Lecture
Piping Drawings
Piping drawings
Pre-requisites
Schematic, P&I drawings
Equipment G.A. drawings
Layout drawings
Restrictions
Space (X, Y, Z), movement
Piping outputs
B.O.M. for piping fabricator
Hangers, anchors/foundations, trenches
Piping (2005)
BEARING
SCHEMATIC
BRG
Z
Y
X
L.O.
TANK
Piping (2005)
Information Requirements
Position of each equipment
(L.O. tank, Bearing block, pump : floor plans, elevations)
Civil requirements
(beams & columns, walkway, maintenance)
Electrical requirements
(panels, cable trenches)
Piping Joints
Threaded
Accuracy (?), Metal/plastic. Plumbing
Flanged
Industrial pipes, low/medium pressure and
temperature. Metal/Plastic. Steam, oil, water,
Welded
Permanent; High pressure and temperature.
Industrial, Water, steam, oil, chemicals,
Water supply, sewage, large hydro - Concrete
Piping (2005)
Piping Joints
Threaded / Flanged / Welded
Piping (2005)
Piping Joints
Threaded / Flanged / Welded
Piping (2005)
FLANGE 2
BOLT-NUT
PIPE 1
PIPE 2
PIPE-FLANGE
WELDED or
SCREWED
Piping (2005)
Piping (2005)
Piping Joints
Threaded / Flanged / Welded
Piping (2005)
10
Piping Joints
Piping (2005)
11
Piping Bends
Tee (T)
Hydrodynamics.
Space.
Piping (2005)
12
13
BEARING
Piping (2005)
14
ISOMETRIC
PLAN
ELEVATION
Piping (2005)
15
ISOMETRIC
PLAN
Piping (2005)
ELEVATION16
PLAN
ISOMETRIC
ELEVATION
Piping (2005)
17
Pipe supports
Foundation
Hanger
Rack
Clamp
Underground foundation
Rigid - anchor vs. flexible allows pipe to move
All along pipe length (at regular intervals?)
Piping (2005)
18
Piping (2005)
19
Piping Examples
Oil pumping station, Central A.C. system,
Piping (2005)
20
Piping (2005)
21
Lecture summary
Using schematics/P&I diagrams make piping
drawings (routing), to scale, with material
and other specifications (e.g. standards)
NEXT STEP : Piece-wise design and