminal or the respective warehouse.
Contd

S.N
E Vehicular Movement G Traffic Flow Management
One-way movement of all trucks
Two loop roads to facilitate movement
of the vehicle internally (in case of
wrong turns)
Internal signage assisting smooth
vehicular movement
One-way traffic for incoming vehicles
Efficient traffic management staff
controlling the traffic flow
F Road System
121 ft. central complex road (8-lane,
two-way)
68 ft. main road (4-lane, one-way)
46 ft. warehouse internal road (one-
way)
Industrial tonnage cement concrete
road
Road illuminated with sodium
vapour lamp
Loop road for quick movement in
case of a wrong turn
41.75% of land area is road
Built-to-Suit: Provisions & Possibilities
At the Renaissance warehouse, our structures have been designed in a manner that allows us to
incorporate certain additions as per your unique business needs. For example, if your wares
need temperature control, you require a ceiling higher by a couple of meters. At the Renaissance
warehouse, there are various such possibilities along with the trust of getting the additions done
through the same expert team that has designed this world-class structure. Below is a
comprehensive list of built-to-suit provisions and possibilities over and above the standard
elements.
S.N Elements Customization possibilities
1 Height Standard ceiling height: 8 m
Built-to-suit provision: Height can be extended up to 10 m
2 Racking Built-to-suit possibility: Racking can be created with various financial
options
3 Flooring Standard Flooring: M25 grade, 150 mm thick, steel fibre reinforced
concrete (SFRC), Dry Shake Hardener with Liquid Surface Hardener
(LSH)
Built-to-suit possibility: Depending on the business need, flooring with
greater weight-bearability can be created
Contd
S.N Elements Customization possibilities
4 Mezzanine Built-to-suit possibility: Mezzanine floor can be created as per the
occupiers need
5 Air Conditioning Built-to-suit possibility: In case the wares require temperature
controlled environment, the same can be created on demand
6 Cold Room Built-to-suit possibility: Walk-in cold room can be created
7 Office Space In case the occupiers need to use a portion or the unit for office
purpose, the same can also be designed and created in a fully-
functional format depending upon the needs
8 Light Standard offering: The structure comes with 265 lights
Built-to-suit provision: More lights can be added as per the need
Our warehouse is compliant with various business types, including:
Pharmaceutical Industry
3 PL & 4 PL Logistic
Studio
Low cost IT
Agricultural Warehouse

Contd
S.N Elements Built-to-suit options Value Generation
1 Interiors - Office &
Toilet Design
Provision of office at entrance of the
warehouse.
Customization
2 Changing & Locker
Room
Toilets at entry side of the warehouse
for executives and at exit side for labor
and drivers
Customization
3 Mezzanine Floors Provision of changing & locker rooms
for workers
Provision of mezzanine floors of
required size for office purpose, as per
requirement
Customization
4 Heavy-duty Racking
System
Provision of racking system - pallet
location - 11457 nos.
Customization
5 Dock Levelers Provision of dock leveler for easy
loading and unloading, as per
requirement
Customization
6 Air-conditioning Provision of air-conditioning of required
tonnage
Customization

S.N Critical issues Problems Learning / Best practice
1 Fragmented ownership
of land
Consolidation of land Local facilitator / Aggregator having in
depth understanding and relation in
village
2 Defective title No marketable title Comprehensive title search since 1957
(day), court search, forest search etc
3 Title holder not having
possession
No possession of land Strong local team with surveyor having
understanding of land possession
4 Land approvals Non transferability of
land
Local connect from collector office to
talathi inhouse team of experienced
people to follow through & get complete
approval
5 Local Mafia Stopage of work Local Influential people part of land
acquisition parcel to manage
Locating & Land Acquisition
of Logistics Park
Approvals
of Logistics Park
Correct Land
Use
Violation of zone
- Industrial Zone
- Location clearance
Development
Control Rule
Compliance
FSI Violation
(Illegal property)
Additional FSI/Higher FSI
Environment &
State Pollution
Control Board
Pollution &
complete
disregard for
environment
Environmental clearance
MPCB content to establish product
Water, Power,
Communication
Boring water,
load shedding &
power cuts
Water supply from irrigation
Express feeder (non load shedding line)
Local Approvals
NA/ Deemed NA
Grampanchayat NOC
T.P. Plan Approval (as applicable)
Design & Engineering
of Logistics Park
Graded land must to super flat floor
High quality of sub bare must
Vastu compliant stop of land
Contour, soil quality, slop of land
Always master plan the logistic park on International paramenters in terms of Roads planning,
utilities planning, environment plan, vastu compliance in terms of entrance, Building facing etc
Master planning of Logistics Park
Highway class road lanes, storm water drainages, transportation plan & traffic networking, WTP &
Water supply network, STP & Sewages Netwok etc
Infra & Utilities Design
Build Plan & Design
Food courts Dhaka,Truck Terminals, Dormitories
Common facilities & Amenities
Centrally located open space & landscaped area
Open space & Landscaping
Best & experienced contractors to execute projects, flooring contractor, PEB Structures
Engineering & Contracting
Page 45
Development
of Logistics Park
S.N Ideal steps to follow the development of Logistics park
1 Earth work to achieve desired level - 2 to 3 meter above high flood line (HFL)
- Nothing coordinates to create a grid for Vastu Compliance
- All Building at zero degree
2 Road & storm water network through the
complex
- Highway class lanes
3 Utilities corridors & Ducts - 3 to 4 meters utilities corridors
4 Locating WTP, STP, UG tanks, Fire station - Continuous source of water (Ideal from irrigation department)
- STP to recycle water for irrigation & Flushing
- Fire fighting system, fire station & CFO compliance certificate
5 - Centrally located open spaces & landscaped areas
- At least 10% as open space
- 5% common facilities & amenities
- Common facilities & amenities location
6 Standard building & Built to Suit plots - International standard for warehouse building
- Plotting out area for building in project
7 Optimise FSI Utilisation - Specialised contractors to execute specialized job
8 - Always reside people around complex travelling is most energy draining
activity
- Residential Complex for work to work with all township amenities
Local Issue Management

