Sie sind auf Seite 1von 75

Rittal together to Complete IT Competence for Data Center Infrastructure Solution

1
Rittals Data Center Infrastructure Solution
Presentation

Rimatrix5 Team
Rittal Middle East, Dubai

Rittal together to Complete IT Competence for Data Center Infrastructure Solution
2
Rittal together A powerful alliance with Friedhelm Loh Group
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
3
Enclosure Systems
Power Distribution
Electronic Packaging
Systems
System Climate Control
IT Solutions
Worldwide Service
IT Solutions
Data and
Network Technology
Modular IT Infrastructures
with RimatriX5
Data Centre Climate
Control
Integrated Data Centre
Solutions
Modular physical
System Security
IT Infrastructure and
integrated Security
Solutions for
efficient and
secure Data Centres
Consulting and
planning for
business continuity
Risk analyses
General contractor
for Data Centre
Projects
Rittal together Complete IT Competence
Communication Systems
Rittal in the IT market
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
4
Employs 8000 people world-wide

Turnover: 1.4 billion

Global presence (19 production sites, 50
subsidiaries, 70 agencies)

more than 2000 patents
Rittal Short Profile
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
5
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
6
Rack & Hardware
Power Management
Cooling
Security
Monitoring
RimatriX5 - system & components
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
7
Rack
comprehensive product range with an
unparalleled choice of accessories
greater freedom, greater flexibility and
greater reliability
Power
Constant and reliable power supplies via
power supplies to racks and data
centres with the Rittal Power System
concept and
back-up solutions of the modular UPS
Power concept.
Cooling
Rittal RimatriX5 climate control concepts,
including
Liquid Cooling Package or
direct CPU cooling for temperature-
neutral enhancement of data centres.
Security
Physical security of IT racks is essential for
high availability,
temperature, smoke and vibration
sensors, together with signal lamps and
sophisticated access control solutions
and tested enclosure extinguisher
systems
provide reliable protection.
Monitoring and Remote
Management
Simple handling and a perfect overview
of
monitoring, measurement and control
functions
reduce failure risks and enable preventive
intervention.
5 pillars one system
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
8
Low End Middle Range High End
The suitable system platform for any application on the IT market
RimatriX5 - rack & hardware
- platform strategy meets all requirements !
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
9
Rittal rack systems
TS 8 the Top enclosure system
Rittal TS 8:
This all-rounder offers diversity and
protection for your network.

Suitable for one or two 482.6 mm (19")
mounting levels, and for partial or full
installation.

The ingenious symmetrical frame design
offers baying on all sides.

A high level of security, thanks to lock
systems with a comfort handle and four-
point locking

Perfect integration of climate control
components

Protection category up to IP 55
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
10
based on industrial TS8 enclosure
Equipped with 482.6 mm (19) mounting
frame at the front and rear, thus load
capacity up to 1500kg
Particular suitable for mixed configurations
of server and network technology


TS8 Server rack
Optimised ventilation for all TS
server racks:
78% free surface
in the perforated plate section

Significantly higher operational
reliability thanks to optimum discharge
of heat loss
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
11
Made by Rittal
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
13
Schematic Diagram of Power Distribution in Data Center
(UPS, PDR, PDM, PSM concept)
Power Distribution System in Data Center
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
14
Single phase for decentralized
operation PMC 12
1 - 12 kVA N+1
all as stand alone or 19
version applicable
1, 2 and 3 kVA : internal
batteries
4.5 and 6 kVA : parallel
mode of operation possible;
external batteries
additional battery packs in
same housing dimensions
Rittal UPS range
classification : VFI-SS-111
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
15
PMC 200 modules

