Shifting of 3 G

Node-Bs on IP
media
IMPLEMENTATION
PLAN
25-06-11 NWP-1 CM 1
Agenda
Overview of Node-Bs
Node B - RNC Connectivity (at present)
Media Status of Node B.
Introduction to 3G NW on IP Media.
Types of RNC Connectivity
Types of Node B Connectivity
OAM Connectivity
Synchronization in 3G NW
25-06-11 NWP-1 CM 2
Electrical FE I/F
FE over STM-1 Optical I/F
Overview of Node-Bs
Node B

4 / 8 E1 to RNC
Unchannelised STM1
25-06-11 NWP-1 CM 3
NODE B BBU _ WMPT CARD MODULE
FE0 PORT: Fast Ethernet Electrical
Max Speed 100Mbps
Connector Type RJ45

FE1 PORT: Fast Ethernet Optical
Max Speed 100Mbps
Connector Type
LConnector
SFP module Required

FE0 & FE1 PORTS CAN BE USED FOR
CONNECTING NODEB TO IP NETWORK
E1
25-06-11 NWP-1 CM 4
Node B supports following connectivity

E1 /STM1 CONNECTIVITY
ELECTRICAL FE CONNECTIVITY
OPTICAL FE CONNECTIVITY
.
Supports Single mode & Multi Mode Fibers
= 1310 nm / 850 nm
Tx power = -15 to - 8 dBm for 1310 nm / -9.5 to -2.5 dbm for 850 nm
Rx sensitivity = -31 dBm for 1310 nm / -17 dbm for 850 nm
Upto 10 Kms range for 1310 nm & upto 100 meters for 850 nm
25-06-11 NWP-1 CM 5
RNC supports following connectivity

ATM (STM 1) CONNECTIVITY



OPTICAL GE CONNECTIVITY

.
Supports Single mode Fibers
= 1310 nm
Tx power = -9 to - 3 dBm for 1310 nm
Rx sensitivity = - 20 dBm for 1310 nm
Upto 10 Kms range for 1310 nm
Supports both Unchannelised & Channelised STM1

25-06-11 NWP-1 CM 6

EXISTING 3G NETWORK DIAGRAM


NODE B
GGSN
RNC
SGSN
4 E1
STM1-
1+1
GE 1+1
NIB NW
8 E1
GE 4+0
Gi I/F
Gn I/F IuPs I/F
Iub over
ATM I/F
Iub over IP I/F for
14.4 Mbps speed
to be modified as
25-06-11 NWP-1 CM 7
Node B - RNC Connectivity (at present)
Node-B

Node-B Location
T
X
E
Q
P
T
Exg. CPE-8 /
OFC
FE I / F
CPE-8 / CPE 21
OFC / MW / 34
Mb/ADM1/ ADM4/
MADM
OF I / F or Eth I / F
OF I / F or Eth I / F
E1s
E1
O
S
N
M
U
X
E1s
E1 Cable
R
N
C
A
O
U
G
O
U
STM1
OF
Cable
MAIN TE Bldg
T
X
E
Q
P
T
FROM OTHER
NODE-B
LOCATIONS
STM1
STM1
25-06-11 NWP-1 CM 8
Node B - RNC Connectivity (at present)
Summary of Existing Connectivity between Node-Bs and RNC

At present , Node-B E1s connected to CPE-8 / CPE-21 / MW Mini link / 34Mbps
system / STM1 / ADM 4 / MADM equipments by E1 cables or OF cables.

This Node B CPE transmission equipments in turn connected to Nearby
Telephone Exchange Transmission equipments by OF cable.

It is further Extended to Main Telephone Exchange Transmission Centre.
Other node-B sites of respective SSA/SDCA are aggregated at Main Exchange
DTC Room where RNC is available.

Further all the E1s are aggregated in Huawei OSN MUX installed at TXN Room

The aggregated optical STM1 output extended to AOU board of RNC equipment.

25-06-11 NWP-1 CM 9







MEDIA STATUS OF NODE B

25-06-11 NWP-1 CM 10
Total No of RNC Commissioned 13.