Critical issues Problems Learning / Best practice
Varai Monopoly of Loading and
unloading by locals
1. Create local representative bodies
2. Laid out policies for non interface by locals
3. Take land on joint development & made
properties for letting out for villages
4. Created fix compensation for village
development
Labour supply Monopoly of Labour supply 1. Labour contractor with license & compliance on
market driver pricing
2. Objective to provide services to occupier
3. No monopoly in labour supply
Local transport Monopoly of local transport 1. Transportation in local
2. Tempo station on market driven pricing
3. No monopoly
Security Monopoly of security 1. Creates 3 to 4 security licensed agency within
village to provide services on market driven
pricing & with quality of services
2. No monopoly
Local employment Fixed percentage of employment
compulsory
1. HRD centre to train people on logistics skill
2. Create semi skill & skill employment for use of
equipments & assembling
Operation & Maintenance
Issues Problems Learning & Best Practices
Quality of Infra Bad quality Design & Build to last for decades
Quality of Utilities Non - reliability
Create & build most reliable utilities i.e. water
supply, electric system, sewage system, wages
system, drainage system, fire fighting
Common facilities & amenities
Human interface ignored - Lack of
Restrooms, Food areas,
Dormitories, Provision stores
Very human centric master plan & complex use
plan, creating sweet-spots around the complex &
keeping it clean & usable
Warehouse Structure &
Maintenance
Broken flooring, leakages, fire,
water-logging, insects heat
World class flooring complying FM standards
Standing sun roof
Insulation
Fire-fighting system
Operation Management &
Facilities Absence of professionalism
Professional & skilled facilities management
company
Run Logistics Park as a service operation like
hotel, hospital

Critical issues for client
Page 49
S.N Critical issue for client in operation of
warehouse
Learning (Best practice)
1 Flooring of warehouse - FM: Compliant, International certified flooring
2 Leak proof roofing - Standing seem (Screwless roofs)
3 Docking Bays with Dock levelers - 1.2 meters Docking bay with dock levelers
4 Security gates & gated complexes - Two level gated complex with security system
5 Truck terminal - 5 to 7% of area dedicated for truck terminal
6 Fire fighting system & Insurance
compliance
- CFO Compliance & Certification
7 Local issue - Local committees & fixed payments
8 Availability of skill & semi-skilled labour - HRD centers local population to be trained to be employable
9 24 x 7 operation - Commutation facilities for 24 x 7 & residential facilities within
complex
10 Heating & humidity in summer - Insulation, Righ vents, Turbo Ventilation
11 Flooding & Water logging - 3 to 4 meters above HFL, effective storm water drainage
Page 50
S.N Critical issue for client in operation of
warehouse
Learning (Best practice)
12 24 x 7 Power - Express fidder, back up generator
13 Solid waste & unclear - Solid waste management & regular cleaning through facilities
management
14 Fast turnaround time - Excellent road, clear traffic movement, equipment loading &
unloading, Highspeed connectivity
15 Human Interface in term of clean toliets
etc
- Public toilets, foot path, bus shelters, sitouts
16 Hygiene Food - Food courts lunch home, restaurants
17 Recreation to loose Fat - Club facilities, Recreation grounds, gardens
18 Traffic swift mobility - Signages, location standies, instruction boards
19 Area for commerce - Marketing centre, Exhibition Area, hotels Factory outlets.
20 Maintainance of warehouse building
equipment
- Professional team for facilities management
Critical issues for client

Business proposition & Way Forward
Standard Building Built-to-Suit
Lease Lease
Ready for Possession 4.5 lac sq ft Ready to Build 15 lac sq ft
Area under
construction
10.00 lac sq ft BTS under Negotiation 10 lac sq ft
Sale Sale
Area under
construction for sale
3.0 lac sq ft Ready to be sold under
BTS
10 lac sq ft
Properties at Renaissance Logistic Park Bhiwandi
Bhiwandi , MMR
Demand
Supply

Demand

Supply

Total Warehouses Space Demanded

57.48

Total Industrial Space Demanded

53.71

Total Industrial Township Demanded

48,130

Total Warehouses Supply by RI

6.83
Total Industrial Park supply by RI
5.65

Total Industrial Township supply by RI

22,500
Mn Sq. Ft.
Mn Sq. Ft.
Mn Sq. Ft.
Mn Sq. Ft.
No. of Accommodation
required
% of RIs Supply to
total Demand
No. of
Accommodation
available
12%
11%
47%
Demand Supply Analysis
Thank You

Das könnte Ihnen auch gefallen