Sie sind auf Seite 1von 23

Madhav Solar (Vadodara Rooftop) Private

Limited

Be a partner of Madhav Group to develop Vadodara into Solar city

Who we are?
A fully integrated Engineering
company that provides :
Designing
Supply
Flaw less Execution
Efficient Operation and maintenance

All under one roof

Presence in following Sectors

Solar Photo Voltaic Power Plants.


Small Hydro Plants.
Roads & Highways.
Oil and Hydrocarbons.
Urban Infrastructure.
Residential Townships.

Recent Achievement

Solar Projects Executed by Madhav


Group

Projects Under Execution by Madhav


Group
Client
name

Expected
date for
completion

1 Development of 5 MW Solar Rooftop Projects in


Vadodara city.

MGVCL

Dec 2014

2 Development of 11.4 MW Solar PV Project,


Karnataka

KREDL

Oct 2014

3 Development of 17 KW Solar Rooftop Project, Surat

Multi
Fabrics

June 2014

4 Development of 17 KW Solar Rooftop Project, Surat

Fancy
Fabrics

July 2014

5 Development of 80 KW Solar Rooftop Project,


Vadodara

Aspire
Confra

Sep 2014

6 Development of 4.2 MW Solar PV Project, Mansa,


Punjab

PEDA

April 2014

7 Development of 5 MW Hydro Power Project,


Barvi ,Thane

MIDC

Feb 2014

Project Name & Location

Partner with Madhav Group


to develop Vadodara Solar
City

Under the Gujarat PV Rooftop Solar Programme


Madhav Grouphasbeen awarded to develop KW
level MW Scale rooftop projects in the City of
Vadodara.
Madhav Group will install & maintain Solar PV
Power System on selected rooftop in Vadodara city.
Roof owner will be benefited from Green incentives
at the rate of Rs 2/KWh(unit) generated from the
Solar Power System installed on his roof.

Project Implementation Structure

Rooftop Solar Projects key


Parameter
Requirement for Plant design:
Area required for the 1 KW Solar PV system will
range from 110 - 130 Square feet.
Expected Annual generation of power will range
from 1550 - 1650 units / KW installed capacity.
Roof owner will get green incentives at the rate
of Rs 2/KWh(unit) generated from the Solar
Power System installed on his roof.
Shadow free plain roof will be preferred.

Rooftop Interconnection DiagramIndividual household (having 3 phase


connections/ Institutional Buildings
(6 kW -100kW)
-----

Rooftop Interconnection DiagramInstitutional Building/ Set of Buildings


( HT customers)
(100kW and
above)
-----

Rooftop Pictures

Illustration for Revenue Generation


of Rooftop Owner considering
shadow free roof
Installed PV Roof
Capacity
Size
(KW)
(Sq. Ft)

Expected
Generation
(Units/Year)

Expected
Revenue for roof
owner (Rs/Year)

650

7750

11500

10

1300

15500

31000

15

2000

23520

47040

25

3250

38750

77500

40

5200

62000

124000

50

6500

77500

155000

75

9750

116250

232500

100

13000

155000

310000

150

19500

232500

465000

200

26000

310000

620000

(Note :1 Sq mtr equals to 10.76 Sq feet)


Above calculation is for first year, considering 1550 unit generation per year. From second year the generation
get degraded by 0.7-1% annually

Advantages for Roof Top


Owners
The Roof Top Owner will have access to a
continuous revenue through a Green Incentive of Rs
2/unit energy generated from system installed on
the roof.
No capital investment & Recurring cost for Rooftop
Owner.
Rooftop solar Power system boost building thermal
Insulation thus decreasing building temperature by
about 5 degree during day time.
Above cooling effect results in saving of electricity
consumption by cooling system of the building,

Increase in Status and Value of Property by tagging it


as a Green building.
Optimization of Rooftop area to deliver maximum
value to Rooftop Owner.
Contribution to the environment by Reducing CO2
Emission at the rate of 1.5 tonne/KWh/Year.
Support for public affairs
Responsibility initiative.

and

Corporate

Social

Opportunity to Partner with Madhav Group


development of Aapnu Vadodara Solar City.

in

Milestones in Solar Rooftop PV


Projects in world
California has achieved installation of 1.5 GW of
Solar Rooftop PV Project till November 2013.
Japan has completed 10 GW of Solar PV Projects out
of which more than 90 % are from rooftops.
LA has launched its ambitious rooftop solar scheme
to complete 150 MW of Solar Rooftop Projects.
Germany has announced 52 GW of Solar PV project
capacity to be installed in next 3-4 year.

Milestones in Solar Rooftop PV


Projects in India
Government of Gujarat has already completed 5
MW Gandhinagar Solar Rooftop Programme.
SECI has announced its ambitious project for
implementation of Solar Grid Connected Rooftop
projects in various Cities of India.
Various states like Tamil Nadu, Andhra Pradesh &
Kerala have already introduced incentives for
encouraging installation of Rooftop solar power
projects.

Who can participate for Solar


PV Installation in Vadodara
Solar Rooftop Programme

Residential Buildings

Malls

Manufacturing Units

Educational Institute

Hospitals

Sports Complex

Das könnte Ihnen auch gefallen