Total No of Node Bs planned 1126

(1053 CITY, 66- RW, 1- TC,6-COW)

Out of 1126 Node-Bs,
-- 699 are working on OFC.
-- 354 are working on MW Mini link




25-06-11 NWP-1 CM 11
Node-B's & its transmission media / equipment details for 14.4 Mbps speed
Sl No SSA Name
Colocated
/Optical
Tie
OFC with MADM/
ADM 16 OFC with CPE-8
OFC with CPE-
21
OFC with
ADM 4
/
ADM1/
others
Total No of
Node-B's
working in
OF Media
Node-B's working in
MW Media,
MLLN - 15
GHz Mini link
,etc
Total No of
Node-B's
under
each SSA
1 Coimbatore 0 18 55 60 13 146 104 250
2 Coonoor 2 0 2 7 3 14 4 18
3 Cuddalore 1 1 0 7 6 15 13 28
4 CRDA 2 5 13 2 0 22 12 34
5 Dharmapuri 1 2 17 8 5 33 18 51
6 Erode 1 2 26 4 8 41 12 53
7 Karaikudi 1 4 10 5 4 24 10 34
8 Madurai 0 6 13 0 0 19 108 127
9 Nagercoil 0 6 2 12 2 22 3 25
10 Puducherry 1 2 10 14 1 28 8 36
11 Salem 4 8 15 6 21 54 63 117
12 Thanjavur 0 0 20 3 3 26 8 34
13 Tirunelveli 2 0 3 11 7 23 9 32
14 Trichy 1 9 47 16 20 93 59 152
15 Tuticorin 1 3 21 2 4 31 0 31
16 Vellore 0 7 12 31 9 59 22 81
17 Virudhunagar 0 5 4 2 1 12 11 23
TOTAL 17 78 270 190 107 662 464 1,126
25-06-11 NWP-1 CM 12
RNC-Node-B Details


Sl No RNC
Location
Serving
SSA
# of Node-B on OFC
1 CBE-SBC(A4) CBE, CNR CBE:99, Ooty:7,CNR:4
2 SLM-MEY(A3) SLM SLM:57,NAM:10
3 DPI-MAIN-
E10B(A2)
DPI DPI:9,HOS:10,KRI:8
4 ERD-TE(A3) ERD ERD:36,TRU:51
5 TR-DTAX(A3) TR TR:68,ARY:2,PAU:2,KRU:13,PDK:10
6 MA-EN 1(A2) MA MA:10 , THENI:8
7 MA-EN 2 (A2) MA KODAI:2, MA:9, DDG:15
25-06-11 NWP-1 CM 13
RNC-Node-B Details-2


Sl No RNC Location Serving SSA # of Node-B on OFC
8 VLR-TE(A2) VLR VLR:23,TV MALAI:8
9 TNJ-TE(MC)(A2) TNJ,KMB TNJ:22,TVR:6,,KKL:2,KMB:14,NGP:7
10 KKD-DTAX(A2) KKD KKD:13,SVG:4,RMN:6, RMM:1
11 TT-DTAX(A2) TT,VGR TT:29,VGR:7, SVK:4
12 TVL-MW(A2) TVL,NGC TVL:27,NGC:15,KK:2
13 PY-TE(A2) CDL,PY PY:28, CDL:12, VLU:3
25-06-11 NWP-1 CM 14







Introduction of 3G Node B on IP
Media





25-06-11 NWP-1 CM 15
Introduction to 3G NW on IP Media.
At present vendors have provided 3.6 Mbps
speed in 3G Network by connecting each
Node B with RNC on 4/8 E1s. Now they are
implementing 14.4 Mbps speed in network by
updating Hardware/Software/opening codes in
the existing network.
In order to achieve 14.4 Mbps speed in all the
three sectors of the Node-B simultaneously, it
is necessary that backhaul connectivity
between Node B and RNCs is shifted on IP
Media from present ATM connectivity.
25-06-11 NWP-1 CM 16
Introduction to 3G NW on IP Media.
For this, connectivity at the RNC end is
required to be changed to GE interface
instead of STM-1(ATM).
The GE connectivity from RNC end is
to be established as follows for Node-B
IP connectivity.
1. RNC-NIB Tier1 Node.
2. RNC-MADM Transmission N/W


25-06-11 NWP-1 CM 17
Introduction to 3G NW on IP Media.
For this ,connectivity at the Node B end is
required to be changed to FE interface
instead of E1. The Node B FE interface will
be extended to RNC in following ways,
1. Node B - NIB Tier1/ Tier 2 Node- RNC.
2. Node B - MADM Transmission NW- RNC.
3. Node B FTTH NIB Tier 1/2 RNC.
4. Node B - FE to 8 E1/16 E1 Convertor-
MADM Tx NW- RNC.

25-06-11 NWP-1 CM 18





Advantages of Iub Over IP I/F

1.Ethernet can provide higher bandwidth.
2. Cheap and better economy of scale.
3. Efficient transport.





