Sie sind auf Seite 1von 99

STUDENTS:

BAYAG-O, ISRAEL T.
GASPAR, PAUL M.
PION, REDEN S.
INSTRUCTOR:

ARCH. ROBERT V. ROMERO,


MAEHP, UAP

experiential
learning

AR 313 BUILDING TECHNOLOGY 3


CONSTRUCTION DRAWING IN CONCRETE
& STEEL

PROJECT SITES:
FOUR (4) STORY WITH
BASEMENT AND ROOF DECK
COMMERCIAL AND HOTEL
BUILDING (SHUNTUG COR., F.
BAUTISTA STS, BAGUIO CITY)
THREE (3) STORY WITH ROOF
DECK COMMERCIAL BUILDING
(LAKANDULA, GEN. LUNA
ROAD, BAGUIO CITY)
RENOVATION WORKS: DIOCESE
PASTORAL CENTER FAADE
(DPC, QUIRINO HIGHWAY,
BAGUIO CITY)

experiential
learning

AR 313 BUILDING TECHNOLOGY 3


CONSTRUCTION DRAWING IN CONCRETE
& STEEL

Location: Shuntug Cor., F. Bautista Sts, Baguio City


Owner: Golden Crown Group Realty, INC.
Architect: Ma. Mylen Victoria Yaranon-Pangan

experiential
learning

Four (4) Story with Basement and Roof Deck


Commercial and Hotel Building

ate of Site Visit: June27, 2015


Status Quo:
Partial mat foundation and diaphragm walls had already
been constructed.

ass purchase of steel materials was done.

Site activities:
Excavation for partial mat foundation

Backhoe

Jack hammer

onstruction of diaphragm walls

abrication of steel reinforcements

Rebar bending stand

25 mm D rebar bender

Column with reinforcement

ls and equipments and other observations

Concrete mixer and truck


used for delivery and

dangerous site with poor risk


management

Concrete cover blocks

VIDEO

experiential
learning

Four (4) Story with Basement and Roof Deck


Commercial and Hotel Building

Location: Lakandula, Gen. Luna Road, Baguio City


Owner: VGF Realty and Development Corporation
Architect: Melchor H. Faelangco
Professional in charge of full time inspection and supervision
works: Engr. Jason Doctolero

experiential
learning

Three (3) Story with Roof Deck Commercial


Building

ate of Site Visit: June 9, 2015


Status Quo:
Wide flange beams and columns up to the roof deck had
almost been installed
Finishing works for the ground floor is undergoing including
the stairs going to second floor
Second floor slab is already done and wall construction is
undergoing
Partial third floor slab had already been constructed

Site Activities:
Finishing works for ground floor (tile works and wall
waterproofing and painting)

Construction of stairs going up to third floor and wall


construction for second floor(CHB for exterior walls and
installation of aluminum furring for interior drywalls)
Smooth surface concrete
ceiling

Metal studs

Stairs framing

Installation of steel reinforcement and concrete forms for


remaining third floor slab

Shoring jack and phenolic concrete forms with


G.I. pipe and wood support

Tools and equipments and other observations


with remarks:

Generator welding machine

Electric drill press


Fire
extinguisher

grinder
Cut-off
machine
Tie cutter

Pliers

Oxy-LPG
cutting outfit

H frames

Stainless grease trap

Water closet and other plumbing


fixtures
Panel box

DTR (Daily Time Record)

Date of Site Visit: June 16, 2015


Status Quo:
The remaining half of third floor slab had
already been constructed
Stairs are almost done

Site Activities:
Installation of stalls roll-up doors for ground floor including
aluminum framed glass doors and windows for offices

Roll-up door
parts and
accessories

Cleaning of floor tiles and painted walls for ground


floor

Installation of interior second floor drywalls and CHB


walls

Metal studs/ frames


Hardie plex board for

CHB firewall

Application of putty to plastered second floor


walls

Fabrication and installation of steel reinforcement for


stairs and roof deck slab including concrete forms

Electrical
rough-in

Electrical
rough-in
I Beam
Phenolic
board
G.I Pipe and
wood joists
combination
stringer
Head/ U
jack
shoring

adjusment

Tools and equipments and other observations


with
remarks:

Chain block

Pod eye

splice

Canteen/
store

Temporary
settlement

ite Visit: June 24, 2015

vities:
on (lifting & welding) of the remaining I beam for the roof deck and t
s steels and other corrections/adjustments

Plastering of second floor CHB walls and installation


of drywalls

Tools and equipments and other observations


with remarks:

New exit

Pod eye
Welded connection

Angle bar
support

Base plate

Date of Site Visit: July 3, 2015


Site Activities:
Construction of exterior stalls
Final cleaning of ground floor

tallation of second floor interior drywalls

Steel mesh stall partition

Window frames

Glass facade

Installation and fabrication of roof deck reinforcing


bars and concrete forms

Pod eye removal

Junction box

Utility box with 25mm D PVC


conduit pipe

Date of Site Visit: July 10, 2015


Site Activities:
Customization of stalls by different owners with different
businesses
Final cleaning of ground floor
Continuation of interior works

experiential
learning

VIDEO

Location: DPC, Quirino Highway, Baguio City


Owner: Diocese of Baguio C/O Rev. Fr. Lorenzo Abela Jr.
Architect: Arch. Elvis C. Palicdon
Professional in charge of full time inspection and supervision
works: B.C. PARAN BUILDERS

experiential
learning

Renovation Works: Diocese Pastoral Center


Facade

Date of Site Visit: June 4, 2015


Status quo:

arricades were already installed

Footings and partial columns were already


constructed
ply wood form
2x3 wood joists
2x3 wood shoring

Wall
footing

Ongoing demolition of the old existing concrete walls, old


cladding and other old structures

Old
cladding

Old wall

Site Activities:
Excavation works for the remaining reinforced concrete
columns
Hauling of earth from excavation and delivery of materials
Fabrication and installation of reinforcing bars for columns and
beams including
Ongoing demolition of old existing concrete walls, old cladding
and other old structures
Installation of steel roof and cladding frames by another
contractor (supplier of roofing sheets and aluminum cladding)

Jack
hammer

Site Visit: June 5, 2015


tivities:
tion works for the remaining reinforced concrete columns

Hauling of earth from excavation


and delivery of materials

Fabrication and installation of reinforcing bars for columns,


beams and slabs including formworks and shoring

Rebar bending stand

Speed
cutter

Beam
reinforcement

Slab reinforcement

Beam intersection

clamps

Jack heads/ U
jack

Shoring jack

G.I. Pipe
temporary roof
framing

Ongoing demolition of old existing concrete walls, old cladding


and other old structures
Installation of steel roof and cladding frames by another
contractor (supplier of roofing sheets and aluminum cladding)
Aluminum furring
Angle cleat

C Rafter
C Purlins
Sag rod

Aluminum furring

tekscrews

miscuts

Aluminum
studdings

Roofing sheet

Site Visit: June 16, 2015


ivities:
maining reinforced concrete columns were already constructed

Fabrication and installation of reinforcing bars for beams and


slabs including electrical and plumbing rough-ins

Electrical roughins

Awaiting for aluminum cladding and roofing sheets

Site Visit: July 2, 2015


vities:
of concrete for the entire floor system and beams was delayed due to
munication and other unforeseen events, so site clearing and other repa
ne instead

Splice zones

Concrete vibrator

embedment

f Site Visit: July 3, 2015


ctivities:
ete pouring for the entire floor system and beams

Pouring cut-off

experiential
learning

VIDEO

Conclusion:
Unforeseen events
Quick and reasonable decision making
Flexible workforce
the reality of construction

experiential
learning

omparative analysis:
Indoor (covered) and outdoor (exposed) construction
Function of the building
Type of construction
Project supervisor
Workforce/ manpower
Risk management
Delays