Production Planning

(PP)

- Overview -

Overview

Components of Production Planning


Production Process Overview
Planning Process Overview
MRP
Elements of a Production Order

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

Components of Production Planning

MRP

Production
Planning
(PP)

Production
Planning
Product
Cost
Planning

Master
Data

KANBAN
Repetitive
Mfg.

SOP
DRP

January 2008

Production
Control

Capacity
Planning

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

Planning Process
Execution

High Level Planning

Procurement
Process

CO/PA

Detailed Planning
Forecasting

Sales and Operations

Demand

Planning

Management

MPS

Sales Information

MRP

Manufacturing

System

Execution

Order
Settlement

Execution
January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

Material Requirements Planning


A set of techniques utilizing bills of materials,
inventory data (lead times and current status) and
the master production schedule to calculate
requirements for raw materials, components, and
subassemblies
A time-phased planning tool with a defined, specific
algorithm
Balances supply and demand

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

MRP Process
Outputs

Inputs
M
R
P

Planning
Rules
Master
Bill of
Schedule Material
Inventory Forecasts

January 2008

Orders

P
r
o
c
e
s
s

Recommended Recommended
Procurement
Production

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

Material Requirements Planning


Elements
Requirement elements (demand)
Withdrawals from inventory
Maintenance must be done at source of demand
Two types of demand

Replenishment elements (supply)


Receipts into inventory
Maintenance can be adjusted manually

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

Elements of A Production Order


Work
Center

Raw Materials &


Sub-Components

Bill of Material

Production
Order

Operations

Components
(Production Parts

Production
Routing

List)
January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

Organizational Data

Client
Company code
Plant (shipping plant)
Storage location

Work center location

Production Process (Make-to-Stock)


Production
Proposal
(Planning/Other)

Capacity
Planning

Schedule
and Release
Shop Floor
Documents

Order
Settlement
Goods
Issue
Goods
Receipt

January 2008

Completion
Confirmation

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

10

Organization
Plant specific organizational units
Materials Requirements Planning controller
Production controller/production scheduler/planner group
Person responsible (financially)

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

11

Organization
Non-plant specific organizational units
Capacity planner

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

12

MRP Control Parameters


Environment
Number range

Master Data
Materials Requirements Planning controllers
Float times

Planned Orders
Conversion order type
Dependant requirement availability

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

13

MRP Control Parameters (continued)


Planning run
Bill of Material (BOM) selection
External procurement
Planning horizon

Availability Check
Material
Production Resource/Tool (PRT )
Capacity

Scheduling Control Parameters

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

14

General Planning Parameters


Order Type Control Parameters
Types of routings, BOMs per order type: manually or
automatically
Availability checking

Create Confirmation Parameters


Reservations
Status Updates

Define Valuation of Goods Received


Moving Average Price Control evaluation

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

15

Material Master Planning Parameters


Materials Requirements Planning views for
materials
Work Scheduling views for manufactured products

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

16

Business Rules and Parameters


Automatic postings (account determination)
COGS, Material consumption, inventory

Activate MRP
Availability checks
Scheduling parameters
Order parameters
Confirmation parameters
Planning parameters
Consumption based planning
MRP

Master Data
Master data is relatively fixed

Material master data


Vendor master data
Purchasing information record
General Ledger master data

Before making the master data configurations, you


must have completely defined the organizational
structures

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

18

Overview

Material Group
Material Master
Material Types
Material Master Views
Purchasing Info Record
Source List

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

19

Material Group
The material group field allows similar materials to
be managed together
Material group is used in reporting
Executive Information Systems (EIS)
Logistics Information Systems (LIS)
Etc.

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

20

Material Master
Material master data can be related directly to all
organizational levels
General information of a material (description,
number, base unit of measure) however has to be
related to the highest level of organization - the
client
Further tailor the material master at the plant level or
lower

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

21

Material Type
Categorizes materials
Defines the material attributes

Valuation
Procurement
Price control
Etc.