25-06-11 NWP-1 CM 19







Types of RNC Connectivity


1. RNC-NIB Tier1 Node.


25-06-11 NWP-1 CM 20
GOUa board (Active
Card)
GE OPTICAL LC
TYPE
CONNECTOR
GE OPTICAL LC
TYPE
CONNECTOR
TOWARDS
NODE B
NIB Tier 1 / 2
Router or MADM
Note : Standby card to be connected to Router B
GOU Board status

A4- CBT- 3 +3

A3 TR,SLM, ERD-2+2

A2- MA,TVL,TT,DPI,PY,
VLR,TNJ,KKD-1+1
25-06-11 NWP-1 CM 21
GE optical cable towards
Router
G
O
U
a
G
O
U
a
FE optical cable or FE
Electrical cables towards
Router
GE OPTICAL OR FE
ELECRICAL CABLES FOR 2 IP
CLOCK SERVERS
TO NODEB WMPT CARD
EXISTING 3G
M2000
SERVER
RNC 6810
PUDUCHERRY
Interface GOUa : 1+1 Active /Standby
Connecter Type In RNC:GE OPTICAL (LC
)
8 optical patch cords required for GOUa to
Router Path
4 optical Patch cords required for IP clock to
Router
BSNL NIB NW (RPR)
Tier 1 Node
Tier 2 Node
25-06-11 NWP-1 CM 22
RNC-NIB Tier1 Node GE
Connectivity.
For this connectivity the minimum requirements to be
met by BSNL are:
1. GE port (1+1) at NIB Tier 1 end.
2. 4 Optical patch cards for 1 GE connectivity is to be
extended between RNC and NIB Tier1 node.
3. RNC supports 1310 nm SFP for GE connectivity and
suitable SFPs may be arranged at NIB end .
4. After the physical connectivity, a separate VLAN Group
has to be created for the same.

25-06-11 NWP-1 CM 23
RNC-NIB Tier1 Node GE Connectivity done at
Puducherry

Both RNC and Tier 1 are co-located in the same floor in
different Switch rooms. OF Patch Cable of length 50
meter used between the nodes with LC type at both
ends.
1+1 GE interfaces extended between RNC and Tier1
Node.
Though different wavelength (1310 nm at RNC end & 1550
nm at NIB Tier I end) SFPs are used, it is working fine
and data rate also verified, since the receiver in both
ends will normally be wideband but the range will be
limited to the lower wavelength.


25-06-11 NWP-1 CM 24







Types of RNC Connectivity


2. RNC- MADM TRASMISSIONNETWORK

25-06-11 NWP-1 CM 25
Interface GOUa : 3+3 Active /Standby
Connecter Type In RNC:GE OPTICAL
(LC )
GE optical cable towards
Router
G
O
U
a
G
O
U
a
G
O
U
a
G
O
U
a
G
O
U
a
G
O
U
a
24 optical patch cords required for
GOUa to Router Path
4 optical Patch cords required for IP
clock to Router
FE optical cable or FE Electrical
cables towards MADM
System at Thudiayalur TE
GE OPTICAL OR FE
ELECRICAL CABLES FOR 2 IP
CLOCK SERVERS
EXISTING 3G
M2000
SERVER
RNC 6810
Coimbatore
CBT
SBC
MADM
TX NW
CBT
THU
MADM
TX NW
CBT
PEL
MADM
TX NW
CBT
GPY
MADM
TX NW
Node B
MADM
RING NW
25-06-11 NWP-1 CM 26
RNC- MADM Node GE Connectivity
done at Coimbatore.
Both RNC and MADM TX SYTEM are located in the same
building but different floor. OF Patch Cable length 60 meter
is extended between the NEs with LC-FC type at both
ends
2+0 GE interfaces extended between RNC and MADM
System.
CBT SBC Colocated Node B FE extended to MADM (Ring )
system and FE from Remote located Node B at Thudialur
also extended to MADM (Ring ) system (Ring ) and further
aggregated as GE and extended to RNC.
Same wavelength (1310 nm at RNC end & 1310 nm at
MADM end) are used, it is working fine and data rate also
verified.

25-06-11 NWP-1 CM 27





TYPES OF NODE B CONNECTIVITY


1. Node B - NIB Tier1/ Tier 2 Node- RNC.

2. Node B - MADM Transmission NW- RNC.

3. Node B FTTH NIB Tier 1/2 RNC.

4. Node B -- FE to 8 E1/16 E1 Convertor-
MADM Transmission NW-RNC.
25-06-11 NWP-1 CM 28





TYPES OF NODE B CONNECTIVITY


1. Node B - NIB Tier1/ Tier 2 Node- RNC.


25-06-11 NWP-1 CM 29





1. Node B - NIB Tier1/ Tier 2 Node- RNC.

Node-Bs co-located with NIB RPR Tier1/Tier2 Node.

Node-Bs having dark fiber to Nearby Telephone
Exchange / Nearby Tier1/Tier2 . For this connectivity,
1310 nm SFP has to be recovered from UTRP Board in
NODE B and the same may be used for dark fiber
termination at Node B end.

