IBS Content Scoring System (IBS Score)

Jumlah keluasan pembinaan 1,000 m2


Keluasan penggunaan kaedah pasang
siap (precast) beam/column/slab
= 750m2 = 75%
Keluasan penggunaan kaedah
konvensional (insitu)
= 250 m2 = 25%
Table 1, for precast beam/column/slab, F = 1.0

Kaedah Penilaian
IBS Content Scoring System (IBS Score)

Jumlah keluasan pembinaan 1,000 m2


Keluasan penggunaan kaedah pasang siap
(precast) beam/column/slab
= 750m2 = 75%
Keluasan penggunaan kaedah
konvensional (insitu)
= 250 m2 = 25%
Table 1, for precast beam/column/slab, F = 1.0
Table 1, for in-situ, F = 0

Kaedah Penilaian
IBS Content Scoring System (IBS Score)

Jumlah keluasan pembinaan 1,000 m2


Keluasan penggunaan kaedah pasang
siap (precast) beam/column/slab
= 750m2 = 75%
Area using in-situ
= 250 m2 = 25%
From Table 1, for precast beam/column/slab, F = 1.0
From Table 1, for in-situ, F = 0
Maka, bagi Part 1 (Structural System) IBS Score
= ( (75% x 1.0) + (25% x 0) ) x 50%
= 37.5 %

Kaedah Penilaian
IBS Content Scoring System (IBS Score)

Jumlah panjang keseluruhan dinding


ialah = 10,000 m run
Panjang dinding panel pasangsiap (precast
panel)
= 7,500m = 75%
Panjang dinding bata (brick)
= 2,500 m = 25%
Table 2, panel pasangsiap, F = 1.0

Table 2, dinding bata, F = 0

Kaedah Penilaian
IBS Content Scoring System (IBS Score)

Jumlah panjang keseluruhan dinding


ialah = 10,000 m run
Panjang dinding panel pasangsiap
(precast panel) = 7,500m = 75%
Panjang dinding bata (brick)
= 2,500 m = 25%
Table 2, panel pasang siap, F = 1.0

Table 2, dinding bata, F = 0


Maka, jumlah score Part 2 (Wall System)
= ( (75% x 1.0) + (25% x 0) ) x 20%
= 15%

IBS Score Calculation


&

EXAMPLE

Example 1

2-storey Terrace House

Say, from measurement taken from drawings:


1) Construction area
i) Construction area ground floor
ii) Construction area 1st floor
iii) Construction roof area
Total construction area

=
=
=
=

117.0 m2
117.0 m2
117.0 m2
351.0 m2

2)Structural Systems
i) Beams:
ii) Columns :
iii) Floor slab:
iv) Roof truss:

Precast concrete beams


In-situ concrete using steel formworks
Precast half slabs floor
Prefabricated timber roof truss.

3) Wall System
i) Internal wall:
ii) External wall:

Precast concrete panel


Precast blockworks

Other simplified construction solutions


i) Beams:
Columns:

60% complies to MS 1064


100% complies to MS 1064

Walls and slabs: Less than 50% complies to MS 1064


Doors :

80% complies to MS 1064

Windows:

0% complies to MS 1064

ii) Horizontal repetition of structure = 100%

AREA (m2) or
Length (m)

ELEMENTS

IBS
FACTOR(1)

COVERAGE

IBS
SCORE

Part 1: Structure Elements


Precast beams + in-situ column with reusable formwork
+ precast concrete half slab floor.
Ground floor area = 117.0m 2

