Sie sind auf Seite 1von 38

Optix RTN 900 Series

Configuration Guide
U2000 Web LCT
V100R008
Prepared By Muhammad Farooq

This Document Will Guide each and


every step of Configuration RTN
series using Web LCT U2000
How to Configure a new Link
How to Configure ETH services
How to Configure TDM Services
How to cascade Two RTNs
How to make visible RTN on
NMS
Prepared By Muhammad Farooq

How To LOG IN RTN


1. Connect One End of a straight
Cable with Laptop LAN port
and other end with NMS/EXT
port of RTN on CSHO card

NMS / EXT
Port
Prepared By Muhammad Farooq

2. Assign IP to Laptop : 129.9.9.9


and subnet Mask : 255.255.0.0

Prepared By Muhammad Farooq

1. Make sure your Laptop is connected with RTN and


connection is established
2. Open Web LCT software . Starting black window will
open and then LOGIN page will open
User Name : admin
Password : Huawei@123 (For the very first time enter the
password Changeme_123 and then click login

User Name :
admin
Huawei@123
Enter the code

Prepared By Muhammad Farooq

3. Go to NE search and click advance


search
Search NE window will open

Click on advance search

Prepared By Muhammad Farooq

4. Make sure you are searching NE in


the same domain that you assign to
your Laptop
Then click search NE

Domain Must be same

Prepared By Muhammad Farooq

IF RTN is connected with NMS then It will Search


Many Non GNE NEs . Click on GNE and the click
on ADD NE . NE will be added to main page

Prepared By Muhammad Farooq

To Login NE

Prepared By Muhammad Farooq

5. Select the added NE and click on


NE Login
Then NE Login Window Will Open
User Name : lct Password :
password

Prepared By Muhammad Farooq

10

6. Click on NE Explorer after Login . NE


Explorer Window will open . This is the
Slot Layout of RTN

Prepared By Muhammad Farooq

11

When you are configuring a new RTN


first you have to Add all physical
boards that you are inserted in IDU .
All newly inserted board will show in
Light green color . Click on Add
Physical Board .Color of newly
inserted boards will change into
Dark green color which shows that
installed boards are running properly
. Do switch on the ODU radio . ODU
will appear in on the top against
each ISV3 card respectively . Add
Prepared By Muhammad Farooq
the ODU

12

Before starting the configuration make sure that


all boards are running properly that is all boards
must be in green color

Prepared By Muhammad Farooq

13

7. Go to Configration MW Link Configration .


Configration Window will open select the card
which you need to configure

Prepared By Muhammad Farooq

14

Configuration window will open .


Here you need to enter B/m values
Protection (1+0 /1+1/XPIC ) According to plan given by
client
IF Channel (given in the row of Radio Model of Link Budget
( 38G_XMC2_128Q_28M_161M ) here 28 Mhz are the
channel spacing
Modulation Mode (38G_XMC2_128Q_28M_161M ) Here
128 QAM 161MBPS are the modulation Mode
TX frequency ( Given in the row of TX Channels of LB )
TX power ( Given in the TX power dbm Row of LB )
Put the TX status to unmute

Prepared By Muhammad Farooq

15

Prepared By Muhammad Farooq

16

Click Apply

Prepared By Muhammad Farooq

17

8. Go to configuration NE attribute and modify the b/m


parameters
NE
Name i.e. NE 15-512 Wadi Daqa Dam
NE ID 512
Extended ID 15

Prepared By Muhammad Farooq

18

Now your Link is configured you can


start the Alignment
Note :
Before starting the Alignment you
must check the interference .
First turn off the ODU of Near End
and check RSL of Farend if RSL is at
-90 dbm then there is no
interference . Repeat the same
procedure at the farend to check the
interference at both ends
Prepared By Muhammad Farooq

19

9. Go to NE time localization and set the


time zone (UTC + 4 : 00 ) Asia / Muscat

Prepared By Muhammad Farooq

20

10 . Go to NE Time Synchronization and put the


Synchronous mode to NM and then synchronized
with NM Time

Click here

Prepared By Muhammad Farooq

21

11 . Go to NE Performance and
enable 15 minutes and 24 hours
performance

Check this Box

Check this Box


Apply

Prepared By Muhammad Farooq

22

12 . If you need to connect RTN with ATN Node then Go to


communication Communication Parameters . A new Window
will open
and enter
the b/m values
IP (Provided
by customer )
Subnet Mask (Provided by customer )
Gateway (Provided by customer )

