Beruflich Dokumente
Kultur Dokumente
LEVEL CROSSING
INTRODUCTION:
An automatic railway gate control at unmanned level
crossings replacing the gates operated by gate keepers
and also the semi automatically operated gates. It deals
with two things.
Firstly, it deals with the reduction of time for which the
gate is being kept closed.
And secondly, to provide safety to the road users by
reducing the accidents that usually occur due to
carelessness of road users and at times errors made by
the gatekeepers.
Allowing Forward
Current
Diod
e
Diode definition:-
Blocking Reverse
Current
Step Down
Transformer
Rectifier
Circuit
POWER SUPPLY
Bridge rectifier
230 V
AC
50
Hz
5v Regulator
5V
DC
12V step down
transformer
Filter(470f)
ELECTRICITY IN ACTION!
LED
OR GATE IC : 7432
RELAYS:
A relay is an electrically operated switch.
Many relays use an electromagnet to
operate a switching mechanism, but other
operating principles are also used.
USES OF RELAYS:
IR TRANSMITTER:
IR RECEIVER:
STEPPER MOTOR:
A stepper motor (or step motor) is a brushless,
synchronous electric motor that can divide a full
rotation into a large number of steps.
The motor's position can be controlled precisely
without any feedback mechanism, as long as the
motor is carefully sized to the application.
.
CHARACTERISTICS:
Stepper motors are constant power devices.
As motor speed increases, torque decreases.
Steppers exhibit more vibration than other motor types, as the
discrete step tends to snap the rotor from one position to another.
This vibration can become very bad at some speeds and can cause
the motor to lose torque (or lose direction).
ALGORITHM:
STEP 1: Start.
STEP 2: Set the variables.
STEP 3: Make initial settings of the signals for the train and
road users.
STEP 4: Check for the arrival of the train in either direction
by the sensors. If the train is sensed go to STEP 5. Otherwise
repeat STEP 4.
STEP 5: Make the warning signal for the road users and set
the signal for the train.
STEP 6: Check for the presence of the obstacle using sensors.
If there is no obstacle go to STEP 7. Otherwise repeat STEP 6.
STEP 7: Close the gate and stop the buzzer warning.
STEP 8: Change the signal for the train.
STEP 9: Check for the train departure by the sensors. If the
train sensed go
to next STEP. Otherwise repeat STEP 9.
STEP 10: Open the gate. STEP 11: Go to STEP 3.
STEP 12: Stop.
FLOWCHART
CONCLUSION:
The project is an approach to provide the security to our
INDIAN RAILWAY transportation. This electronics project
is developed for the reduction of human effort. This
electronic project is an approach to the modern
transportation system.
REFERENCE:
http://www.seminarprojects.com/search.php
WWW.SKITRONICS.COM
WWW.WIKIPEDIA.ORG
WWW.GOOGLE.COM