structures Getting started Use of STAAD Use of spreadsheets Presentation Typical calculation report content
Preparation of calculations : Buildings/ Process/ Water related structures Getting started: Know the purpose : Preliminary/ Tender/ Detailed Design Basis : Obtain from PM/ JPI (Ensure it is approved) If not available, prepare, get it checked by lead and approved by client Essential : Geotechnical information, FGL/ NGL, foundation solution, support definition, brief design philosophy- (including future expansion detail and expansion joint philosophy if applicable), material grade, cover requirement (for rc elements), lateral restraint assumption if any (steel structure), effective length assumption if any, software to be used Any specific loading requirement Expansion joint requirement Use check list before sending for approval Getting started
Building/ Structure Potential specific loads Work shop, ware house, store, pumping station, process buildings, maintenance building Crane, Equipments/ plants/ services Institutional/ commercial buildings False ceiling, services Control rooms, security buildings Blast loading Steel structures in refineries Due to fire protection Underground chambers/ tanks Surcharge/ equipment load, nozzle forces Pipe racks Friction/ anchor loads/ temperature Equipment foundation Specific loading supplied by vendors Any structure Due to future expansion Preparation of calculations : Buildings/ Process/ Water related structures Use of STAAD Before starting STAAD model : Check if there is any version requirement Confirm/ agree Founding depth, FGL/ NGL Member orientations Material properties Support definitions, Releases Which members are to be designed by STAAD Design parameters Preparation of calculations : Buildings/ Process/ Water related structures Preparation of calculations : Buildings/ Process/ Water related structures Use of STAAD Working with STAAD model : Give file name easily recognizable Avoid abbreviated names like WS/ GH/ PH Containing revision status Warehouse Rev 1 p WH 03 12 13 X Start with project set up Note revision description in comment box every time revised Keep only the latest valid file in working folder Use levels of input drawings as levels of structure Get the model checked after every mile stone
Preparation of calculations : Buildings/ Process/ Water related structures Use of Spreadsheets : Check validity before starting Carefully study inputs required Check all links of cells Ensure that all OKs have Ifs Preparation of calculations : Buildings/ Process/ Water related structures Presentation: Important Present to reviewers point of view Neat and tidy Logical flow Avoid unnecessary bold, capital letters Be consistent, particularly for units and terminology
Preparation of calculations : Buildings/ Process/ Water related structures Presentation: Few points to keep in mind Mention all assumptions Mention all deviations- with drawing/ codes if any Use figures/ illustrations/ screen shots where possible Cross references Appendices Preparation of calculations : Buildings/ Process/ Water related structures Presentation: Few important points which we tend to ignore Correctness of introduction Title sheet, Title block at top Correctness of content and page numbers of index Spell check and grammar Mentioning the assumption made while preparing STAAD model
Preparation of calculations : Buildings/ Process/ Water related structures Typical calculation report content: Main document Title page Index Introduction Design basis and methodology Preliminary checks (like buoyancy, overturning etc if applicable) Primary loads Load combinations STAAD pictures showing geometry, application of loads Essential deflection checks Element wise design Summary Preparation of calculations : Buildings/ Process/ Water related structures Typical calculation report content: Appendices STAAD Input file STAAD Output file Design spread sheets Manufacturers catalogues/ tables if used in design Reference document to support input Output drawings if required by client
Remember : An appendix is like a tail : It should not affect the content of main document if removed..
Preparation of calculations Typical calculation report content : Title Should have clarity of scope Design of School X Steel super structure design for School p Index Only important chapters and appendices Introduction Give introduction of structure, not of project Should contain brief detail about structure (Purpose, material of construction, approximate size, no of floors), scope of document and brief design philosophy
Preparation of calculations Typical calculation report content : Design basis and Methodology Must be in line with approved BoD Preliminary checks Necessary for underground structures and retaining walls especially Primary loads Basis for STAAD application One should be able to match the values with those applied in STAAD For large project, define primary loads at the beginning of the projects and keep same numbers through out the project
Preparation of calculations Typical calculation report content : Load Combinations Dont waive any combination STAAD Pictures See that it is legible in A4 Essential deflection checks Be careful about relative displacement STAAD doesnt check horizontal sway Preparation of calculations Typical calculation report content : Element wise design Give design forces Cross reference of spreadsheets As far as possible, give links of cells Summary For RC elements, Size of the element, reinforcement required and reinforcement proposed For steel members, section size and utility ratio Preparation of calculations : Buildings/ Process/ Water related structures Finally,