117.0 m2

0.9

(117 / 351)
=0.33

0.33 x 0.9 x 50
=14.9

Precast beams + in-situ column with reusable formwork


(no floor)
1st floor area = 117.0m2

117.0 m2

0.6

(117 / 351)
=0.33

0.33 x 0.6 x 50
=9.9

Roof truss using prefab roof truss


Roof area = 117.0m2

117.0 m2

1.0

(117/351)
=0.33

0.33 x 1.0 x 50
=16.5

1.00

41.3

351.0 m2

Total Part 1
Part 2: Wall System
External wall using precast concrete blockworks

87.8m

0.5

(87.8/167)
=0.52

0.52 x 0.5 x 20
=5.2

Internal wall using precast concrete panel

79.5m

1.00

(79.5/167)
=0.48

0.48 x 1.0 x 20
=9.6

1.00

14.8

60%

ii) 100% of column sizing follow MS 1064 Part 10: 2001

100%

iii) 80% of door sizing follow MS 1064 Part 4: 2001

80%

iv) Horizontal repetition of structure = 100%

100%

Total Part 2

167.3m

Part 3: Other simplified construction solutions


i) 60% beam sizes follow MS 1064 Part 10: 2001

Total Part 3
IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)

16
72.1

Example 2

18 Storey
Condominium

Say, from measurement taken from drawings:


1) Construction Area
Area for 1 unit of condominium
Lift lobby area
Area for 1 floor = [94.4 x 6 units + 140]

=
=
=

94.4 m2
140 m2
706.4 m2

2) Structural Systems
i) Tunnel formwork system
ii) Roof truss: prefab steel roof truss.
3) Wall System/ floor
i) precast blockworks (6 units + lobby area)= 263 m length
ii) Tunnel formwork (6 units + lobby area) = 120 m length
4) Other simplified construction solutions
i) Doors :
100% comply to MS 1064
Windows: 100% comply to MS 1064
ii) Repetition of floor to floor height
Vertical repetition of structural floor layout

=
=

90%
80%

AREA (m2) or
Length (m)

FACTOR

i) Tunnel formwork system


Total area
= 706.4m2 x 18 storey = 12,715m2

12,715 m2

0.60

12,715 / 13,421.4
=0.95

0.95 x 0.6 x50


=28.5

ii) Roof truss - prefab steel


Roof area = 706.4m2

706.4 m2

1.0

706.4/13,421.4
=0.05

0.05 x 1.0 x 50
=2.5

1.00

31.0

ELEMENTS

COVERAGE

IBS
SCORE

Part 1: Structure Elements

Total Part 1

13,421.4 m2

Part 2: Wall System


i) Internal wall: precast blockwork
Total length
= 263 m x 18 storey

4,734

0.5

4,734/6,894 =0.69

0.69 x 0.5 x 20
=6.9

ii) Tunnel formwork


Total length
= 120 m x 18 storey

2,160

0.6

2,160/6,894 =0.31

0.31x 0.6 x 20
=3.72

1.00

10.6

i) 100% door sizes complies to MS1064

100%

ii) 100% of windows complies to MS1064

100%

iii) Repetition of floor height = 90%

90%

iv) Vertical repetition of structure floor layout = 80%

80%

Total Part 2

6,894

Part 3: Other simplified construction solutions

Total Part 3

12

IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)

53.6

Example 3

Ibs score for project (group


of buildings)

Project information:
- Main buildings in the development consist of 5 blocks of buildings. The
IBS score for each building are:i) Block A - 5 storey apartment
Construction area, QST (building)A
IBS Score(building A)

= 3,000 m2
= 83

ii) Block B - 5 storey apartment


Construction area, QST (building)B
IBS Score(building B)

= 3,000 m2
= 87

iii) Block C - 4 storey apartment


Construction area, QST (building)C
IBS Score(building C)

= 3,200 m2
= 35

iv) Block D - 4 storey apartment


Construction area, QST (building)D
IBS Score(building D)

= 3,200 m2
= 47

v) Block E - 3 storey office block


Construction area, QST (building)E
IBS Score(building E)

= 3,000 m2
= 75

Total construction area (block A + B + C + D + E ) = 15,400m2

IBS
Score(building)

IBS Score(project)

3,000

3000 /
15400 =
0.195

83

0.195 x 83 = 16.2

3,000

3000 /
15400 =
0.195

87

0.195 x 87 = 17.0

3,200

3200 /
15400 =
0.21

35

0.21 x 35 = 7.4

3,200

3200 /
15400 =
0.21

47

0.21 x 47 = 9.9

3,000

3000 /
15400 =
0.195

75

0.195 x 75 = 14.6

Total

15,400

Block

Construction
Area (m2)

Coverage

1.0

65.1