Controls transaction involving the material


Controls screen sequence, number assignment,
field selection, account determination

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

22

Material Types
Standard material types are used in all industries
ROH: Raw Materials
Purchased externally only
No sales view

HAWA: Trading Goods


Always purchased externally
Sold without any change to the material
No manufacturing views exist

FERT: Finished Products


Are normally produced internally
No purchasing views exist

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

23

Additional Material Type

HIBE:
VERP:
LEER:
KMAT:
ERSA:
DIEN:

January 2008

Operating Supplies
Customer returnable packaging
Empty containers
Configurable material
Spare parts
Services

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

24

Material Master Views

Basic data
Classification
Sales: sales organization data
Sales: general/plant data
Sales text
Purchasing
Purchase order text
Forecasting

January 2008

sing
a
h
c
Pur iew
MR
V
P
Vie 1
w

Executive
Pen

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

25

Material Master Views (continued)

MRP 1, 2
Work scheduling
Storage
Warehouse management
Quality management
Accounting
Costing

January 2008

sing
a
h
c
Pur iew
MR
V
P
Vie 1
w

Executive
Pen

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

26

Material Master Forecasting


Number of Periods Required
Historical Periods
The number of historical values the system uses for the forecast

Forecast Periods
Number of period splits for which a forecast should be created

Forecast Values
The numeric quantity for future periods

Consumption Values
The sum of planned and unplanned consumption

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

27

Material Master MRP 1


General Data
Purchasing Group
The buyer(s) who are responsible for certain purchasing
activities

MRP Procedures
MRP Type
Determines whether and how the material is planned

Reorder Point
If stock falls below this point, the system is flagged to create a
planned order

MRP Controller
The person(s) responsible for the material planning

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

28

Material Master MRP 1 (cont.)


Lot Size Data
Lot Size
The lot sizing procedure to calculate the quantity to be produced
or procured

Minimum Lot Size


The smallest order quantity

Fixed Lot Size


The quantity to be ordered

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

29

Material Master MRP 2


Scheduling

Planned Delivery Time


Number of calendar days needed to obtain the material

Scheduling Margin Key


Used to determine the floats required for scheduling

Net Requirement Calculation


Safety Stock
Specifies the quantity whose purpose is to satisfy unexpectedly
high demand in the coverage period

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

30

Material Master MRP 3


Availability Check
Specifies whether and how the system checks
availability and generates requirements for materials
planning

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

31

Production oriented Master data

Bill of Material Master Data


Work Center Master Data
Work Center Control Key
Routing
Routing Use
Material Types and Production
Controlling Activities For Production
Activity Prices

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

32

Bill of Material Master Data


Bill of Materials (BOMs) are created as single-level
relationships between one parent material and the
sub-component material

EPEN

Barrel

January 2008

Cap

Crown

Cartridge

Band

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

Clip

33

Bill of Material Master Data


Variant Bill of Material (BOM)
Several products with a large proportion of identical
parts.

EPEN - Red

Red
Cartridge

January 2008

Band

EPEN - Black

Etc.

Black
Cartridge

Band

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

Etc.

34

Bill of Material Master Data


Multiple Bill Of Materials (BOM)
One product produced from alternative components
or processes, where the differences are small
(usually the quantity of a component).
BOM 1 = lot size 1 - 100
BOM 2 = lot size 101 999
EPEN - Black

Black
Cartridge
(Buy)
January 2008

Band

EPEN - Black

Etc.

Etc.

Band

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

Black
Cartridge
(Make)
35

Bill of Material Master Data


Where is the Bill Of Material (BOM) used?
MRP uses the BOM to determine dependent
requirements
Controlling uses the Bill Of Material (BOM) to calculate
product costs
Production uses the Bill Of Material (BOM) to issue the
proper quantities of components and raw materials to the
shop floor

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

36

Work Center Master Data


Unique production or assembly area
May include

Equipment
Groups of equipment
Production lines
Employees
Groups of employees

Operations carried out at work center

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

37

Work Center Master Data


Work center used to define capacities

Labor
Machine
Output
Emissions

Capacities used in
Capacity requirements planning (CRP)

Detailed scheduling
Costing
January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

38

Work Center Master Data


Assigned
Cost center
Work Center only assigned to one cost center

Human Resources (HR)


Qualifications
Positions
People

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

39

Work Center
Work Centers have multiple views

Basic data
Default values
Capacity overview
Scheduling
Cost center assignment
Technical data

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

40

Work Center Control Key

Scheduling
Determine capacity requirements
Inspection characteristics required
Automatic goods receipt by operation
Print time tickets & confirmations
Rework
Cost
Schedule external operations std values
Confirmations

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

41

Routing
Routings enable you to plan the production of
materials
Routings are used as a template for production
orders and run schedules as well as a basis for
product costing.
Routing is a sequence of operations which detail
the manufacture of a product

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

42

Routing
Routing are used to determine:

Operations
Work centers
Material components
Production resources and tools
Quality Checks

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

43

Routing Use
Routings will be used in

Scheduling (dates, times)