12 / 20 kW : 600 mm wide rack
32 / 40 kW : 800 mm wide rack
Racks 600 / 800 mm breit
increased efficiency [96%]
increased power factor [PF=1]
increased power/rack with max. 5 modules
redundant N+1 system architecture for
modules and batteries
Rittal UPS PMC 200
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
16
Secure return on investment practically unlimited scalability
A system can be expanded step by step to incorporate up to 20 parallel PMC modules,
e.g. for a UPS capacity of 800 kW without redundancy or 760 kW n+1 (with 40 kW
modules).
Expansion is possible during live operation without the need to switch to an
unprotected supply.
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
17
Design features:
Double conversion UPS systems
up to 800kW or 720kW (n+1)
UPS protection category: VFI-SS-111
New module power 80kW
Safe swap expansion
Modular rack mounting
Dimensions WxHxD 1200x2000x800
Two split modules, active & passive
UPS PMC 800
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
18
Rittal UPS range
Phase UPS, Rittal Power Modular
Concept PMC 40
Topology: on-line, dual converters,
VFI-SS-111
Modular design and switched in
parallel
Maximum output:
- 40 kW non-redundant
- 20 kW redundant
Universal applications in each 19
rack at least 800 mm deep

Rittal together to Complete IT Competence for Data Center Infrastructure Solution
19
Pay As You Grow,
your requirement of
with 4 UPS Module
today & 1 Blank
spaces, in future
adding Module as per
your Load &
redundancy
requirement
Hot swappable UPS
Modules ensure no
downtime for
repairing & decrease
(MTTR)
Picture Illustration of Solution & Benefit
Decentralized Parallel
Architecture (DPA) --
provides highest
Availability
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
20
PMC
STATIC BP
SWITCH
PMC
POWER
UNIT
CENTRAL
PROCESSING
UNIT
PMC
CONTROL
PANEL
Critical load
Supply 1
Supply 2
PMC
STATIC BP
SWITCH
PMC
POWER
UNIT
PMC CENTRAL
PROCESSING
UNIT
PMC
CONTROL
PANEL
PMC
STATIC BP
SWITCH
PMC
POWER
UNIT
PMC CENTRAL
PROCESSING
UNIT
PMC
CONTROL
PANEL
PMC
BATTERY
PACKS

PMC
BATTERY
PACKS

PMC
BATTERY
PACKS

Decentralized Parallel Architecture DPA

With Decentralised Parallel Architecture (DPA), the UPS hardware and software components are
distributed as independent modules, thus avoiding a single point of failure.
Control panel
CPU
Power unit
Static bypass
Batteries
(1 string/module)
and
Targeted and sustained avoidance of an SPoF (single point of
failure) and thus increased availability
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
21
Availability: A = MTBF
UPS
/ (MTBF
UPS
+ MTTR
UPS
)
Example
Non-modular (1+1)
redundant configuration
Rack-mounted modular (3+1)
redundant configuration
MTBF 600,000 500,000
MTTR 6 h 0.5h
Availability 0.999990 (5 nines) 0.999999 (6 nines)
Rack-mounted modular PMC with 4x40 kW
(3+1) redundant configuration
Traditional non-modular 2x120 kW
(1+1) redundant configuration
Load
120kW
Load
120kW
120kW 120kW
40kW module
40kW module
40kW module
40kW module
Shortest possible MTTR and previously unattained availability
That is what counts!
(only possible with
a modular technology)
Result
NON-availability:
5 nines = 6 min./year
6 nines = 6 sec./year
DEFINITIONS:
MTBF: Mean Time
Between Failures

MTTR: Mean Time
To Recovery
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
22
Design features:
Energy distribution for additional IT
Racks in the 19-enclosure
19 Power Distribution Module
mechanically locked in the Rack/19-
fastening level,incl. main switch,
Connection Plug & Play
Connected rating max. 40 kW per PDM
Retrofittable during ongoing operation
Can be desinged to be with dual
inputs
Power Distribution Module
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
23
Design features:
Input max. 3 x 63 A, 400 V
4 Outputs 3 x 16 A, 400 V each
2 Outputs 3 x 32 A, 400V each
Cable-bound to the PSM busbars

Power Distribution Module
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
24
PDR Flex Modular IT low-voltage distributor
Application on project basis
Benefits:
Simple planning saves time
Straightforward assembly cuts
costs
Preconfigured / customer-specific
expansion
ABB Smissline components can
be integrated
Can be extended without a large
outlay

Available as floor-standing and wall-
mounted distributors
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
25
Base element of the power
distribution

The PSM consists of two main
components:

a rail, which meshes into the
horizontal frame profile of the
FR(i) or is installed with a
fastening set in TS 8 panels
plug-in modules in different
country models, which are
integrated directly in the
busbar
Power System Module
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
26
PSM Plus busbar
4 independent circuits infeed
3-phase / redundant design
twice the power of actual PSM
possible, max. 192A

