Beruflich Dokumente
Kultur Dokumente
GUIDELINES
3G OPTIMIZATION OVERVIEW
Network
Optimization
Capacity
Management
Netact OSS
Performance
Monitoring
NETWORK OPTIMIZATION
OBJECTIVE
Poor
Quality
Poor
Coverage
Optimum
Area
Poor
Coverage
Drive Test
Measurement
No
Coverage area
optimization
Yes
No
Best servers
Ec/No > -10 dB
B
C
Dominance area
optimization
Dominance problem
area (Low best
server Ec/No)
Yes
4th Best servers
Ec/No < 6 dB (ref to Best
server)
No
Dominance area
optimization
Yes
Complete
Measurement
Analysis
Dominance problem
area (High best
server Ec/No)
BLOCK A
Task
To identify area where RSCP is less than 95 dBm and to optimize the coverage of that
affected area
Reason
Area where RSCP is less than 95 dBm and poor Ec/No value would be consider coverage
problematic area or has poor coverage
This would lead to call set up failure, HO failure, drop call and degradation to the PS
throughput
Items required for analysis
RSCP and Ec/No plots for best server on map
Plot of RSCP vs Ec/No to have quick understanding of the problem
Measurement log files
Solution
Up-tilting, panning and height of antenna changes
Increase CPICH power
Antenna type changing to a higher gain
Check missing neighbors
Use NetAct to check coverage prediction by changing the inputs of the site
Use the MapInfo/UMTS tool for antenna tilting to estimate coverage improvement (optional)
BLOCK B
Tasks
To identify area which RSCP > -95 dBm but Ec/No < -10 dB and to optimize the affected area
Reasons
In this area problems are more on the dominance and pilot pollution
This would lead to call set up failure, HO failure, drop call and degradation to the PS
throughput
Items required for analysis
Plots of Ec/No and RSCP for best server on map
Plots of Ec/No of each scrambling in the affected area
Plots RSCP vs Ec/No
Measurement log files
Solution
Down-tilting, panning and antenna height changes
Increase CPICH of serving cell, decrease CPICH of interfering cells
Check for missing neighbors
Check co-scrambling code
Change antenna type to lower gain
BLOCK C
Task
To identify the 4th best server is < 6dB to the reference of best server
and optimize the area
Reasons
To meet the KPI
Too many best servers would cause unnecessary HO
Wasting resources (hardware channels, Iub capacity etc)
Item required for analysis
Measurement log file
Solution
Down-tilting, panning and antenna height changed
Increase CPICH of serving cell, decrease CPICH of interfering cells
Use MapInfo/UMTS to generate the percentage
Antenna type change to lower gain
CAPACITY MANAGEMENT
BLOCKING POINTS IN 3G
NETWORK
k All _ Classes
k All _ Classes
k All _ Classes
k All _ Classes
WPA from
20W to 40W
Parameter Tuning.
Feature
Dynamic
Allocation
such
as
Power
DL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
8
12
16
1
1
1
1
2
2
2
2
WSPC 2
UL
9 10 11 8 8
13 14 15 9 9
10 10
1 1 1 11 11
1 1 1 12 12
1 1 1 16 16
1 1 1 14 14
2 2 2 15 15
2 2 2 16 16
2 2 2 1 1
2 2 2 2 2
DL
8
9
10
11
12
16
14
15
16
1
2
8
9
10
11
12
16
14
15
16
1
2
UL
1
2
3
4
5
6
7
8
9 1 2 3 4 1 1 1 1
10 5 6 7
2 2 2 2
11
3 3 3 3
12
4 4 4 4
13
5 5 5 5
14
6 6 6 6
15
7 7 7 7
16
CODE_CAPACITY
DENOM_CODE_CAPACITY
100%
1)
2)
IuB INTERFACE(1)
AAL2 connections are allocated and released by ATM Resource Management which will
check AAL2 reservation using CAC. M550 measurement reports RNC CAC resource usage
for Iub AAL2 user plane traffic downlink
In RAS06, the new ATM Interface measurement (M532) gives indication of the ATM interface
traffic load by reporting the traffic volumes and the bandwidth available for a specific interface.
The measurement can also be used to detect interfaces that are congested and cause traffic
loss. Congestion can be detected by following the number of ATM cells going in and coming
out from the interface.
IuB INTERFACE(1)
Call Setup Failure due
to Radio Interface
resource shortage
would be triggered in
RRC and RAB call
setup failure cause
Transmission
WBTS
IuB
1E1 = 2Mbps
2E1 = 4Mbps
RNC
PERFORMANCE MONITORING
CELL AVAILABILITY
start
stop
FAILURE BREAKDOWN
RAB SETUP Fail AC
RAB SETUP Fail BTS
RAB SETUP Fail Transport
RAB SETUP Fail RNC
RAB SETUP Fail Frozen BTS
RAB ACC Fail UE
RAB ACC Fail RNC
FAILURE BREAKDOWN
RAB SETUP Fail AC
RAB SETUP Fail BTS
RAB SETUP Fail Transport
RAB SETUP Fail RNC
RAB SETUP Fail Frozen BTS
RAB ACC Fail UE
RAB ACC Fail RNC
FAILURE BREAKDOWN
RAB SETUP Fail AC PS Inter
RAB SETUP Fail RNC PS Inter
RAB SETUP Fail Frozen BTS PS Inter
RAB SETUP Fail Frozen Iub PS Inter
RAB ACC Fail UE PS Inter
RAB ACC Fail RNC PS Inter
RAB SETUP Fail AC PS Backg
RAB SETUP Fail RNC PS Backg
RAB SETUP Fail Frozen BTS PS Backg
RAB SETUP Fail Frozen Iub PS Backg
RAB ACC Fail UE PS Backg
RAB ACC Fail RNC PS Backg
ISHO NRT SR
Problem
Description
Possible solutions
Pilot Pollution
Missing neighbour
Problem
Description
Possible solutions
Problem
Description
Possible solutions
Dropped call
Dropped call
Dropped call
NetAct OSS
CM OPERATIONS MANAGER
CM
CM EDITOR
CM
CM ANALYSER
CM Analyser
REPORTING SUITES
Reporting
REPORTING SUITES
Select needed
RAN report
R
A
N
R
E
P
O
R
T
S
REPORT BUILDER
Report
APPLICATION LAUNCHER
RNW Online
Monitoring is used
to view Cell Load
CALL FLOW
AMR MOC
MS
BTS
RNC
CS_CN
AAL2SIG: ERQ
AAL2SIG: ECF
AMR MTC
MS
RNC
BTS
CS_CN
RANAP:PAGING
RRC:PAGING TYPE 1
RRC:RRC CONNECTION REQUEST
NBAP:RADIO LINK SETUP REQUEST
NBAP:RADIO LINK SETUP RESPONSE
AAL2SIG: ERQ
AAL2SIG: ECF
RRC:RRC CONNECTION SETUP
L1 synchronisation
NBAP:SYNCHRONIZATION INDICATION
RRC:CONNECTION SETUP COMPLETE
RRC:INITIAL DIRECT TRANSFER (Paging response)
RANAP:INITIAL UE MESSAGE
(Paging response)
RANAP: DIRECT TRANSFER
(Setup)
PS DATA
MS
BTS
RNC
PS_CN
(Attach Accept)
SHO
EVENT 1a
UE
BTS
EVENT 1b
RNC
UE
BTS
SHO
EVENT 1c
UE
BTS
RNC
THANK YOU