NOUR MW

Projects
Presented to:
Saudi Telecom Company STC
Mobile Network Department
Presentation Contents
Clients and Suppliers
Introduction to MW Turnkey Implementation
Capabilities
Completed MW Projects
Projects Summary
Question Session
Clients & Suppliers
Nour completed several MW Projects through large
Manufacturers and Solution Providers, such as, Lucent
Technologies International, Ericsson, Nokia and Motorola
Nour utilized the MW Equipments from HARRIS, NERA,
ERICSSON, NOKIA, ALCATEL, P-COM and DMC
Nour completed the mentioned variety of projects for several
clients such as, Saudi Telecom Co., General Intelligence
Department, Public Security Directorate, Qatars Ministry of
Interior, Saudi Border Guard Forces, Saudi Consolidated
Electric Company, Ministry of Defense & Civil Aviation and
much more.
MW TURNKEY
CAPABILITIES
Site & LOS
Survey
MW
Design
MW
Installation
& Testing
As-Built
Document
Production
System
Integration,
Operation,
Maintenance &
Optimization
Civil Major &
Minor Design,
& Construction
Complete
Administrative,
Engineering &
Skilled Stuff
Site & LOS Survey
Green Filed Site Survey: for availability of Main Power &
suitability of Site-Lot for civil construction
Existing Site Survey: for availability of Floor Space,
Communication Channels, DC Power, Sizing the HVAC,
Tower Survey with existing loads, etc.
Line-of-Sight Survey: to verify the connection possibility
between the two sites under study utilizing DGPS Survey Set
Documentation: to gather all the collected information and to
introduce a Basic Analysis of sites suitability
MW Design
Verify the possible connectivity by means of Collected
Data along the path using Differential GPS, and to
compare it with the Digital Maps Data-Points as well
Finding the most suitable Antenna Heights and Mast
Height
Design Optimization by suggestion of Space Diversity,
Frequency Diversity, Passive Repeaters, Passive
Reflectors, etc.
MW System Installation, Power-up and Commissioning
MW System Testing (Connectivity and Stability Tests) over
standard periods to ensure the Application of Design Criteria
and to suggest necessary Corrective Action or Optimization
MW Network Management System Installation, especially
the FarScan of Harris MW Radios
MW Installation & Testing
Major Civil Design
Site Layout Design
Tower Analysis and Suggestion of Reinforcement (if necessary)
Electrical Network Design for Grounding, Power
Connectivity, Lightning Protection, etc.
Minor Civil Design
Antenna Mount and Feeder Gantry
Upgrading of Existing Sites to house the new equipment
Ability to Design a Roof-Top Site
Civil Constructions
A Complete Site Construction, including Foundation
Casting, Tower Erection, Equipment & Generator Shelters
Erection, Site Fencing and Electrical Network Preparation
Shelter Preparation and Testing at Nour Warehouses
As-Built Documentation
It is being prepared throughout the Construction and
Installation Process to Document any changes
As-Built Document is considered the most important
document in the Hand-Over Stage, Hence, it is Checked
carefully and its Softcopy is saved on CD-Archives
Operation & Maintenance
Specialized Engineers and Technicians to Operate and
Configure the Various Network Elements.
All the Necessary Test Equipment for Fault Finding and
Rapid Maintenance
Team Capability of Integrating the various elements to the
Networks Management System
Equipment and Skills to Monitor the Site Performance for
Preventive Maintenance
Nour Offices are distributed in different cities of the
Kingdom, to ensure quick response to customer needs
Completed MW Projects
1- MW Backbone Network for Saudi PSD (West)
2- MW Backbone Network for Saudi GID (West)
3- MW Network for Riyadh PSD (Central)
4- MW Network Upgrading for Lucent Technologies
5- Junction MW Network for Saudi Telecom Co.
6- MW Connectivity Links for GSM Base Stations of
Lucent, Ericsson & Nokia Sites
MW Network for PSD (West)
Client: Public Security Directorate
Location: Makkah, Jeddah and Taif
Period: 1998
MW Equipment: Alcatel PDH Radio
Frequency Band: 2 and 4 GHz
No. of Hops: 12 Hops
Job Description:
MW System Design
MW Installation, Testing & Commissioning
Complete MoP and As-Built Documentation
MW Network for GID (West)
Client: General Intelligence Department
Location: Makkah, Jeddah and Taif
Period: 1999
MW Equp.: Harris Quadralink 4 T1 PDH Radio
Frequency Band: 2 GHz
No. of Hops: 7 Hops
Job Description:
MW Installation, Testing & Commissioning
Complete MoP and As-Built Documentation
Installation and Setup of Harris FarScan NMS
MW Network for PSD (Center)
Client: Public Security Directorate (Central)
Location: Riyadh
Period: 2000
MW Equipment: Harris Microstar PDH 4E1
Frequency Band: 7 GHz
No. of Hops: 6 Hops
Job Description:
MW Installation, Testing & Commissioning
Complete MoP and As-Built Documentation
Installation and Setup for Harris FarScan NMS
MW System Upgrading
Client: Lucent Technologies International
Location: Kingdom Wide
Period: 1999
MW Equp.: Harris Microstar PDH Radio 16E1
Frequency Band: 7, 15, 23 and 38 GHz
No. of Hops: More than 120 Hops
Job Description:
Software Upgrading for 1+1 Protected System
Complete Documentation and Inventory
Junction MW Network for STC
Client: Saudi Telecom Co. ( Through LTII )
Location: Kingdom Wide
Period: 1997 up to 1999
MW Equipment: NERA SDH STM-1 Radio
Frequency Band: 6 and 11 GHz
No. of Hops: 64 Hops
Job Description:
MW System Design and Optimization
MW Installation, Testing & Commissioning
Complete Frequency Plan, Interference Analysis, Propagation
Survey, MoP and As-Built Documentation
Setting-up the Space Diversity Delay Cable, Adjusting Group
Delay (ATDE) and Optimizing Diversity Spacing
Passive Repeater Alignment
GSM MW Connectivity (1 of 2)
Client: Saudi Telecom Co. (Direct Contracting)
Location: Kingdom Wide
Period: 2000 up to Present
MW Equipment: Microstar (Harris), Flexihopper (Nokia),
Tel-link (P-COM) and Mini-link (Ericsson) PDH Radios 4, 8
and 16 E1
Frequency Band: 7, 15, 23 and 38 GHz
No. of Hops: More than 500 Hops
GSM MW Connectivity (2 of 2)
Job Description:
Line-of-Sight Survey (Preliminary Design Step)
MW Documentation and Preparation of PAT Documents
Procurement of Materials (Radio, Cabling, Data Rack, etc.)
MW Systems Swap (low capacity to higher one)
Complete MW System Installation, Alignment, Panning and
Configuration
Alignment of Passive Repeaters
Performing Fade Margin and Stability Test.
MW Hop Testing (PAT to customers satisfaction)
System Handover to O&M Department
Questions & Answers Session