/ modules (all with 2x 16A input)
4-socket Schuko module, including
fuses
4-socket C13 module, including fuses
6-socket C13 module
4-socket C19 module
2-socket C19 module, including fuses
PSM Plus- Rail
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
27
PSM rail with 3-phase current measurement

complete rail with measurement
module for retrofitting in existing
installations
Blue graphical display
Modified in-feed X-COM connector
with display and monitoring of the
complete three-phase connection
current and the power per phase
remote monitoring via CMC-TC
compatible with PSM accessories
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
28
A
A
A
Operating interface CMC-TC
for active PSM
PSM Active Monitoring / Management
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
29
PSM modules active, 2 variants: PSM module / PCU for 19"
PSM active modules (2 slots)
Active PCU for 19" assembly
Switching option per port via CMC-TC
Stand-alone solution with separate
power pack (without options for
switching or changing the limits)
Current measurement per module slot
Current measurement per socket
Limits can be configured as required
via CMC-TC!
2 versions:
C13 (7859.122 / 7859.125)
C19 (7859.132 / 7859.135)
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
30
Power Distribution Unit Compact 32A plug & play power distribution
Compact all-in-one power distribution
(230V / 400V)
5 different article versions:
In general: Measurement per
phase/terminal block
Some versions: Switching option
per port
Mounting on TS8 enclosure frames
Installation material supplied
Version in RAL9005 (black)
Ready for connection with IEC/EN
60309 plug (32A CEE)
C13 outputs (additionally C19 in some
cases)
1 & 3-phase versions available
Integrated fuses (16A, L+N in each
case)
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
32
Low Density Mid Density High Density
LCP Plus
LCP Standard/ LCP Modular
LCP Extend
Basic solutions
with cold aisle containment
LCP Inline
Computer room air conditioning system
Heat load on server
enclosure
with cold aisle containment
Rittal Cooling Systems
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
33
Room climate control
Air conditioning unit for data centre
cooling using raised floor
Four power classes - 23-118 kW -
with cold water
Four power classes - 18-54 kW-
with refrigerant
Options:
- Humidification
- Heating
- Heating + humidification
Computer room air conditioning (CRAC) system
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
34
Using New energy efficient CRAC Systems?
Advantage of new CRAC
No losses due to deflection
No loss of installation height
Larger medium matrix
Optimum cold air distribution
Low energy consumption and
space requirements
Can save up to 30% in energy
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
35
Cold/Hot aisle containment
Advantages of cold aisle containment at a glance:
No mixing of hot and cold air
Simple cold air routing direct to servers
Increased efficiency in conjunction with
conventional air conditioning units
due to higher outlet air temperature.
Compatible with liquid cooling systems

Increasing efficiency of raised floor climate control

Rittal together to Complete IT Competence for Data Center Infrastructure Solution
36
IT-Cooling
Room-based systems
Increasing efficiency with Aisle Containment
No mixing of hot and cold air
Provides planed function
Controlled cold air supply to the servers
with Cold Aisle Containment
Increasing efficiency of room climatisation
due to increasing the return air temperature
No influence of temperature of the warm
areas to the ambient with Hot Aisle
Containment
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
37
For mid density applications without raised floors
Cooling capacity up to 30kW
Ambient air is extracted from the warm aisle or room through
the perforated rear door, cooled and blown into the cold aisle
Supports existing room climate control
In conjunction with cold aisle containment, provides significant
increase in cooling capacity per server rack

LCP Inline
IT-Cooling
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
38
Cold Aisle Containment with LCP In line
In conjunction with Cold Aisle Containment, provides significant increase in cooling
capacity per server rack

Rittal together to Complete IT Competence for Data Center Infrastructure Solution
39
Cooling Racks By Cold or Hot Aisle Containment
LCP-Inline
Top view- Hot isle Containemt
Hot Isle Containemt
Top view- Cold isle Containemts
LCP-Inline
Cold Isle Containemt
IT-Cooling