Node-Bs which are built-Up to Nearest Tier1/Tier2
station using CPE-8 systems.

Node Bs Colocated with MADM systems which are
built up to Nearest Tier I / Tier 2 station.




25-06-11 NWP-1 CM 30

Types of Node B Connectivity

NODE B
RNC
NIB Tier
1/2
850 nm SFP used in Both ends
FE Optical Patch Cords
LC-LC Type is
required
Node B Colocated with NIB NW
1550 nm SFP at
Tier I & 1310 nm
SFP at RNC end,
GE Optical LC-LC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
25-06-11 NWP-1 CM 31
Node B Colocated with NIB Tier1
Node FE Connectivity.
For this connectivity the requirements are:
1. FE port (1+1) may be required at NIB Tier 1 end.
2. 4 Optical patch cards for 1 FE connectivity is to be
extended between Node B and NIB Tier1 node.
3. Node B supports 1310 /850 nm SFP and NIB T1/T2
supports 850 nm SFP for FE connectivity . The SFP may
be removed from UTRP Board in Node B end and the same
may be used for Optical FE . SFPs required may be
arranged at NIB end .
4. After establishing the physical connectivity, a separate
VLAN Group has to be created for the same.

25-06-11 NWP-1 CM 32

Types of Node B Connectivity

NODE B
RNC
NIB Tier
1/2
1310 nm SFP used in Both ends
FE Optical, Patch Cords
LC-FC Type is
required
Node B having dark fiber to nearby TE/ NIB
Tier I / II node
1550 nm SFP at
Tier I & 1310 nm
SFP at RNC end,
GE Optical LC-LC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
Nearby
TE
(MADM)
Dark Fiber
GE Optical Patch
cords
From Other Node B FE I/F
25-06-11 NWP-1 CM 33
Node B having Dark fiber with Nearby TE/NIB Tier1
Node FE Connectivity.
For this connectivity the requirements are:
1. Optical FE patch cable is to be extended between Dark
fiber terminated ODF and Node B.
2. The SFP may be removed from UTRP Board in Node B
end and the same may be used for Optical FE .
3. 4 Optical patch cards for 1+1 GE connectivity is to be
extended between Main TE MADM System and NIB Tier1
node. The BW of 50 Mbps for 14.4 Mbps speed and 8 Mbps
for 2G NW may be defined in all the network.
4. After establishing the physical connectivity, a separate
VLAN Group may be created for the same.

25-06-11 NWP-1 CM 34

Types of Node B Connectivity

NODE B
RNC
NIB Tier
1/2
1310 nm SFP used in Both ends
FE Optical, Patch Cords
LC-FC Type is to
be used
Node B having dark fiber to nearby NIB Tier I / II
1550 nm SFP at
Tier I & 1310 nm
SFP at RNC end,
GE Optical LC-LC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
Dark Fiber
Depends on SFP Drive distance.
Ie 1310 nm- maximum of 10 Kms
25-06-11 NWP-1 CM 35
Node B having Dark fiber with NIB Tier1 Node FE
Connectivity.
For this connectivity the requirements are:
1. Optical FE patch cable is to be extended between Dark
fiber terminated ODF and Node B.
2. The SFP may be removed from UTRP Board in Node B
end and the same may be used for Optical FE .
3. B end DF Connectivity is to be extended to NIB Tier1
node. The required SFP may be arranged at NIB end and
the BW of 50 Mbps for 14.4 Mbps speed may be defined in
all the network.
4. After establishing the physical connectivity, a separate
VLAN Group has to be created for the same.

25-06-11 NWP-1 CM 36

Types of Node B Connectivity

NODE B
RNC
NIB Tier
1/2
Node B Colocated with MADM systems to nearest
NIB Tier I / II node using Electrical FE
1550 nm SFP at
Tier I & 1310 nm
SFP at RNC end,
GE Optical LC-LC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
Nearby
TE
(MADM)
Electrical FE
Cable
GE Optical Patch
cords
From Other Node B FE I/F
25-06-11 NWP-1 CM 37
Node B Colocated with Nearby MADM systems to
NIB Tier1 Node FE Connectivity.
For this connectivity the requirements are:
1. Electrical FE patch cable is to be extended between
Node B and MADM Systems in Nearby TE. Further it is
aggregated as GE at MADM systems end and the same GE
link is to be extended to NIB Tier I node.
2. After establishing the same, a separate VLAN Group
has to be created for the same.

