Objectives
After completing this module, you should be
able to do the following:
Discuss the key functionality available in
Oracle cMRO
Planned &
Unplanned
Maintenance
Tear-Down
& Inspect
Repair /
Replace
Re-Install
Configuration Management
Regulatory Compliance
Improved
Aircraft
Reliability
Business Pressures
Aircraft on Ground
How do I minimize the
Cost Containment
Where are my highest
effects of unscheduled
repairs?
maintenance productivity?
Tear-Down
& Inspect
Regulatory Compliance
How do I ensure
compliance to FAA / JAA
regulations?
Repair /
Replace
Re-Install
Multi-Site Planning
& Scheduling
How do I aggregate/assign
inventory and resources?
Planning
Single, linear planning cycle that ignores cost / skills requirements
Maintenance
Requirements
Spares
Management
Cost / Skills
Analysis
Schedule
Operational
Challenges
Isolated Planning
and Execution
Reactive
Maintenance
Execution
Manual
Serial #
Serial #
AoG*
Serial #
Serial #
Serial #
Serial #
Serial #
Processes
Isolated View
of Inventory
Tail #1
Serial #
Serial #
AoG*
Maintenance
Requirements
Serial #
Repair /
Replacement
Document
Updates
Serial #
Serial #
Serial #
Serial #
Serial #
Configuration
Updates
*Aircraft on Ground
How
Delivers
Foundation:
Unified Information Architecture
Common data model
Develop
Contracts
Projects
HR
Finance
Market
Sell
Order
Customers,
Comprehensive suite of
applications designed to
work together
Suppliers,
Plan
Products,
Maintain
Procure
Modular deployment
by business flow
Service
Make
Fulfill
Maintenance
Planning
Create
Visit
Planned
Maintenance
Plan /
Receive
Tear
Down
Visit Work
Package
Update
Config
Unplanned
Maintenance
Inspect
Return to
Service
Repair /
Replace
Rebuild
Reinstall
Maintenance
Execution
Supply Chain
Management
Engineering
Data
Human
Resources
Contracts
Finance /
Costing
Oracle Cost
Management
Oracle
WIP
Oracle
Purchasing
Oracle Project
Manufacturing
Oracle
cMRO
Oracle Order
Management
Oracle
Quality
Oracle
Inventory
Oracle
WMS
Oracle
eAM
Oracle ASCP/
Oracle DP
Oracle BOM/ENG
Unit Configuration
As Installed / As Maintained
References
Allowable
Config.
System
Tail #
Serial #
Component
Primary
Alternate
Serial #
Component
Primary
Serial #
Serial #
Serial #
Serial #
Serial #
Serial #
Serial #
Serial #
Alternate
Corrosion
Inhibitor
Fleet
Sand
Filter
Ocean
Site 1
Site 2
Desert
Grouping or
Hierarchy
Site 3
Manage at the
737-800
757-300
737-700
777-400
737-800
Tail #
Tail #
Tail #
Tail #
Tail #
Unit Level
Link Directly to
Tail #
Fleet Maintenance
Program
Component Tracking
Active Unit
Shop
Airframe
TPM
(Jan 88)
(Oct 88)
(Feb 92)
(Dec 96)
(May 01)
A-1FP1
A105
Repair
A125
Retrofit
A-1FP2
B225
Replace
A145
Calibrate
B-1CP1
B255
Modify
B225
Modify
D-1FP4
C135
B255
D-1FP5
C195
C185
Tail #
Serial #
Serial #
Serial #
Serial #
Serial #
Airworthiness Directives /
Service Bulletins
Serial #
Serial #
Serial #
Scope / Coverage
n
Co
us
o
u
tin
at
d
Up
es
Base
Overhaul
Days
Years
Line
Base
Overhaul
Identify maintenance
Long
Term
Plan
Visit 1
Visit 2
Visit
Resources
Line
Base
Overhaul
schedules
Create reservations at assigned locations
Identify excess capacity
Base
Overhaul
Aircraft
Environment
Tail #002
Condition
Monitoring
Checks
Tail #003
FMP
Requirements
One-Time
Modifications
Tail #004
Aircraft
Usage
Out-of-Phase
Inspections
Log Book
Items
Deferred
Items
Forecasted Usage
Complex
MRO
UMP
Planned
Visits
Line
Base
Overhaul
Demand
Planning
Future requirements
Future requirements from visit
Exceptions
Global
Order
Promising
Demand
Fulfillment
Recommendations
Transfer
Procure
Service
Advanced
Supply
Chain
Planning
Time-phased
echelon stocking
recommendations
By location
By item
Inventory
Optimization
Customer
service level
Budget
Inventory
holding
min / max
Create Unit
Schedule (AC
availability for
Maintenance)
Create Transit
Check Visits
through
open API
New Visit or
changed
Schedule
Identify
Maintenance
Opportunities
Update Transit
Check Visits
through
open API
Release Visit to
Production &
Create Work
Orders
Select non
routine for
deferral
Execute
Workorders
Close Visits
M & O Procedures
are automatically
added to the visit
Reschedule
deferred non
routine to another
visit
Aircraft Utilization
Forecasts
Maintenance
Requirements
Unit Configuration
Actual Aircraft
Utilization
Schedule Visit
- Assign Hangar
Space
- Run Material
Demand
- Level Resources
- Simulation Plans
Calculate Due
dates for
Maintenance
Requirements
Associate
Maintenance
Requirements to
Visits
Production
- Issue/Return
Material
- Defer WorkOrders
Identify Non Routine
Close Visit
Customer
Service
Requests
Release Visit to
Production
Production Planning
- Identify Addl.
Resource Reqs.
- Identify Addl.
Material Reqs.
- Assign Resources
Calculate Due
Dates for
Maintenance
Requirements
Engine
Performance
Monitoring
Associate
Maintenance
Requirements to
Visits
Engine Line
Production Planning
Production Conrol
Module Line
Module Disposition
In House
Vendor
Material
Planning
Create Non
Routine Work
Orders
Material Demand
Planning
Supply Chain
Fullfillment
Production Execution
Inventory
Marshalling
(Serial Number
Reservation)
Register all
technical documents
Schematics
Online
Access
Text / Scanned
Reference maintenance
objects
Route Management
Create
Work / Task
Cards
Define Work
Instructions
Templates /
Workflow-Driven
Revision Control
Approvals
Quality Plans
Established Work
Steps
Overhaul Disposition
Actions
Establish
Resource
Needs
Labor Skills
Tools and
Equipment
Spare Parts
Associated Documents
Your Company
OEMs
Operator
Role-Based Access
Collect / aggregate data
Analyze information
Distribute results
Closed loop
Corrective action
Integrated
Enterprise
Repository
3rd Party
Maintenance
Providers
Maintain Complex
Configurations
Effectively Plan
Enterprise-Wide
Operations
Optimize Maintenance
Execution
Summary
You should now be able to do the following:
Discuss key functionality in Oracle cMRO