Rittal together to Complete IT Competence for Data Center Infrastructure Solution
40
IT-Cooling
Enclosure-based systems
LCP Standard
LCP Plus
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
41
IT-Cooling
Enclosure-based systems
How does it work?
+ =
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
42
How does it work?
IT-Cooling
Enclosure-based systems
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
43
IT-Cooling
Enclosure-based systems
LCP Standard
Sideways connected
Equal temperature distribution over the
total height
Clear accessibility of the 19-equipment
Full 42U of the rack available
Dimensions:
300 x 2000 x 1000/1200 (W x H x D)
Integrated condensate management and
leakage protection
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
44
LCP Plus
Sideways connected
Equal temperature distribution over the
total height
Clear accessibility of the 19-
equipment
Full 42U of the rack available
Dimensions:
300 x 2000 x 1200 (W x H x D)
Integrated condensate management
and leakage protection
Touch screen for stand-alone use
IT-Cooling
Enclosure-based systems
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
45
Implementation rack-based systems (n+1 redundancy)
1
2
IT-Cooling
Enclosure-based systems
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
46
IT-Cooling
Enclosure-based systems
Implementation rack-based systems (2n redundancy)
1
2
Server rack
L
C
P
L
C
P
Server rack
L
C
P
L
C
P
Server rack
L
C
P
L
C
P
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
47
LCP T3+

47 U
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
48
IT-Cooling
Enclosure-based systems
LCP T3+
Cooling capacity to 25 kW
Redundant power and water feed
Intelligent software
Clear accessibility of the 19-equipment
Full 42U or 47U of the rack available
Dimensions:
300 x 2000 / 2200 x 1200 (W x H x D)
Leakage protection
Touch screen for stand-alone use
Designed for high water in temperatures
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
49
IT-Cooling
Enclosure-based systems
Software and remote controlling
Connection to Network IP
All measured values on one
view
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
50
Approvals
UL 1995
IT-Cooling
Enclosure-based systems
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
51
IT-Cooling
Enclosure-based systems
OEM Products

HP also trusts on chilled-water cooling of Rittal
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
53
Processing Unit
Computer Multi Control Top Concept

Access Unit I/O Unit GSM Unit
Security CMC-TC System
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
54
The Rittal CMC-TC Monitoring System
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
55
The components
Processing Unit

Basis of the monitoring system

Network interface 10BaseT

integrated Web server

max. 4 sensor units

max. cable length to sensor unit: 50m

central power supply unit for all sensors
and actuators connected

The processing unit may optionally be
operated via the CMC-TC master

Rittal together to Complete IT Competence for Data Center Infrastructure Solution
56
Universal I/O Unit

automatic sensor /actuator
detection

Maximum of 4 sensors / actuators

Power supply via the Cat 5 cable

max. cable length to sensor: 7m

max. cable length to PU 50m

is operated by clicking on one
button
The components
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
57
Possible sensors for the
I/O Unit:

Temperature sensor
Humidity sensor
Analogue input (4-20 am)
Access sensor (door, side panel,
roof)
Vandalism sensor (vibration)
Smoke alarm
Motion detector
Digital input
Digital relay output
Voltage monitor
The components
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
58
Access Unit

automatic sensor / actuator detection

designed for 2 door systems

IC interface for readers

Power supply via the Cat 5 cable

max cable length to sensor: 7m

max. cable length to PU: 50m

The components
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
59
CMC-TC GSM-Unit

Reports an alarm via the GSM network

Connection via RJ12 cable to serial interface

A separate power pack is not required

D- or E-network SIM-card is not sufficient

May be used when a network is not available

Second (redundant) alarm
The components
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
60
Accessories

Temperature sensor
Temperature application range:
+5 to +45 C
Tolerance +/- 2K
NTC, 10kOhm at 25C

Humidity sensor
Measurement range
10...90% relative humidity
+/- 3% at 20C
Temperature application
range +5 to +45 C


Rittal together to Complete IT Competence for Data Center Infrastructure Solution
61
Water Leak Sensor :
Control water ingress
Length:15 Mtr
Plug & play connection via RJ12
Automatic detection at the CMC-TC
Customer benefits :
Water ingress can be reported early
Alarm via SNMP, SMS, e-mail or fax
Smoke alarm:
Opto-electronic smoke particle
evaluation
Measurement frequency: one every
10 seconds.
Accessories
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
62
Accessories
Voltage monitor
IEC plug
Reports voltage status: voltage
ON/voltage OFF



