STC-4G3 minishelter

installation standard
for DBS solution
www.huawei.com

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.

1. Minishelter

Rectifier
2G/3G
Battery 4G4G-TDD
FDD
MW

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page2

1. Minishelter

Battery

Rectifier
2G/3G
4G4G-TDD
FDD
MW

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page3

1. Minishelter

The technology cabinet should be closed to


tower side

Battery
cabinet

Technology cabinet

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page4

1. Minishelter

The cabinet should be fixed on the ground.

The cabinet should be parallel.

Front view

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page5

Back view

1. Minishelter

The minishelter grounding bar should be installed at the outside


bottom of the technology cabinet(closed to the tower).

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page6

1. Minishelter

All signal cable and power cable should


be put in the flexible pipe.

All cable hole should be cover by sealing


mud.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page7

1. Minishelter

All cable terminals should be installed in


the shrink pipe.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page8

1. Minishelter

Attach the lable for each cable.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page9

2. Technology cabinet

The smoke sensor should be on


the left top of the minishelter.
The door sensor should be on
the right top of the minishelter.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page10

2. Technology cabinet
Air-con 1
Air-con 2

MW

LAMP
G

should be connected as design.

4G
3G/2

All the technology power cable

Air-con Ac out

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page11

2. Technology cabinet

Attach the lable for each cable and rectifier.

Install the terminal lugs for each cable.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.

2. Technology cabinet

2G/3G BBU should be connected to 1


DCDU.
The DCDU of
2G/3G.
FDD&TDD BBU should be connected
to 1 DCDU.

The DCDU of FDD &TDD.

MW ATN should be connected to 1DCDU.


The DCDU of
MW.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page13

2. Technology cabinet

All technology equipment should be


installed the ground cable.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page14

2. Technology cabinet

The GBS should be installed on the right top of the cabinet.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page15

2. Technology cabinet

The temperature-humidity sensor


should be installed in the left middle
of power cabinet.

DBS site

temperature-humidity
sensor

door & smoke transfer


board

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page16

2. Technology cabinet

The water sensor should be installed on the


right bottom of the power cabinet.

LAMP should be put on the power cabinet.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page17

2. Technology cabinet

The output port of the door &


smoke transfer board should be
connected to the alarm board.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page18

2. Technology cabinet

The input port of the door & smoke


transfer board should be
connected to the sensor.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page19

2. Technology cabinet

Unused door port of door and smoke


tranfer board should be shorted.

Unused smoke port of door and


smoke tranfer board should be open.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page20

2. Technology cabinet

The signal cable, power cable and technology


cable should be divided from the cable hole.

The equipment and cabinet ground


cable should be divided.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page21

2. Technology cabinet

The LAN cable on the door is useless,


dont connect any cable.

The door holding stick is on the


bottom of the cabinet.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page22

3. Battery cabinet

The smoke sensor should be

The door sensor should

on the left top of the

be on the right top of the

minishelter.

minishelter.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page23

3. Battery cabinet

The door holding stick is on the

The cabinet should be installed the

bottom of the cabinet.

ground cable.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.

3. Battery cabinet

The battery power cable should be

The battery sensor should be on the

installed as design.

bottom of the battery cabinet.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page25

3. Battery cabinet

The AC power cable should be connected as design.

AC OUT
circuit
break

L
N

Air-con 1

Air-con 2

L
N
L

AC socket

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page26

Loop the L
cable
Loop the N
cable

3. Battery cabinet

The battery liquid pipe should be

The battery cell cover should be

installed for each battery string.

installed for each battery cell.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page27

3. Battery cabinet

The battery cable switch cover should be installed.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page28

4. Alarm cable

Attach the lable for alarm cable.

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page29

4. Alarm cable

ALM1 to ALM 8 and DIN3 to DIN6 alarm cable should be installed as design.
ALM1 to ALM8

DIN3,DIN4,DIN5, DIN6

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page30

Alarm
Num.
Severity

BTS
ETP48200
Board
Alarm
Indicator
port

External Alarm Name

Alarm
Type

Alarm ID

Alarm cable

Telecom shelter AC power


fail

ALM1

NO

65110

White/orange+,
Orange-

Telecom shelter battery discharge

ALM2

NO

65108

white/green+,
green-

Critical Rectifier fault

ALM3

NO

Warning Telecom shelter tower light

ALM4

NO

65107

Critical Telecom/General shelter fire

ALM5

NO

65103

Critical

NO

65105

NO

65104

NO

65101

Critical

Critical

7
8

UPEU-(19)
EXT-ALM1

Telecom shelter high


ALM6
temperature
UPEU-(19)
EXT-ALM0
Telecom/General shelter
Critical
ALM7
door
Telecom shelter air condition
Minor
ALM8
fault

65125

Alarm port
DIN3

Alarm cable
Tower light alarm

Relay
Relay ALM4

DIN5
DIN6

A/C alarm1
A/C alarm2

Relay ALM8

Copyright 2012 Huawei Technologies Co., Ltd. All rights reserved.


Page31

white/blue+,
blue-
white/brown ,
BrownWhite/orange+,
Orangewhite/green+,
Bluewhite/blue+,
Green
white/brown ,
Brown-

Thank you
www.huawei.com

Das könnte Ihnen auch gefallen