25-06-11 NWP-1 CM 38

Types of Node B Connectivity

NODE B
RNC
NIB Tier
1/2
1310 nm SFP used in Both ends
FE Optical, Patch Cords
LC-FC Type is
required
Node B with CPE8 having Electrical FE I/F to
nearby TE/ NIB Tier I / II node
1550 nm SFP at
Tier I & 1310 nm
SFP at RNC end,
GE Optical LC-LC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
CPE 8 at
Node B
end
Electrical FE
GE Optical Patch
cords
Nearby
TE
(MADM)
25-06-11 NWP-1 CM 39
Node B with CPE 8 NIB Tier1 Node FE Connectivity.
For this connectivity the requirements are:
1. Electrical FE patch cable is to be extended between
Node B and CPE 8 Systems at Node-B end.
2. From CPE optical STM1 (with 58 Mbps BW) has to be
extended to Nearby TE MADM systems. Further it is
aggregated as GE at MADM systems end and the same GE
link is to be extended to NIB Tier I node.
3. After establishing the same, a separate VLAN Group
has to be created for the same.

25-06-11 NWP-1 CM 40





TYPES OF NODE B CONNECTIVITY


2. Node B - MADM Transmission NW- RNC

25-06-11 NWP-1 CM 41

Types of Node B Connectivity

NODE B
RNC
Main TE
MADM
1310 nm SFP used in Both ends
FE Optical , Patch Cords
LC-FC Type is
required
Node B Colocated with Main TE MADM SYSTEM & RNC using Optical FE
1310 nm SFP at
MADM & 1310 nm
SFP at RNC end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
25-06-11 NWP-1 CM 42
Node B Colocated with MADM
Systems & RNC - FE Connectivity.
For this connectivity the requirements from BSNL End are:
1. Optical FE port is to be extended to MADM systems working at
RNC Location end.
2. The SFP has to be removed from UTRP Board in Node B end and
the same may be used for Optical FE .
3. GE 1+1 connectivity from MADM system is to be extended to RNC
4. After extending the physical connectivity, a separate VLAN Group
has to be created between MADM GE link and FE link for IP
Connectivity.
5. Same VLAN Group may be used for an additional Node B in that
MADM system.
25-06-11 NWP-1 CM 43

Types of Node B Connectivity

NODE B
RNC
Main TE
MADM
Electrical FE Patch Cable
is required
Node B Colocated with Main TE MADM SYSTEM & RNC using Electrical FE
1310 nm SFP at
MADM & 1310 nm
SFP at RNC end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
Electrical FE is to be used
at Node B End
25-06-11 NWP-1 CM 44
Node B Colocated with MADM
Systems & RNC - FE Connectivity.
For this connectivity the activities required are:
1. Electrical FE port is to be extended to MADM systems
working at RNC Location end.
2. GE 1+1 connectivity from MADM system is to be
extended to RNC.
3. After establishing the physical connectivity, a separate
VLAN Group has to be created between MADM GE link and
FE link for IP Connectivity.
4. Same VLAN Group will be used for an additional Node B
in that MADM system.
25-06-11 NWP-1 CM 45

Types of Node B Connectivity

NODE B
RNC
Main TE
MADM
1310 nm SFP to be used in Both
ends
FE Optical , Patch Cords
LC-FC Type is
required
Node B Colocated with Nearby TE MADM SYSTEM using Optical FE
1310 nm SFP at
MADM & 1310 nm
SFP at RNC end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
Nearby
TE
MADM
Existing OF
Connectivity
25-06-11 NWP-1 CM 46
Node B Colocated with MADM
Systems & RNC - FE Connectivity.
For this connectivity the requirements are:
1. Optical FE port is to be extended to Nearby TE MADM
systems working at Node B Location end.
2. BW for 14.4 Mbps ( 50 Mbps) may be configured in
existing OF connectivity of respective MADM systems.
3. 1+1 GE connectivity from Main TE MADM system is to
be extended to RNC.
4. After establishing the physical connectivity, a separate
VLAN Group has to be created between MADM GE link and
FE link for IP Connectivity.
5. Same VLAN Group will be used for an additional Node B
in that MADM systems.
25-06-11 NWP-1 CM 47

Types of Node B Connectivity

NODE B
RNC
Main TE
MADM
Electrical FE used in Both ends
Node B Colocated with Nearby TE MADM SYSTEM using Electrical FE
1310 nm SFP at
MADM & 1310 nm
SFP at RNC end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
Nearby
TE
MADM
Existing OF
Connectivity
Electrical FE
CAT5 Cables
25-06-11 NWP-1 CM 48
Node B Colocated with MADM
Systems & RNC - FE Connectivity.
For this connectivity the requirements are:
1. Electrical FE port is to be extended to Nearby TE MADM
systems working at Node B Location end.
2. BW for 14.4 Mbps ( 50 Mbps) may be configured in
existing OF connectivity of respective MADM systems.
3. 1+1 GE connectivity from Main TE MADM system is to
be extended to RNC.
4. After establishing the physical connectivity, a separate
VLAN Group has to be created between MADM GE link and
FE link for IP Connectivity.
5. Same VLAN Group will be used for an additional Node B
in that MADM systems.
25-06-11 NWP-1 CM 49