CMC socket strip
230V AC 50/60Hz / 16A
Relay message contact for
Overvoltage protection
Voltage ON/voltage OFF
Interference suppressor filter



Rittal together to Complete IT Competence for Data Center Infrastructure Solution
63
CMC-TC electro- magnetic TS8 handle
with master Key
Comfort handle with electromagnetic locking and additional
master key function
Electromagnetic locking for the TS8 enclosure
Master key function
Monitors the handle position
Power supply 24 VDC via the access unit
Note :Locking rods do not have to be changed
Accessories
CMC-TC reader

The door handle is released to authorize persons who have identified
themselves with a smartcard/magnetic card/combination code.

Card reader is installed above the enclosure handle and can also
function as a central unit for releasing several doors.
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
64
Key features:
automatic rack door opening for
closed rack systems in case of fires
or if cooling breaks down

door opening with a magnetic and
gas pressure suspension system
that always releases the door

connecting and triggering the
automatic door kit with its control unit
the automatic door control unit

you can mount it on 1- or 2-piece
glazed or sheet steel door
Automatic Door Opening System
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
65
The components
Wireless I/O Unit
For up to 16 sensors,
Can operate at distances of up to 50 m
indoors
200 m possible outdoors if there is a clear
line of sight

Outdoor aerial
For improving the connection

Measurement system
For testing the quality of the connection
when commencing operation
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
66
The components
Wireless temperature sensor
1 measurement value / 30 sec.
-25C to +65C IP40 / IP54*
Wireless humidity sensor
1 measurement value / 60 sec.
-25C to +65C IP40 / IP54*
Wireless door sensor
-25C to +65C, up to IP40 / IP54*
Wireless digital input
Polls the status of the floating contacts
NO / NC

* With protective cover
Service life of batteries up to 7 year, batteries can be replaced
(depending on temperature)
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
67
Advantages & benefits:
overview of all components
installed into the data centre
identifying free capacities
you can store the unit ratings
(such as power consumption
and service) on the RFID chip
no longer necessary to manually
record
extended performance in
connection with RiZone


Rittal Dynamic Rack Control (DRC)



Rittal together to Complete IT Competence for Data Center Infrastructure Solution
68
Key features:
1 HE rack extinguishing
system for mounting on the
19 level
Early Detection System
Protection/rack volume: 3 m
3
Clean Agent NOVEC 1230
4 hours of emergency power
supply
DET-AC Plus extinguishing system SL
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
69
CMC-TC MANAGER
CMC-TC Manager
SNMP agent based on
Java
Used to monitor several
systems CMC-TC and
CMC PCU II
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
70

All error messages from systems on the network appear on a single user
interface.

You can control and operate various systems from a single user interface.

When errors occur, you can send e-mails or pop-ups to other users.

Analog values are displayed in graphic form.

Data is recorded for analysis purposes.




CMC-TC MANAGER
What the CMC-TC Manager Can Do
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
72
Monitor/keyboard drawer with SSC
SSC view8/32 economy:

Full administrative facility over up to
8/32 servers accommodated in just 1U in
the server rack

SSC view8/32 is mounted behind the
existing monitor unit

Operated via OSD menu

Power supplied through Rittal
monitor/keyboard unit

Rittal together to Complete IT Competence for Data Center Infrastructure Solution
73
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
74
SSC 8 / 32 overall view of the system
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
75
Rittal International Lampertz physical security
Unsere Strken - Ihr Vorteil !
Modular IT security rooms to suit all demands
Security safes for IT systems
Safes for data protection and document storage
IT equipment for state-of-the-art workplaces
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
76
Lampertz Modular Safe LMS 9.3
The modular Lampertz compact datacenter

Physical hardware protection on security
level
Fire protection
Fire water tight
Smoke gas tight
Flexible cable duct system
Complete modularity
Operator door and separate service door
And much more...

Rittal International - Lampertz physical security
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
77
Rittal International Lampertz physical security
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
79
References
Rittal together to Complete IT Competence for Data Center Infrastructure Solution
80
IT-Cooling
Produktbersicht
Thank you for the
Attention!

Das könnte Ihnen auch gefallen