( AUTOMATIC PROCEDURE )
NORMAL OPERATION
1. ATS are in normal
position connected to
utility source
2. All generator set
paralleling circuit
breaker open
BUILDING LOAD
LOSS OF NORMAL
POWER
ATS
BUILDING LOAD
ATS TRANSFER TO
EMERGENCY POWER
ATS
BUILDING LOAD
LOAD MANAGEMENT
( LOAD DEMAND CONTROL )
BUILDING LOAD
ATS
BUILDING LOAD
ATS
BUILDING LOAD
www.intellisyspower.com
NORMAL POWER
RETURNS
START
SIGNA
L
ATS
BUILDING LOAD
www.intellisyspower.com
www.intellisyspower.com
1.
Before any attempt to start and parallel the
generators, check that all generator paralleling circuit
breaker are all in OFF position. Generator controller auto
mode must be switch on.
2.
Press MODE push button (SELECT SEMI-AUTO MODE)
located on the front face of DEIF controller (G1 and G2)
and then press START button the generator will start and
ramp to rated voltage and frequency.
Start Button
Mode Button
www.intellisyspower.com
3.
Check if run and generator voltage LED illuminates , it
means the generator is protected and ready.
4.
Select the generator (G1 and G2) to be online first,
then press CB CLOSE/OPEN button on the DEIF controller.
The controller will automatically detects if it is a paralleling
mode or a single mode
CB Close/Open
Button
Run LED
www.intellisyspower.com
5.
To synchronize the second generator, press CB
CLOSE/OPEN button on DEIF controller , the digital
synchroscope will automatically display during
synchronization time and then it will disappear after
generator breaker closed. Available loads on the bus will
automatically load share to the units online. Typically the
load share percentage factor is 50 %.
CB Close/Open
Button
www.intellisyspower.com
6.
To stop the G1 and G2 press STOP button on DEIF
controller to perform engine cooling down. When the
preset cool down timer elapse the engine will
automatically shutdown.
Stop Button
www.intellisyspower.com
BASIC TROUBLESHOOTING
GUIDE
www.intellisyspower.com
Corrective Action
www.intellisyspower.com
Corrective Action
www.intellisyspower.com
Fail to Synchroni
Probable Cause
Corrective Action
www.intellisyspower.com
Corrective Action
www.intellisyspower.com
Corrective Action
www.intellisyspower.com
Corrective Action
www.intellisyspower.com
LED FUNCTIONS
www.intellisyspower.com
Alarm
lashing: Unacknowledged alarms present,
Power: indicates auxiliary supply ON
ixed: Acknowledged alarms present,
Self check OK: Indicates self check O
No alarm: no LED light up
AGC
(DG)
RUN: LED ON at
Generator running.
PUSHBUTTON GUIDE
AGC
(DG)
AGC
(DG)
www.intellisyspower.com
ON AND OFF
BUTTON
CHARGING
SPRING
STATUS
LEVER
TRIP UNIT
CRADLE
LOCK
BUTTON
BREAKER
POSITIONING
STATUS
INDICATOR
RACKING
HANDLE
www.intellisyspower.com
OFF
DISCHARGE
Step : 1
Manual charging of ACB
by cranking the lever at
least 6 times.
www.intellisyspower.com
Step : 2
After cranking the charger
Lever, The charging spring
Mechanism is in charge
position state.
OFF
CHARGE OK
CLICK
www.intellisyspower.com
Step : 3
OFF
CHARGE OK
www.intellisyspower.com
ON
DISCHARGE
www.intellisyspower.com
Step : 4
ON
DISCHARGE
www.intellisyspower.com
OFF
DISCHARGE
www.intellisyspower.com
www.intellisyspower.com
RACKING
HANDLE
BREAKER POSITION
INDICATOR
www.intellisyspower.com
LOCK BUTTON
Note:
PUSH THE LOCK BUTTON
OF THE ACB BEFORE DRAW-IN/
DRAW-OUT.
www.intellisyspower.com
Pull-out the
racking handle
DRAW-IN/DRAWOUT CYCLE OF
ACB
GREEN ARROW
RACKING-IN THE
ACB
RED ARROW
RACKING-OUT THE
www.intellisyspower.com
ACB
CONNECTED
POSITION
TEST
POSITION
WITHDRAWN
POSITION
www.intellisyspower.com
Note:
Push the Draw-in/out lock
mechanism before drawing
in and out the breaker.
www.intellisyspower.com
Pull-out the
ACB
PULLING
IN AND
OUT OF
ACB
GREEN
ARROW
DRAW-OUT
THE ACB
RED ARROW
DRAW-IN
THE ACB
www.intellisyspower.com
RESET
BUTTON
LCD
SCREEN
KEYS
LONG TIME
DELAY
LONG
TIME
SHORT
TIME
www.intellisyspower.com