Types of Node B Connectivity

NODE B
RNC
Main TE
MADM
1310 nm SFP used in Both ends
FE Optical, Patch Cords
LC-FC Type is
required
Node B with CPE8 using Optical FE I/F to Nearby TE
1310 nm SFP at
MADM & 1310 nm
SFP at RNC end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
CPE 8 at
Node B
end
Optical FE
Existing OF
Connectivity
Nearby
TE
(MADM)
25-06-11 NWP-1 CM 50
Node B with CPE 8 NIB Tier1 Node FE Connectivity.
For this connectivity the requirements are:
1. Optical FE patch cable is to be extended between Node
B and CPE 8 Systems at Node-B end.
2. From CPE , optical STM1 with 58 Mbps BW is to be
extended to Nearby TE MADM systems.
3. From Main TE MADM, all the FE s are to be aggregated
as GE and the same GE link is to be extended to RNC .
4. After establishing the same, a separate VLAN Group
has to be created for the same.

25-06-11 NWP-1 CM 51

Types of Node B Connectivity

NODE B
RNC
Main TE
MADM
Optical Fiber Cable
LC-FC Type
Node B with CPE8 using Optical FE I/F to Nearby TE
1310 nm SFP at
MADM & 1310 nm
SFP at RNC end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
CPE 8 at
Node B
end
Electrical FE
Existing OF
Connectivity
Nearby
TE
(MADM)
25-06-11 NWP-1 CM 52
Node B with CPE 8 NIB Tier1 Node FE Connectivity.
For this connectivity the requirements are:
1. Electrical FE CAT5 patch cable is to be extended
between Node B and CPE 8 Systems at Node-B end.
2. From CPE , optical STM1 with 58 Mbps BW is to be
extended to Nearby TE MADM systems. Further it is
aggregated as GE at Main TE MADM systems end and the
same GE link is to be extended to RNC .
3. After establishing the same, a separate VLAN Group
has to be created for the same.

25-06-11 NWP-1 CM 53

Types of Node B Connectivity

NODE B
RNC
Main TE
MADM
1310 nm SFP used in Both ends
FE Optical, Patch Cords
LC-FC Type is
required
Node B having dark fiber connectivity to
nearby TE
1310 nm SFP at
MADM & 1310
nm SFP at RNC
end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
Nearby
TE
(MADM)
Dark Fiber
Existing OF
Connectivity
From Other Node B FE I/F
25-06-11 NWP-1 CM 54
Node B having Dark fiber with Nearby TE MADM Systems.
For this connectivity the requirements are:
1. Optical FE patch cable is to be extended between Dark
fiber terminated ODF and Node B.
2. The SFP has to be removed from UTRP Board in Node B
end and the same may be used for Optical FE .
3. From Main TE MADM, all the FE are to be aggregated as
GE and the same GE link is to be extended to RNC .
4. After establishing the same, a separate VLAN Group
has to be created for the same.

25-06-11 NWP-1 CM 55







Types of Node B Connectivity


3. Node B FTTH NIB Tier 1/2 RNC


25-06-11 NWP-1 CM 56
FTTH NETWORK

FTTH services available at following cities of
Major SSAs. As per BSNL CO instruction, FTTH
NW is to be used for implementation of 3 G NW on
IP Media for 14.4 Mbps speed.
The Major cities of SSAs are:
Coimbatore City,
Tiruppur City,
Trichy City,
Salem City,
Madurai City,
Puducherry City.

FTTH ONU-s FE port may be used for Node B
FE Connectivity.


25-06-11 NWP-1 CM 57

Types of Node B Connectivity

NODE B
RNC
NIB
Tier I / II
STM1 optical
LC-FC Type
Node B with CPE8 using FTTH - NIB Tier 2/1 to RNC
1550 nm SFP at
MADM & 1310 nm
SFP at RNC end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
CPE 8 at
Node B
end
Electrical FE
ONU
CPE 8 at
ONT end
FTTH
NW
Electrical FE
Optical FE
Optical GE Optical GE
25-06-11 NWP-1 CM 58
Node B with CPE 8 using FTTH NW NIB
Tier I /II NW to RNC.
For this connectivity the requirements are:
1. Electrical FE patch cable is to be extended between Node B and
CPE 8 at Node B end.
2. The Optical FE connectivity is to be extended between CPE-8 at
node B end and CPE-8 at ONU end. Further Electrical FE of CPE 8 at
ONU end will be extended to ONT of FTTH .
3. The existing FTTH NW BW (ONU FTTH NIB Tier I /II) will be used
for 3 G NW 14.4 Mbps speed. The Optical FE from various Node Bs
are to be aggregated as GE and the same GE link is to be extended to
RNC .
4. After establishing the same, a separate VLAN Group has to be
created for the same.

