Beruflich Dokumente
Kultur Dokumente
O ME TO
WELC
EDRI
2008.
EDRI Contents
1
3 Who is EDRI?
2008
EDRI Profile
2008
EDRI Profile
2008
EDRI Profile
2008
EDRI Evolution of EDRI
1964
1966
1983
1988
2008
EDRI Branch Offices
2008
EDRI Branch Offices
北京
大连
天津
南京
上海
深圳
Shanghai Office
2008
EDRI provided services for the following companies
EDRI
2008
Certified project design license (Class A and Class B)
EDRI
2008
Business license
EDRI
2008
Urban planning certificate
EDRI
2008
Environmental pollution prevention and
EDRI treatment project design certificate
2008
Intelligent building system design certificate
EDRI
2008
EDRI Class A turn-key general contractor certificate
2008
EDRI Class A project supervision license
2008
EDRI Class A project consultation license
2008
Pressurized pipeline design certificate
EDRI
2008
Environmental impact assessment certificate
EDRI
2008
Certificate of conformity of quality management system
EDRI certification
2008
ISO 14001
Certificate of conformity of environmental
EDRI management system certification
2008
OHSMS
Certificate of conformity of occupational health
EDRI and safety management system certification
2008
Insurance policy
EDRI
EDRI
EDRI is
isinsured
insuredby
byThe
The TaiPing
TaiPing Insurance
Insurance Company
Company Ltd.
Ltd. for
forits
its design
design works.
works.
2008
EDRI 2
1
3 Who is EDRI?
2008
EDRI Service domain
Public Works
Infrastructures
Building Constructions
15%
Mechanical Engineering
2008
EDRI Type of services
Project management
Design and engineering
Procurement
Construction
2008
EDRI The services provided by EDRI
Project strategy
Project proposal
2008
EDRI Scope of consulting works
Project strategy
Project proposal
Effectively transfer know-how
Site selection plan
2008
EDRI The services provided by EDRI
Concept design
Engineering
Engineering design Preliminary design
Detail design
2008
EDRI Scope of services - design
From conceptual design to the detailed design of your highly complex project, we will contribute our
wide range of skills and special know-how to implement your ideas. A good design will be the first
element of the successful project.
2008
EDRI The services provided by EDRI
Project design
Building
Building construction
construction Construction management
General
General contracting
contracting
Quality control
Cost control
Progress control
Project supervision
2008
EDRI Scope of services - construction
As a general contractor, EDRI will coordinate and supervise all different parties in your project. We
will take a good management on the scheduling and cost control to assure the highest quality.
2008
EDRI 3
1
3 Who is EDRI?
2008
SMIC 12 Inches Wafer FAB8 Project
EDRI
2008
General Electronic Project
EDRI
2008
Liquid Crystal Display Project
EDRI
2008
Optical Fiber and Cable Project
EDRI
2008
EDRI Nutritional, Biological and Pharmaceutical Projects
Shenzhen
Shenzhen Kexin
Kexin Biological
Biological Product
Product Co.,Ltd
Co.,Ltd
2008
EDRI Civilian projects
Total
Total floor
floorarea:
area: 178,530
178,530 m2
m2
2008
Si-Chuan New Water Town Development
EDRI
Total
Totalfloor
floorarea:
area: 65,000
65,000 m2
m2
2008
DIAMOND Ltd. In India
EDRI
2008
Yun-Nan Waterside Park
EDRI
2008
Le-Shan Riverside Townhouse Project
EDRI
2008
EDRI Cheng-Du City Forest Development
2008
Easy Mart Plaza Development
EDRI
2008
Mian-Yang Hai-Tang Garden
EDRI
2008
Beijing Motorola Research Center
EDRI
Total
Totalfloor
floor area:
area: 98,000
98,000 m2
m2
2008
Qu County New Town Urban Planning
EDRI
Total
Totallot
lot size:
size: 50,000
50,000 km2,
km2, Total
Totalfloor
floor area:
area: 4,100,000
4,100,000 m2
m2
2008
Procter & Gamble Technology
EDRI Beijing Technical Center
2008
EDRI 4
1
3 Who is EDRI?
2008
EDRI Project Execution Plan
Detail
Detail
Basic
Basic Engineering
Engineering Construction
Construction
Engineering
Engineering
2008
General project flow chart and major deliverables
EDRI
Project schedule
Organization chart
( Continue 待续 )
2008
General project flow chart and major deliverables
EDRI
(PRELIMINARY DESIGN)
Revise design
parameters
SHOP DRAWINGS SUBMITTALS Installation design and
material approved
Detailed design
BOM (75%)
INSTALLATION
ON SITE Installation completed
Revise design
parameters
As-built document
COMMISIONING TRAINING,
CERTIFICATE
Certificate protocols
Filed Engineering
2008.