Introduction


The BTS commissioning & SW files are stored on the station unit module
(SUMA)

The Station unit module is the core of the BTS ,it is responsible for
The O&M Functions such as Alarms reporting ,BTS Configuration,
internal Power Supply control & clock generation and distribution
Transmission functions by connecting the BTS to the BSC through the
ABIS cable.

The ABIS can carry up to 32 time slots
0 to 30 are assigned to the TRES for normal traffic(voice and Data
services)
31 : is assigned to the OMU in the SUMA card for signaling (Control
information) between BSC & BTS such as Alarm reporting ,BTS
Master file Download, configuration files etc..
LED Color Status Description
OML

Yellow

On BTS is supervised and connected to the BSC
Blinking BTS & BSC link is being established
Off Link disconnected.
ABIS

Yellow

On Abis 1 is connected and can serve TCH/Signaling
Blinking There are Alarms on the ABIS
Off Not configured or not used.
O&M

Yellow

On SUMA master file & configuration are present in the
EPROM
Blinking In a transient state, SUMA is loading the BTS MSF &
Configuration file from the BSC
Off Not used.
FAUL
T

RED

On Fatal alarm on BTS Module (ANC,TRE etc ..)
Blinking Non-fatal alarm. Such as Faulty Fan unit
Off No alarm.
SUMA card led status indication
Offline
Switch the BTS off by pushing down its DC C/BS

Unscrew the ABIS Cable

Open BTS SW and Type
User Name : commte
Password : bts2site

Go to Configuration Click On BTS Software Download


Press the folder icon to start choosing the BTS Files
Select Master File from the BTS SW folder
Select 0CPF File from the BTS SW folder
Wait for the BTS to download all the files ,During the SW
Download the Suma LED Status will be :
OML ,ABIS & O&M Flashing
last file to be downloaded is the OCPF 002 file after that the O&M
will be solid
Commissioning
From Configuration choose BTS Commissioning
Click on Start Commissioning
Notice that the status of the commissioning changed from not
running to running
Edit Q1 address by clicking its start button
Edit Remote Inventory by clicking its start button and press
YES : if the update is already done in the Remote Inventory
panels
NO : if the update is not done in the Remote Inventory panels
Edit Sector Mapping by clicking its start button
Assign sector-ID to each combiner and then press ok
Edit Twin-Settings by clicking its start button
Choose the mode of each Twin-TRE , usually in our network
we leave at the default which is Dual TRE
Hardware check by clicking its start button
the Suma card will start to check the HW available inside
the BTS through the RI-Cable
INIT _ALL_SECT by clicking its start button
the SUMA card will power on all the combiners and TRES to
check their operation
Choose End commissioning ,Stop commissioning window will appear
choose ok after moving all the modules in the selected module window
Wait for the BTS to restart itself SW and then connect the Abis cable.

Finally restart the BTS HW
the SUMA led status should be as following :
Abis & OML are solid
O&M Flashing as the BTS loading its data and RSLs from the BSC

The loading process will take 15 to 20 Minutes ,after that the
O&M Led will be solid and the SUMA will initialize the
BTS sectors (Combiners & TRES)

The BTS Terminal program will start to load the BTS Data
Take snapshots and check with OMC



Thank You