25-06-11 NWP-1 CM 59

Types of Node B Connectivity

NODE B
RNC
NIB
Tier I / II
Node B Elecrtical FE to RNC using FTTH - NIB Tier 2/1
1550 nm SFP at
MADM & 1310 nm
SFP at RNC end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
Electrical FE
ONU
FTTH
NW
Electrical FE
Optical FE
Optical GE Optical GE
25-06-11 NWP-1 CM 60
Node B Colocated with ONU using FTTH NW
NIB Tier I /II NW to RNC.
For this connectivity the requirements from BSNL are:
1. Electrical FE patch cable is to be extended between Node B and
Colocated ONU of FTTH.
2. The existing FTTH NW BW (ONU FTTH NIB Tier I /II) will be used
for 3 G NW 14.4 Mbps speed. The FE from various Node Bs are to be
aggregated as GE at FTTH end.
3. GE link is to be extended to RNC from NIB Tier I node.
4. After establishing the same, a separate VLAN Group has to be
created for the same.

25-06-11 NWP-1 CM 61







Types of Node B Connectivity


4. Node B -- FE to 8 E1/16 E1 Convertor-
MADM Transmission NW-RNC.

25-06-11 NWP-1 CM 62

Types of Node B Connectivity

NODE B
RNC
LAN
Switch
Node B to RNC using LAN Switch & FE to E1 Converters
1310 nm SFP at
LAN Sw & 1310
nm SFP at RNC
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
FE to E1
converter
at Node B
end Electrical E1s
Existing OF
Connectivity
Nearby
TE (ADM 1
/ADM 4)
Electrical FE
Main TE
MADM
E1 to FE
converter
at Main
TE end
Electrical FE
E1s
25-06-11 NWP-1 CM 63
Node B -- FE to 8 E1/16 E1 Converter- MADM
Transmission NW-RNC.
wherever FE transport not available, this type of
connectivity is to be used .
1. From Node end , FE link has to be connected with FE to
E1 Converter and the corresponding E1s are to be
extended to Main TE through ADM 4 / ADM1 systems.
2. The E1s at Main TE are to be reconverted as FE using
E1 to FE converter and FE has to extended to LAN Switch.
3. GE Link from RNC is to be extended to LAN Switch .
After establishing the physical connectivity, a separate
VLAN Group has to be created for the same.

25-06-11 NWP-1 CM 64

Types of Node B Connectivity

NODE B
RNC
Main TE
MADM
Node B using FE to E1 Converter to Nearby TE
1310 nm SFP at
MADM & 1310 nm
SFP at RNC end,
GE Optical LC-FC
Type is used
Note: The required length of LC-LC Type is not available at site , LC-FC/SC &
SC/FC-LC Patch cables may be used through ODF/FDF with 0 db attenuator
FE to E1
converter
at Node B
end
Electrical E1s
Existing OF
Connectivity
Nearby
TE (ADM 1
/ADM 4)
Electrical FE
25-06-11 NWP-1 CM 65
Node B -- FE to 8 E1/16 E1 Convertor- MADM
Transmission NW-RNC.
wherever FE transport not available, this type of
connectivity is to be used .
1. From Node end , FE link has to be connected with FE to
E1 Converter and the corresponding E1s are to be
extended to MADM systems at Main TE through ADM 4 /
ADM1.
2. If possible, all the E1s from Node Bs are to be
aggregated as GE level at Main TE MADM systems and
the same GE has to be extended to RNC end.
3. After establishing the physical connectivity, a separate
VLAN Group has to be created for the same.

25-06-11 NWP-1 CM 66







OAM Connectivity for NODE B




25-06-11 NWP-1 CM 67


OAM Connectivity for NODE B
NODE B
RNC
Iub over IP
Interface
PE-P-PE Router
M2000
Server at
CBT
Existing IP
Interface
OMCR Clients
25-06-11 NWP-1 CM 68
OAM Connectivity of Node B
After extending Iub over IP interface, OM Connectivity has
to be established by M/s Huawei team through PE-P-PE
Routers & M2000 Servers.
Ping test, Configuration loading of Node B can be done
through OM connectivity.
25-06-11 NWP-1 CM 69