Prepared By Muhammad Farooq

23

For Physically connectivity RTN to


ATN connect one end of the straight
cable to the RTN port GE 1 , GE 2 .
And connect the other end to the
ATN port as instructed by IP
personnel Normally FE0 FE1 ports
are used
Note :
Before connecting make sure that
ATN ports are enabled you may ping
the IP of ATN to check the port
status
Prepared By Muhammad Farooq

24

Configuring LAG (Link Aggregation


group
)
Link aggregation allows multiple
links that are attached to the
same equipment to be aggregated
to form a link aggregation group
(LAG) so that the bandwidths and
availability of the links increase.

Prepared By Muhammad Farooq

25

RTN 950 A Ports / Slots


GE 1 GE2 GE3 GE4 are used
for 3 G
GE 5 and GE 6 are used for 4
G
If you need to configure 1+1 Link
you will use the slot pairs
1-2
3-5
4-6
Prepared By Muhammad Farooq

26

Scenario 1:
There are 2+0 XPIC links. V-1 & H-1 form one XPIC group one XPIC group
on frequency spot-1 & V-2 & H-2 form another XPIC group on frequency
spot-2

Scenario 2:
There are both 1+0 and 1+0 XPIC links.

Scenario 3:
There is 1+0 link & 1 XPIC SD link. V-M is vertical main & V-D is vertical
diversity & H-M is Horizontal Main & H-D is Horizontal Diversity.

Prepared By Muhammad Farooq

27

Scenario 4 :
There is 1+0 link & 1 XPIC SD link. V-M is vertical main & V-D is vertical
diversity & H-M is Horizontal Main & H-D is Horizontal Diversity.

Scenario 5:
There is 1+0 XPIC & 1 XPIC SD Link.

Scenario 6:
There only 1+1 XPIC-SD links.

Prepared By Muhammad Farooq

28

Configuring ETH & TDM Services


13 Configuring ETH Services
Go to Interface Management
Ethernet Interface . A new window
will open showing ports
configuration
Note :
For 3 G Set 17 EG6 1 port to
100 M full Duplex working Mode
For 4 G set the port on 1000 M
full Duplex working Mode
Prepared By Muhammad Farooq

29

Enabled the Port


Encapsulation Type must be
802.1Q
Prepared
Working
Mode Must be 100 M
By Muhammad Farooq

30

Go To Ethernet Service Management


E LAN Service

Prepared By Muhammad Farooq

31

For New services click New .A new


window will open and put the service
Name . Then click on Get UNI Port

Prepared By Muhammad Farooq

32

A New will open showing Available ports


and selected ports . First Select the board
i.e. 17 EG6
Now in selection Window do select the
available free port on which you connect
the cable of Node B 17 EG 6 -1 (Port 1 )
17 EG 6- 6 (port 6)
put the LAN ID against selected port as
per plan
Now do select the IF board to Synchronize
EG 6- 1 with ISV3 Ports . Also put the LAN
ID as per plan and click ok .
Configured ports will visible in the below
window .
Prepared By Muhammad Farooq

33

Prepared By Muhammad Farooq

34

Selected Ports will visible there along


with configuration

Prepared By Muhammad Farooq

35

14 Configuring TDM Services .


Go to Configuration SD H /
PD H serv ice m anag em ent and
click on new . A new w indow
w ill open .
Select the source card . A nd
av ailable tim e slot .
Select Sink card and sink
tim e slot and do apply

Prepared By Muhammad Farooq

36

Prepared By Muhammad Farooq

37

14 - If you Need to connect New


RTN with Existing RTN then fallow
below steps
For NMS visibility Connect NMS
port of Existing RTN with EXT port
of New RTN through a straight
cable . After connecting this all
sites must be visible when you
login the New RTN
Connect available GE 1 port of
Existing RTN with GE1 port of New
RTN .
Prepared By Muhammad Farooq

38

Das könnte Ihnen auch gefallen