Construction challenges
INTRODUCTION
A circular railway of 57.9 km metro system on two corridors
Phase-I 12.9 km - Rajajinagar to Jayanagar
Phase - II 11.2 km-Hudson Circle to Krishnaraja puram.
Phase III
Phase IV
INTRODUCTION
CLIENT :
REACH- IV -3 STATIONS
:
18.10 kms
North-South Corridor :
24.20kms
Total
:
42.30 kms
Elevated
:
32.85 kms
At grade (at ground level)
00.65 kms
Under ground
08.80 kms
Gauge
standard gauge
Traction
750 v Dc third rail
No of stations
39(31 elevated,8 Ug)
Travel time
33/44 mins (end to end)
Head way
4 mins at start ; later 3 mins
Productivity
Progress
STAGE 1
12M
6M
6M
STAGE 1
PIER
ERCT THE BARRICATION
6M
6M
b) Construction stage,
Noise pollution
Air pollution
Traffic diversion
Utility diversion
Working hours
Govt)
(BBMP,BWSSB,BESCOM,KPTCL,BSNL etc)
Challenge 5: safety
Safety
Ballet post
Challenge 6: Environmental
aspects
Some of the environmental components
considered under this are
1. Trees
2. Air pollution
3. Noise levels
4. Soil erosion and pollution
5. Disposal of excavated soil and debris
6. Maintaining of roads/Drainages
Resource