Ore Reconciliation
MGOQC
Sep 2014
Objective
Contents:
Technical Reconciliation
Procedure
Concept technical
Volume Reconciliation
Using same area at top & bottom ore survey measurement (with limited
measurement) at Sorowako we have about 33% loss at bottom profile that
not calculated at previous tonnage reconciliation method.
Original Topography
Over Burden
TOR BM
ROMOB
OBROM
TOR Actual
Our Survey
ROM (Ore Thickness Actual)
BOR BM
BZROM
BOR Actual
ROMBZ
Blue Zone
From volume reconciliation: + 33% Ore Loss from bottom profile (unmined reserves)
Data
Bottom Excavation : some area that have mined out sampling replace
original point to adjust real elevation of mined out
Mined Out (light blue), Disposal and Revegetation Area (dark blue)
Bottom excavation
Raw Data of Comparison New Block Model 1423pb1156s and Old Block Model
1319ptb1156s (Left part without using pit and right side using pit)
ROM reconciliation change about -41% absolute (-56% relative) from previous method and
chemistry is better.
Note: production report from cost prod section from 2011-2013 (all production) and block model calculation using
original topography and bottom excavation (not using week by week topography).
ROM reconciliation change about -44% absolute (-61% relative) from previous method and
chemistry is better (except for Co).
Note: production report from cost prod section from 2011-2013 (all production) and block model calculation using
original topography and bottom excavation (not using week by week topography).
Summary
Summary