OEE
Definition
Making OEE
part of Visual
Management
OEE
Overall Equipment
Effectiveness
How can i
influence
the OEE ?
KANZEN
INSTITUTE
OEE
Calculation
Productive time
Effective time
KANZEN
INSTITUTE
Planned
Downtime
- breaks, planned
maintenance, training
Downtime
- breakdowns, repairs
- changeover
- adjustment
- start up
Performance
Losses
- machine speed
- short stoppages
- lower yield
Quality Losses
- scrap
- reject
- rework
Calculation of LOSSES
Total time
e.g. 480 min. (1 shift)
Planned
Downtime
- breaks, planned
maintenance, training
Running time
340 min.
Downtime
- breakdowns, repairs
- changeover
- adjustment
- start up
Productive time
270 min.
Performance
Losses
Quality Losses
- scrap
- rework
- rejects
Available time
420 min.
Effective time
250 min.
Total losses = 170 min / shift
KANZEN
INSTITUTE
Calculation of OEE
Running Efficiency =
Productive Performance=
Quality =
factor 81%
420 min
X
factor 79.4%
X
factor 92.6%
OEE (in %) =
= 59.6%
35
30
25
20
15
10
5
Scrap, rework
Autonomous Mainten.
Preventive Maintenance
Changeover reduction
Repair
Minor stoppages
Make improvements
visible and implement
33
ChangeoverTool change
26
16
Scrap
Minor Stopp.
OEE Trend
Target 2003
Standardize tooling
Improved machine
reliability
Standardisation
Kaizen
J F M A M J J A S O N D
KANZEN
INSTITUTE
Departement Information
Company Information
Data
J FMAMJ JASOND
J F M A M J J A S O N D
J F MA M J J A SOND
OEE
Produktivity
Target 2003
J FMAMJ JASOND
J FMAMJ JASOND
J FMAMJ JASOND
Analysis
35
30
25
20
15
10
5
J F M A M J J A S O N D
other
J FMAMJ JASOND
33
26
16
Scrap Min.Stop.
KANZEN
INSTITUTE
J F M A M J J A S O N D
company
OEE
in %
Date
.
Department
target
2003
2004
Measures
introduction training
removal of defects
elimination of defects
standards / check lists
improvement projects
KANZEN
INSTITUTE
8 availability losses
5 productivity losses
Machine failure
Management losses
Motion
Loss of energy
Tool changes
Line organization
Start-up losses
Logistics
Minor stoppages
Adjustments
Speed Losses
Defects and Rework
Shutdown
KANZEN
INSTITUTE
Yield losses