Synchronization in 3G Network on
IP Media




25-06-11 NWP-1 CM 70
RNC&NodeB clock synchronization for Iub IP Solution
Scenario 1: NodeB synchronization over external clock
The NodeB connect to Router and get extract clock
signaling from Huawei Ip Clock Server.
NodeB reference line clock should be <=0.05ppm
NodeB
clock error<=0.05ppm
2MHz Clock for
NodeB
FE
BITS Clock
Huawei IP Clock
Server
R R
MPLS
R R
Scenario 2: Huawei IP Clock Server synchronization
over external clock
For Huawei IP Clock Server, it need the clock source
also. There are 2 types clock resource which can take
backup.
1
st
. BITS clock From BSNL
2
nd
. Line clock from Huawei RNC
25-06-11 NWP-1 CM 71
FRONT PANEL VIEW OF CLOCK SERVER
25-06-11 NWP-1 CM 72
SYNCHONISATION IN 3G IP MEDIA
IEEE 1588 PTP for synchronization.

Synchronization requirement will be met M/s
Huawei supplied IPCLK SERVER 1000. This will be
used to distribute synchronization signals through
IP Connectivity.

Synchronizations to be ensured by M/s Huawei;
otherwise call will drop.(No handover with adjacent
cell possible )


25-06-11 NWP-1 CM 73





BSNL ACTIVITIES FOR
IMPLEMENTATION OF 3G
NETWORK ON IP MEDIA FOR
14.4 Mbps SPEED




25-06-11 NWP-1 CM 74
TN Circle emphasized the need to commence and
expedite the IP connectivity and told that atleast 150 Node
Bs per month should be shifted on IP media as per BSNL
CO instructions dated 03/06/2011.

BSNL Units (SSA Planning, Transmission, NIB Team
and GSM BSS team, Planning team are requested to
expedite the work of migration of Node B sites on IP
immediately.

All the teams of BSNL are requested to go in details of
media availability at each Node B sitewise and identify the
best options as suggested in previous slides for migrating
it on IP media.

25-06-11 NWP-1 CM 75
For Node B on IP media, first RNC of each SSA has to be
integrated to NIB Tier I /Tier II / MADM Network through
GE Links. SSA team has to arrange GE ports at NIB end as
well as MADM transmission end. In-charges of RNC team
has to coordinate with each and every BSNL team and M/s
Huawei to integrate the same.
Out of 1126 Node-Bs, 17 Node Bs are co-located with
Main TE /Tier I node and 12 Node Bs are co-located with
Tier II node, 270 Node Bs having CPE-8, 58 Node B sites
are connected with MADM systems. These 357 Node Bs
can be migrated on IP Media without any issues.
Coimbatore , Nagercoil, Puducherry, Hosur sites are to
be migrated to IP Media on Top Priority SDCAs.
Dark fiber working in Node B sites may be identified
and extend the FE connectivity through dark fibers
without outage of services.

25-06-11 NWP-1 CM 76
To implement the Node Bs on IP Media, there would be
requirement of SFPs at NIB end, Optical Patch cords and
connectors, etc may be arranged immediately.
Replacement of CPE 21 with available CPE 8 equipments
within the SSA may be analyzed and the requirement of
additional CPE 8 may be intimated to Circle transmission
planning by SSA team
Conversion of DMW sites to the OFC shall be planned
by SSA and the requirement shall be intimated to Circle
transmission planning.
Explore the possibilities of using FTTH NW for 3 G NW
on IP media.
Cuddalore, Virudhunagar, CRDA, Coonoor, NGC SSAs
does not have RNC equipments. These SSA Node Bs are
to integrated with NIB NW Tier I/II of that SSA and further
GE port from NIB NW is to be extended to respective
RNCs.
25-06-11 NWP-1 CM 77
Node-B

Node-B Location
T
X
E
Q
P
T
Exg. CPE-8 /
OFC
FE I / F
CPE-8 / CPE 21
OFC / MW / 34 Mb
OF I / F or Eth I / F
OF I / F or Eth I / F
E1s
T
X
E
Q
P
T
STM1s / E1s
OF Cable
SSA TX ROOM
O
S
N
M
U
X
STM1s / E1s
OF/ E1 Cable
R
N
C
RPR
Tier-2 /
OCLAN /
FTTH
T
I
E
R
1
T
X
E
Q
P
T
A
O
U
G
O
U
Nearby Broad
Band NW Location
w.r.to Node-Bs
Nearby Broad
Band NW Location
w.r.to RNCs
FE IF
GE I/F
Existing & Proposed IP Connectivity between Node-Bs and RNCs in TN LSA
Proposed connectivity for 3G Network on IP Media for 14.4 Mbps Speed
STM1
OF
Cable
Nearby TE Bldg
MAIN TE Bldg
MADM SYSTEMS
E1
GE I/F
GE I/F
25-06-11 NWP-1 CM 78


THANK YOU