Costing
Capacity planning
Production orders

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

44

Routing
Standard
Sequence

Alternate
Sequence

Operation 10

Operation 10

Operation 20

Operation 20

Parallel
Sequence
Operation 10

Operation 20

Operation 25

Operation 25
Operation 30

Operation 30
Operation 30

Operation 40

January 2008

Operation 40

Operation 40

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

45

Material Types Allowed In Production


Multiple material types may be used in a
routing/BOM

Raw materials
Semi-finished product
Trading goods are allowed but not standard
Text or Reference materials common

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

46

Display Routing List


A collective report displaying the available routings
and the material allocations to operations
Four General Types

Operations Related
Component Related
PRT Related
General List (Operation Control Ticket)

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

47

Controlling Activities for Production


Used to perform internal cost allocation, where
activities by a cost center are measured
Labor time
Machine hours

Output activities are valued


Allocation of an activity type is always made with
the allocation cost element created in activity type
planning

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

48

Activity Prices
Prices (costs) for planned activities
Fixed or Variable
Labor = $$/hour
Machine = $/hour
Overhead = %

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

49

Transaction Data
Includes transactions that describe business
activities
Unlike master data, aggregate transactional data is
dynamic - it constantly changes, usually many
times per day
Transactions use organizational structure, master
data, and rules

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

50

Production Process
(Make-to-Stock)

Production
Proposal
(Planning/Other)

Capacity
Planning

Schedule
and Release
Shop Floor
Documents

Order
Settlement
Goods
Issue
Goods
Receipt

January 2008

Completion
Confirmation

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

51

Production Order
Production Order Defines

Material is to be processed
At what location (work center)
At what time
How much work is required
Resources to be used
Order costs settlement

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

52

Production Order Standard Process


Documents/Procedures used in the manufacture of
material

Order creation/Order Conversion


Capacity planning
Order scheduling
Order release/processing
Shop floor documents
Completion confirmation
Goods receipts
Order settlement

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

53

Production Order Release


When a production order is created the following
actions are carried out:
A routing selected: operations and sequences
The bill of materials transferred
Reservations generated for bill of material items in stock

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

54

Production Order Release (cont.)


When a production order is created the following
actions are carried out:
The planned costs are generated
The capacity requirements generated for the work centers
Purchase requisitions generated for non-stock items and externallyprocessed operations

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

55

Production Order Elements


Order header

Order number
Material produced
Plant
Quantity
Dates

PRT
Tooling
Equipment

January 2008

Operations

Tasks
Work centers
Times
Dates
Control keys

Components
Material components
Quantity

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

56

Production Order Completion and


Settlement
Completion
confirmation
Quantities of material
used
Operations completed
Time
Personnel

Settlement rule for the


order for accounts/cost
centers
Settlement profile
Settlement receiver

Costs
Planned costs and
actual costs

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

57

Production Order Completions


Completion confirmation:
Confirms both the yield and scrap quantities
Backflushing
Can create goods movements
Reduction of component reservations

Receipt of product if automatic Goods Receipt (G/R) set


Activity costs

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

58

Production Order Costs


Planned costs
Primary Costs
Material Costs (BOM)
Based on material master price for each component

Cost for External Processing

Secondary Cost
Production Costs (Routing)
Material Overhead Costs
Production Overhead Costs

January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

59

Production Order Costs


Actual costs
Primary Costs
BOM components
Updated when goods are issued to order, or when purchased
materials are received

Secondary Costs
Uses routing
Time Cards from Operations

May include activity costs


Material Overhead Costs
Production Overhead Costs

Gets updated at completion confirmation


January 2008

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

60

Production Order Status

REL:
CRTD:
PRT:
CNF:
DLV:
PRC:

January 2008

Released
Created
Printed
Confirmed
Delivered
Pre-costed

GMPS:
Goods
movement posted
MACM:
Material
Committed
MANC:
Mat. Availability
not checked
NTUP:
Dates are not
updated
SETC:
Settlement rule
created

SAP AG - University Alliances and The Rushmore


Group, LLC 2007. All rights reserved.

61

Overall Process

Purchase
Order

Purchase
Requisition

Schedule
and Release
Convert Production
Proposal
Goods
Issue

Run MPS w/MRP


Check
Availability
Sales Order
Entry

Sales Order
Process
Receipt of
Payment
Invoice
January 2008 Customer

Pick
Materials

Procurement
Process

Invoice
Receipt

Production
Process Completion
Confirmation
Quality
Inspection

Goods
Receipt

Payment
to Vendor

Goods
Receipt

Order
Settlement
Post Goods
Issue
SAP AG - University Alliances and The Rushmore
Group, LLC 2007. All rights reserved.

62