Beruflich Dokumente
Kultur Dokumente
TEAM MEMBERS :
OBJECTIVE:
METHOD OF STUDY
Area Analysis
Environmental Assessment
Site Inspection Study
Wind
Temperature
Humidity
Fire
Rain
Theft
Sabotage
Violence
Traffic
Breakdown
Shutdown
Lightning
Animals
Air
Quality
SEVERITY:
The Fence
The Fence
Area
Workshop
Porto-cabins
Civil
Yard
PMO OFFICE :
Reception :
Exit Sign Board
Emergency Preparedness Training
Emergency numbers to be displayed
Fire fighting training should be provided
Periodical electrical preventive
maintenance to be ensured
Unwanted holes & openings to be closed in
all cabins
Regular housekeeping.
Emergency Exit Route display
PMO OFFICE :
Document Room :
Data Backup to be secured outside of PMO.
Documents to be kept above floor level.
Document Rack not to be kept under the Air
conditioning unit
CCTV Security System to be installed
Fire fighting training
Duplicate office keys in different location.
Restrict Unauthorized person's entry
PMO OFFICE :
Office Rooms :
Locker for accounts section.
Smoke detectors in accounts Room.
PMO OFFICE :
Xerox & Server Room :
Proper access to be ensured
Pantry Room :
Display do/dont do's instructions
Flammable material should not be stored
Flammable stove / coil stove should not be
used
Heat / Smoke detector to be provided
Provide Pest o flash Light
Regular housekeeping
PMO OFFICE :
Staff Toilets :
Cleaning frequency to be increased & Pest
Control to be ensured
Smoke detector
Additional Toilet
Staircase :
Reflecting Stickers on steps
Emergency light in new office entry
PMO WORKSHOP:
PMO Workshop Area :
Insurance Coverage shall be ensured
Close the gap between new office & main office
Water coolers cable to be changed
Relocation of water heater near to staircase
Overall cable management to be improved
Electrical cable dressing to be ensured
Access way shall be free from obstacles
Entry / Exit sign boards
PMO WORKSHOP:
Removal of unwanted electrical cables
Removal of existing exhaust fan (wall mounted)
Fire Hydrant system to be provided
EOT Crane stopper (l/t) shall be strengthen
Periodical electrical maintenance
Unwanted holes & openings to be closed in the
walls / floors
Regular housekeeping
PMO WORKSHOP:
PMO Valve Shop :
Focus lights to be changed
Proper arrangements of material storage
Pressure equipments sign boards to be provided
Structural earthling should be done
Supports for pressurized water hoses to be
provided
Piping Material open yard :
Proper Arrangement of materials
Access from the rear side of the yard should be
free from obstruction
Regular housekeeping
THANK YOU