REMEDIAL WORKS
27 September 2013
Red River Bridge Construction Project
Package 1
Method I
Method II
Sound Pile
Defective Pile
Group A
Summary
of
Constructed Piles
Before
25th Nov, 03
Pier No.
P1
P2
P3
P4
P7bL
P7R
Total
584
Sound 410
Defect 174
Gia Lam
River
Thnah Tri
P8
P9
P10
P11
P12
P15
P16
P17
P18
P19
P20
P21
P23
P24
P25
P28
P29
P30
P31
P32
P33
P34
P43
P44
P45
Pile
No. of
Length
Piles
(m)
43.0
44.5
47.0
45.5
47.0
47.0
L45.0
R44.5
46.85
47.35
52.0
52.0
49.0
53.5
54.5
54.0
56.35
37.5
34.85
25
29.8
32.5
29.0
41.5
42.0
42.0
43.0
39.0
39.0
34.5
35.0
32.5
Before
25
Nov/2003
16
16
16
16
8
8
9
16
2
2
1
5
40
40
32
16
16
24
16
16
16
16
32
32
64
49
64
32
18
18
18
18
24
18
16
32
40
After
25
Nov/2003
Group B
Group C
Group D
Group E
DL<1.0m
1.0<DL<3.0
3.0<DL<5.0
DL>5.0m
Injection
Grout
Total of
Defective
2
-
1
2
4
-
7
3
35
1
9
10
3
1
5
3
10
3
2
6
2
1
10
4
1
3
8
5
6
8
5
8
4
4
2
3
8
1
0
7
16
5
31
7
6
1
16
16
12
11
9
30
14
14
4
5
15
2
64
49
48
20
11
9
7
8
9
1
15
29
35
No. of
Additional
Piles
16
12
7
9
9
9
15
17
1
1
2
1
3
16
8
8
8
16
2
-
1
3
5
2
1
1
3
5
E 52 (8.9%)
D 38 (6.5%)
C 51 (8.7%)
B 33 (5.7%)
Total
584 piles
A 410
(70.2%)
Pressure Grouting
(50 to 60 kg/cm2)
METHOD I
(Injection Grout)
Sand Layer
Detail A
Gravel Layer
Sonic Tube
BORED PILE
Gravel Layer
DETAIL A
Non-Homogeneous Portion
Step 1
Boring
Step 2
Jet Testing
Step 3
Jet Grouting
Improved Section
R-PIER
Value
Grout
Mixer
Sonic Tube
Bored Pile
Bottom Opened
Pressure Grouting
(50 to 60 kg/cm2)
Sand Layer
Injection Grout
using 4 tubes
Detail A
Gravel Layer
Sonic Tube
BORED PILE
Gravel Layer
DETAIL A
Non-Homogeneous Portion
Suspected Length
Ls
Original Length: Lo
Le
Effective Length
Original Area: A
Effective Area
0.7 x A
Deduction Area
0.3 x A
Step 1
Boring
Step 2
Jet Testing
Step 3
Jet Grouting
Slime
Guide Hole (Dia. 140mm)
High Pressure
Water
Compressed Air
Cement Milk
Slime
Triple Tube (Dia. 90mm)
Compressed Air
High Pressure
Water
Compressed Air
Cement Milk
Slime
Slime
Slime
Guide Hole (Dia. 140mm)
Slime
Slime
Slime
Triple Tube (Dia. 90mm)
Total
174 piles
By Additional Pile
110 piles (63%)
Method - II