Beruflich Dokumente
Kultur Dokumente
No
Yes
Yes
NA
Yes
No
Yes
Yes
Yes
Customer
Comments
(VOC)
ToSample
test online
modules
for
LBG (Lloyds Banking
Group) during unit testing
requires reduction of
manual efforts, manual
errors and time taken.
How can we reduce manual
efforts, errors and time
taken ?
(CTQs) Parameter
Critical
Manual
Efforts To Quality
Manual errors
Time taken
Charter
Business Case (Including High Level Benefit Analysis)
In Scope
On-line modules
account creation module(NEW01)
Closure modules(CLO01, CLO04)
etc
Out of Scope
Batch Modules
Sequential pass
Drip feed Module
Reduce testing effort for Online modules, which are on an average tested 90-110 times a year, from
80 hours to 76.5 hours per module.
Macro Map
Transaction Reporting Process is driven by the BRD issued by XYZ Group
Online module
testing
Compile link
Supur stream
creation
Start Online
stream
In Scope
Out of Scope
O
Output
API testing
complete in less
time and less
effort
TCS
P
Process
Start
I
Input
S
Supplier
Online stream
generator tool
TCS
Stop
In Scope
Out of Scope
Method
Measurement
Manual
Effort,errors
and time
involved in
testing of API
modules.
Manually create
streams
Large number of
associates test online
modules
Environment
Issues
Manual
efforts,errors
and time
involved in API
testing is
HIGH ?
Virtual machine
Connectivity Issues
Mother Nature
People
-7-
TCS INTERNAL
0
0
0
0
0
1800
420
0
420
0
900
3
300
2
302
5
27
525
5
120
0
120
0
0
600
6
420
0
420
Total Time
2
3300
0
600
2
3900
5
27
3868
VE & NVA
0
0
0
5
0
0
0
AS IS Process
Detailed Processes
Select the module want to test
Manually create the compile
Manually generate the Supur stream
Manually create or run the Start online
Hit the API
-8-
TCS INTERNAL
C
O
N
T
R
O
L
INCONTROL
OUT OF
CONTROL
HIGH
MEDIUM
LOW
Cross checking i
Manual effort and
time involved in
iterating through the
DI History section.
Status reporting
method.
Large size of
table used to
retrieve data.
Local Storage
Space availability
issues.
Network speed
Large number of
users logged in DI
System.
DI System
Connectivity Issue.
DI Application fault.
Server and
environment
constraints.
Large Number work
flow steps involved
in DI cycle.
Causes encircled were taken up for solution in each of 4 process steps (VSM
-9-
TCS INTERNAL
-10-
TCS INTERNAL
1 Automation of streams
2 System up-gradation
Processing
time
Effectiveness
116
52
-11-
TCS INTERNAL
To Be Process Map
Start
Perform Testing
Stop
-12-
TCS INTERNAL
Step
Step11
Primary Savings
2.
3.
4.
5.
6.
Key Assumptions
Utilised
1.
Billing rate is
$21.58/hour
2. Number of Online
modules and New
APIs.
Primary Savings
2.
3.
4.
-13-
1.
Total Savings in
Dollars = 7933.40
TCS INTERNAL
Step
Step44
Cost Incurred
1.
2.
3.
Step
Step55
= $7243.4
Time Period 12
months
Annual
AnnualGross
Gross Benefits
Benefits:: 7933.40
7933.40USD
USD
Cost
Cost Incurred
Incurred:: 690
690 USD
USD
Annual
AnnualNet
Net Benefits
Benefits:: 7243.4
7243.4USD
USD
-14-
TCS INTERNAL
5
0
5
0
0
0
60
0
60
0
5
5
3
0
3
3
0
0
Total Time
73
0
73
3
5
5
VE & NVA
0
0
0
1
3
0
0
0
5
0
5
0
0
0
Total%
100.00%
0.00%
100.00%
0.05%
0.07%
0.07%
0.14%
AS IS Process
Detailed Processes
Copy DI Comments From DI System for each Module by Query
Making List of selected DI's
Copying Comments for Selected DIs
Copy sheet to EOBR
-15-
TCS INTERNAL
Before Vs After
Before
After
Sr
No
Proposal
4000
After using this tool, manual effort and errors are reduced.
Testing takes less time.
Results
98% improvement
3500
3000
2500
2000
1500
1000
500
0
Before
After
There
Thereisistotal
totalsavings
savingsof
of hours
hoursper
perannum
annumby
byimplementing
implementingthis
this
improvement
improvement
-16-
TCS INTERNAL
Technique Used :
Techniques Used
-17-
TCS INTERNAL