Beruflich Dokumente
Kultur Dokumente
Consultation Meeting
12 November 2009
Legend Hotel Villas, Mandaluyong City
LAGUNA LAKE DEVELOPMENT AUTHORITY
Laguna de Bay
Institutional
Strengthening and
Community
Participation Project
LISCOP –
5-yr development initiative of LLDA
Harness and
deepen
stakeholders
’
participation
in micro-
watershed
environment
Mission No. 2
Implement direct
and
strategic micro-
watershed level
interventions that
would contribute
towards
improvement of
the quality of the
Laguna de Bay
and its watershed
Mission No. 3
Strengthen LGU’s
self-governance
and reinforce
inter-LGU
cooperation in
the
environmental
The 34 Pipeline Sub-Projects in 22 municipalities
generated from 15 out of 24 micro-watersheds
which have undergone LEAP
= Covered subprojects
SUB-PROJECTS IN RIZAL PROVINCE
= Covered subprojects
Tanay Micro-Watershed Enhancement Sub-Project (P 30.6 M)
Key Components:
Streambank stabilization
Flood Control
Ecological enhancement
Reforestation
Livelihood
Coop Formation
Pollution management
MRF
Rehab of dumpsites Katutubo Village
Pavilion
Status: Operation
Teresa MRF w/ Composting Sub-Project (P
8.1 M)
Production Area
Status: Operation
Morong MRF with Composting Sub-Project ( Php
9.9 M)
Admin Bldg
Production Area
Status: Operation
Baras Flood Control Sub Project (P
10.0 M)
Status: Construction
Stage
Taytay Flood Control Sub-Project ( Php
10.0 M)
Status: Construction
stage
(1)Angono Material Recovery Facility (Php 11
M) and (2) River and Lakeshore Protection Sub-
Projects
= Covered subprojects
Kalayaan Integrated Solid Waste Management Sub-Project
(P 11.2 M)
Status: 100%
completed Testing
Status: Operation Stage
Stage
Majayjay Falls Eco-Tourism Sub-Project (P
34.8 M)
Administration Building
Hanging bridge
Status:
Operation
Siniloan Environmental Enhancement
Sub-Project (Php 4.0 M)
Status: MRF:Pre-Operation
Stage
Nagcarlan Integrated Waste
Management Sub-Project ( Php 5.0
M)
ACCESS ROAD
MRF
MRF
WWTF
MRF Site
Status: Construction
Pakil Environmental Enhancement Sub Project (P
10M)
Eco-tourism Site
MRF Site
Status: Construction
SUB-PROJECTS IN CAVITE PROVINCE
= Covered subprojects
GMA Cluster Material Recovery &
Composting Facilities Sub-Project (P
16.6 M)
Status:Construction Stage
TYPES OF SUBPROJECTS
Waste Management = 25
STATUS OF BATCH 1 SUB-PROJECTS
100
90
80
70
60
% Accom 50
40
30
20
10
0
1 2 3 4 5 6 7 8 9 10 11
No. of LGUs
100
90
80
70
60
% Accom 50
40
30
20
10
0
1 2 3 4 5 6 7 8
No. of LGUs
4 Sub-projects = COMPLETED
3 Subprojects = SUBSTANTIALLY COMPLETED
2 Sub-projects = PRE CONSTRUCTION
Upcoming Projects
MRF with Composting: 3
Paete :P 5M
Antipolo : P 24 M
Lucban : P 17 M (with WWTF)
Flood Control: 1
Angono River and Lakeshore
Stabilization : P 17 M
STATUS: Approved by
the MDFO
Paete: SPAR for
LISCOP Incentive
Package
Micro-Watershed Management Plan
Capacity Building
Laguna Province:
San Pedro
Alaminos
Lumban
Rizal
Bay
Paete
Mabitac
Calauan
Magdalena
Pangil
Pila
Batangas Cavite:
Majayjay
Silang
Malvar Carmona
Requirements from LGUs to be
Eligible for LISCOP Funding
1.Letter of Intent (LOI),
2.Passage of a Sangguniang Bayan Resolution
expressing its commitment and support to
implement the sub-project,
3.Social acceptance of the sub-project/proof
of consultation,
4.Borrowing Capacity, and
5.Proof of land ownership thru valid land
documents
Financing Scheme
Green and Blue Sub-Projects
Reforestation, watershed protection, river and shore protection
Municipalities
Loan Grant Equity
Cities 80 0 20
40 50 10
Financing Scheme
Brown Environment
Solid waste management, drainage, sewerage and sanitation support projects
Cities/Municipalities
Loan Grant Equity
Cities 80 0 20
45 40 15
3rd & 4th
40 50 10
Sub-Project Appraisal and
Approval
DOF
PGB
LLDA
MDFO LISCOP - PCO
LGUs
CTRG
DOF – Department of Finance
PGB – Policy Governing Board
MDFO – Municipal Development Fund Office
PCO – Project Coordinating Office Communities
CTRG – Consolidated Technical Review Group
Welcome
to the
LISCOP
family!
For more information, contact: