Beruflich Dokumente
Kultur Dokumente
ZTE University
Content
KPI Classification
RAN KPI Definition and Measurement
KPI Optimization
KPI monitor
KPI Case study
KPI Overview
NetNumenM31 (RAN) Mobile Network Element
Management System is ZTE Element Management
System of operation and management for one or more
NEs. (FM, PM, CM)
Performance Monitor (according to the importance and
usage):
KPI
PI: Performance Indicator
SPI: statistical performance indicator: with statistical rule such as
call completion rate>95%.
Customized performance index
Performance management
Fault Management
Configuration Management
Mobility Class
Coverage Class
Coverage Probability
QoS Class
Content
KPI Classification
RAN KPI Definition and Measurement
KPI Optimization
KPI monitor
KPI Case study
Coverage Probability
Indicator
Description
Indicator
Definition
Signaling Flow
Indicator
Extension
Statistic Period
Statistic AreaClutter-wise
Indoor or OutdoorBOTH
Coverage Probability
Indicator
Description
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indoor or OutdoorBOTH
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
UE
Signaling Flow
RNC
CN
RRC Connection Setup
Request Times
DT Message Exchange
RAB Assignment Request
Radio Bearer Setup
Indicator
Extension
Established
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
UE
Indicator
Extension
Signaling Flow
RNC
CN
RAB Assignment
Request Times
DT Message Exchange
Established
RAB Assignment
Success Times
RAB Assignment Response
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
UE
Indicator
Extension
Signaling Flow
RNC
CN
RRC Establishment
Success Rate
DT Message Exchange
RAB Assignment Request
Radio Bearer Setup
Established
RAB
Establishment
Success Rate
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
CN
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Description
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Success flow
Signaling Flow
Indicator
Extension
UTRAN
Soft Handover
Attempted Times
A
ACTIVE SET UPDATE COMPLETE
B
UE
Failure Flow
UTRAN
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Success Flow
SRNC
Inter-frequency hard
handover Attempted times
Intra-RNC
Inter-Frequency
Hard Handover
Flow
Indicator
Extension
UE
Failure Flow
SRNC
Inter-frequency hard
handover failure times
Node B
Node B
Drift RNS
Serving RNS
Drift RNC
Decision to execute
Hard Handover
Relocation
Required
RANAP
RANAP
[A1]
[A2]
Relocation Request
RANAP
Inter-RNC
Inter-Frequency
Hard Handover
Flow
RANAP
NBAP
Radio Link Setup Response
NBAP
RANAP
RRC
NBAP
RRC
[B2]
RRC
UE Mobility Information
Relocation Complete
RRC
[B1]
RANAP
Iu Release
Command
RANAP
RANAP
Iu Release
Complete
RANAP
RANAP
NBAP
RANAP
RRC
NBAP
Relocation Detect
RRC
RANAP
RRC
NBAP
RANAP
RRC
RANAP
Relocation
Command
RANAP
RANAP
NBAP
Feedback to DRNC
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator Meaning: this indicator reflects the Inter-RAT CS handover mobility, the
handover is from UMTS system to GSM system.
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Success Flow
UE
RNC
Handover from
UTRAN command
CN
2GMSC
Relocation
required
Prepare handover
Relocation
command
Prepare handover
response
Handover complete
UE
Failure Flow
UTRAN
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Success Flow
UE
NODEB
RNC
Signaling Flow
Indicator
Extension
3G SGSN
Iu Release
Command
RL Del Req
RL Del Resp
Iu Release
Complete
UE
Failure Flow
UTRAN
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator Meaning: this indicator reflects the Inter-RAT handover mobility, the
handover is from GRRS system to UMTS system.
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
UE
Serving RNC
Signaling Flow
Indicator
Extension
CN
2. Direct Transfer
RNC received message RRC Connection Requestfrom UE, the cause is Inter-RAT
cell reselectioncan be used for calculating the PS Inter-RAT handover to UTRAN
required timesRNC received message RRC Connection Complete (From UE) can
be used for calculating the PS Inter-RAT handover to UTRAN success times
Indicator
Definition
Signaling Flow
Indicator
Extension
Statistic Period:
Statistic Area:
Measurement MethodDT&CQT
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
RNS
CN
Indicator
Extension
Incoming CN
TCC Alert
RRC DT (Alert)
RRC DT(Connect)
RRC DT(Connect ACK)
ISUP IAM
CN Bear Setup Process
ISUP ACM
ISUP ANM
Indicator
Definition
Signaling Flow
Indicator
Extension
Statistic Period:
Statistic Area:
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
RNS
CN
Indicator
Extension
Incoming CN
TCC Alert
RRC DT (Alert)
RRC DT (Connect)
RRC DT (Connect ACK)
ISUP IAM
CN bear setup process
ISUP ACM
ISUP ANM
Indicator
Definition
Signaling Flow
Indicator
Extension
Statistic Period:
Statistic Area:
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
RNS
Indicator
Extension
CN
Incoming CN
Activate PDP
Context
Request
Active PDP
Context Accept
RRC DT (Alert)
RRC DT (Connect)
RRC DT (Connect ACK)
ISUP IAM
CN bear setup process
ISUP ACM
ISUP ANM
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator Meaning: this indicator reflects the traffic Erlang of the CS conversation
service
Indicator
Definition
Signaling Flow
Indicator
Extension
CS Call Duration
TimeRadio Link Setup Response
TimeRadio Link Deletion Response
Indicator
Definition
Signaling Flow
Indicator
Extension
PS Service Throughput
Indicator
Description
Indicator
Definition
Signaling Flow
Indicator
Extension
PS Service Throughput
Indicator
Description
Indicator
Definition
Signaling Flow
Indicator
Extension
PS Service Throughput
Indicator
Description
Indicator
Definition
PS I 64/64 UL Throughput
PS I 64/64 UL Throughput
PS B 64/64 UL Throughput
PS B 64/64 UL Throughput
PS S 64/64 UL Throughput
PS S 64/64 UL Throughput
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Trouble Cell is the cell whose call drop rate >a or Radio Access Success rate <b
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Indicator
Definition
Signaling Flow
Indicator
Extension
Content
KPI Classification
RAN KPI Definition and Measurement
KPI Optimization
KPI monitor
KPI Case study
Cell RAB
Establishme
nt Success
Rate, CS
domain
Cell RAB
Establishme
nt Success
Rate, PS
domain
Cell RAB
Establish
ment
Success
Rate
Radio
Access
Succes
s Rate
Call
Drop
Rate Voice
Cell
PS
Call
Drop
Rate
Cell
Success
Rate of
SHO
Cell Inter-RAT
CS Outgoing
Handover Success
Rate(UMTS>GSM)
Handover area is too small, so that UEs have not enough time to
complete handover.
Handover parameters are wrongly set, so that neighbor cells
cannot be added or deleted timely, or causing ping-pong handover.
Neighbor cells are not configured. This may cause damage to the
network, not only directly causing call drop, but also brings extra
interference towards the network.
Content
KPI Classification
RAN KPI Definition and Measurement
KPI Optimization
KPI monitor
KPI Case study
threshold
UL Traffic
Code
CE
40%
100%
70%
0.5%
-98dBm
50
12
16
60%
60%
Related KPI
DL power monitor
2009-06-09
00:00:00
01:00:00
02:00:00
03:00:00
04:00:00
05:00:00
06:00:00
07:00:00
08:00:00
09:00:00
10:00:00
11:00:00
12:00:00
13:00:00
14:00:00
15:00:00
16:00:00
17:00:00
18:00:00
19:00:00
20:00:00
21:00:00
22:00:00
23:00:00
RNC Call Drop Rate,CS Traffic Volume, CS AMR(Erl) Number of rejected services,DCH downlink TCP limit
01:00:00
1.24%
851.54
56
02:00:00
1.07%
481.2097
22
03:00:00
1.09%
253.1742
12
04:00:00
0.70%
134.0175
5
05:00:00
0.61%
84.9817
11
06:00:00
0.54%
66.0458
11
07:00:00
0.64%
102.6633
31
08:00:00
1.06%
259.94
235
09:00:00
1.31%
658.3644
2262
10:00:00
1.11%
1242.4528
1875
11:00:00
0.91%
1798.6944
3261
12:00:00
1.04%
2266.3008
7064
13:00:00
1.09%
2629.905
8398
14:00:00
0.99%
2488.7411
3719
15:00:00
1.05%
2494.8219
7936
16:00:00
1.05%
2598.1903
10515
17:00:00
1.16%
2762.4531
11489
18:00:00
1.20%
2930.3844
9926
19:00:00
1.45%
3336.4133
22875
20:00:00
1.29%
2674.1925
5196
21:00:00
1.04%
1946.7989
1288
22:00:00
1.13%
1858.4106
616
23:00:00
1.32%
1818.2567
575
00:00:00
1.35%
1445.835
216
DL power monitor
0:0 1:0 2:0 3:0 4:0 5:0 6:0 7:0 8:0 9:0 10: 11: 12: 13: 14: 15: 16: 17: 18: 19: 20: 21: 22: 23:
0 0 0 0 0 0 0 0 0 0 00 00 00 00 00 00 00 00 00 00 00 00 00 00
2009-6-12 6
2 22 99 556649108471821954108121201760 66 9 19 13
2009-6-17 0
6 28 113187252 95 214261285367643 86 10 11 4
DL power monitor
Because high load cell often be with high admission failure, normally
we should fast downgrade to release radio resource ASAP. Avoid
handover user could not handover in the cell then call dropped.(this
action is only take effect in cell with much more PS users, if all users in
the cell is in CS service. It will not take effect).
Abbreviated
Name
UlDnMaxStg
DlDnMaxStg
Parameter name
Maximum Number of Degraded Uplink
Load Steps Every Time
Maximum Number of Degraded Downlink
Load Steps Every Time
Update
value
[1, 8]
[1, 8]
remark
Downgrade from
384kbps to 16kbps
Downgrade from
384kbps to 8kbps
DL power monitor
Abbreviated
Name
DlEbNo
UL capacity monitor
Call drop rate increasing not means UL capacity limitation, but call
drop increasing is the most common scene for limitation. Because call
drop rate is most cared KPI, and be observed every day.
7.00%
6.00%
5.00%
4.00%
3.00%
2.00%
1.00%
23:00:00
22:00:00
21:00:00
20:00:00
19:00:00
18:00:00
17:00:00
16:00:00
15:00:00
14:00:00
13:00:00
12:00:00
11:00:00
10:00:00
9:00:00
8:00:00
7:00:00
6:00:00
5:00:00
4:00:00
3:00:00
2:00:00
1:00:00
0:00:00
0.00%
UL capacity monitor
110
105
100
95
90
85
80
Maximum RTWP(dBm)1
Maximum RTWP(dBm)2
23:00:00
22:00:00
21:00:00
20:00:00
19:00:00
18:00:00
17:00:00
16:00:00
15:00:00
14:00:00
13:00:00
12:00:00
11:00:00
10:00:00
9:00:00
8:00:00
7:00:00
6:00:00
5:00:00
4:00:00
3:00:00
2:00:00
1:00:00
0:00:00
75
UL capacity monitor
30
25
20
15
10
5
23:00:00
22:00:00
21:00:00
20:00:00
19:00:00
18:00:00
17:00:00
16:00:00
15:00:00
14:00:00
13:00:00
12:00:00
11:00:00
10:00:00
9:00:00
8:00:00
7:00:00
6:00:00
5:00:00
4:00:00
3:00:00
2:00:00
1:00:00
0:00:00
UL capacity monitor
Abbreviated
Name
Parameter meaning
Modification object
Current
Value
new
value
effect
4-5
3.5
Obviously
15
10
Obviously
2/250
1/70
Obviously
0.1
0.2
A few
improvement
UL capacity monitor
ULINITSIR
ULMAXSIR
ULMINSIR
3.5->1.5
10.0->3.5
2.0->1.0
104
4.0->2.0
15.0->5.0
0.5->0
28
3.5->1.5
10.0->3.5
0.5->0
50
6.0->2.0
15.0->5.0
2.0->0
54
6.0->2.0
15.0->5.0
2.0->0
Abbreviated
Name
Parameter
name
Range
Current Update
remark
and Step Value value
DpchCodeHy
DPCH Code
0..512
Hysteresis
16
28
CodeUptHyA
Code Update
0..512
Hysteresis A
16
28
Content
KPI Classification
RAN KPI Definition and Measurement
KPI Optimization
KPI monitor
KPI Case study
Background
KPI Indication
Background
After the drive test and KPI analysis, we found the reason
is that the NSN LUR site F1 is still open.
After the site is turned off on 12th May the call drop rate
decreased.
Background:
KPI Indication:
Analysis
After 80% NSN UMTS users are cut into the network on may 11th,
subscriber number increased a lot
Capacity related.
After checking the related configuration, Iub interface E1/T1
bandwidth limitation is a key reason for the problem.
Solution: