Sie sind auf Seite 1von 37

Define Phase

Six Sigma Fundamentals

Six Sigma Fundamentals

Understanding Six Sigma


Six Sigma Fundamentals
Process
Process Maps
Maps
Voice
Voice of
of the
the Customer
Customer
Cost
Cost of
of Poor
Poor Quality
Quality
Process
Process Metrics
Metrics
Selecting Projects
Elements of Waste
Wrap Up & Action Items

LSS Black Belt v11.1 MT - Define Phase

Open Source Six Sigma, LLC

What is a Process?

Why have a process focus?


So we can understand how and why work gets done
To characterize customer & supplier relationships
To manage for maximum customer satisfaction while
utilizing minimum resources
To see the process from start to finish as it is
currently being performed
Defects: Blame the process, not the people

process (proses) n. A repetitive and


systematic series of steps or activities
where inputs are modified to achieve a
value-added output
LSS Black Belt v11.1 MT - Define Phase

Open Source Six Sigma, LLC

Examples of Processes

We go through processes every day. Below are some


examples of those processes. Can you think of other
processes within your daily environment?

Injection molding
Decanting solutions
Filling vial/bottles
Crushing ore
Refining oil
Turning screws
Building custom homes
Paving roads
Changing a tire

LSS Black Belt v11.1 MT - Define Phase

Recruiting staf
Processing invoices
Conducting research
Opening accounts
Reconciling accounts
Filling out a timesheet
Distributing mail
Backing up files
Issuing purchase orders

Open Source Six Sigma, LLC

Process Maps

The purpose of a Process Map is to:


Identify the complexity of the process
Communicate the focus of problem solving

Process Maps are living documents and must be


changed as the process is changed:
They represent what is currently happening not what you
think is happening
They should be created by the people who are closest to the
process

Start

Step A

Step B

LSS Black Belt v11.1 MT - Define Phase

Step C

In
sp
ec
t

Process Map

Step D

Finish

Open Source Six Sigma, LLC

Process Map Symbols

Standard symbols for Process Mapping:


(available in Microsoft Office, Visio, iGrafx , SigmaFlow and other
products)
A RECTANGLE indicates
an activity. Statements
within the rectangle
should begin with a verb

A PARALLELAGRAM
shows that there are
data

A DIAMOND signifies a decision


point. Only two paths emerge
from a decision point: No and
Yes
An ARROW shows the
connection and
direction of flow

LSS Black Belt v11.1 MT - Define Phase

An ELLIPSE shows the


start and end of the
process

A CIRCLE WITH A LETTER


OR NUMBER INSIDE

symbolizes the
continuation of a
flowchart to another
page
6

Open Source Six Sigma, LLC

High Level Process Map

One of the deliverables from the Define Phase is a high


level Process Map which at a minimum must include:

Start and stop points


All process steps
All decision points
Directional flow
Value categories as defined here:
Value Added:
Physically transforms the thing going through the process
Must be done right the first time
Meaningful from the customers perspective (is the customer
willing to pay for it?)
Value Enabling:
Satisfies requirements of non-paying external stakeholders
(government regulations)
Non-Value Added:
Everything else

LSS Black Belt v11.1 MT - Define Phase

Open Source Six Sigma, LLC

Process Map Example

Process Map for a Call Center B

START

REVIEW CASE
TOOL HISTORY &
TAKE NOTES

LOGON TO PC &
APPLICATIONS

SCHEDULED
PHONE TIME?

N
Z

TRANSFER
APPROPRIATE?

TRANSFER
CALL

PROVIDE
RESPONSE
PHONE&
NOTE
DATA ENDS

WALK-IN
N

CALL

PUT ON HOLD,
REFER TO
REFERENCES

PHONE DATA
CAPTURE BEGINS

ANSWER?

DETERMINE WHO
IS INQUIRING

ANSWER?

ENTER APPROPRIATE
SSAN (#,9s,0s)

CREATE A CASE
INCL CASE TYPE
DATE/TIME, &
NEEDED BY

AUTO
ROUTE

ROUTE

Y
CASE
CLOSED

OFF HOLD AND


ARRANGE CALL
BACK PHONE DATA
ENDS

ADD TO
RESEARCH
LIST

LSS Black Belt v11.1 MT - Define Phase

UPDATE ENTRIES
INCL OPEN DATE/TIME

N
CASE TOOL
RECORD?

ACCESS CASE TOOL

OLD
CASE

QUERY INTERNAL
HRSC SME(S)

DETERMINE NATURE
OF CALL & CONFIRM
UNDERSTANDING

IF EMP DATA NOT


POPULATED, ENTER

ACCESS CASE TOOL

EXAMINE NEXT NOTE


OR RESEARCH ITEM

IMMEDIATE
RESPONSE
AVAILABLE?

SCHEDULED
PHONE TIME?

CALL or
WALK-IN?

LOGON
TO PHONE
PHONE
TIME

LOGOFF PHONE, CHECK


MAIL,E-MAIL,VOICE MAIL

N
TAKE ACTION
or
DO RESEARCH

CLOSE CASE
W/
DATE/TIME

GO TO
F or E
DEPENDING ON
CASE

E
NEXT

Open Source Six Sigma, LLC

Cross Functional Process Map


When multiple departments or functional groups are involved in a
complex process it is often useful to use Cross Functional Process
Maps.

Start

Request
transfer

Attach ACH
form to
Invoice

Produce an
Invoice

ACH Automated
Clearing House.

No

Vendor
info in
FRS?

Receive
payment

End

Match against
bank batch
and daily cash
batch

Maintain database
to balance ACH
transfers

Accepts transactions,
transfer money and
provide batch total

General
Accounting
LSS Black Belt v11.1 MT - Define Phase

Fill out ACH


enrollment
form

Yes Input info into


web interface

Bank

Financial
Accounting

Vendor

Department

Draw in either vertical or horizontal Swim Lanes and label the


functional groups then draw the Process Map
Sending Wire Transfers

Review and
Process
transfer in
FRS

3.0
Journey Entry

21.0
Bank
Reconciliation

Open Source Six Sigma, LLC

Process Map Exercise

Exercise objective: Using your favorite


Process Mapping tool create a Process Map
of your project or functional area.
1. Create a high level Process Map, use
enough detail to make it useful.
It is helpful to use rectangular post-its for
process steps and square ones turned to a
diamond for decision points.

2. Color code the value added (green) and


non-value added (red) steps.
3. Be prepared to discuss this with your
mentor.

LSS Black Belt v11.1 MT - Define Phase

10

Open Source Six Sigma, LLC

Do you know your Customer?

Knowing your customer is more than just a


handshake. It is necessary to clearly understand
their needs. In Six Sigma we call this understanding
the CTQs or Critical to Customer Characteristics.

Critical to Customer
Characteristics

Voice Of the Customer

LSS Black Belt v11.1 MT - Define Phase

11

Open Source Six Sigma, LLC

Voice of the Customer

Voice of the Customer or VOC seems obvious;


after all, we all know what the customer wants. Or
do we??
The customers perspective has to be foremost in the mind of
the Six Sigma Belt throughout the project cycle.
1. Features

2.

3.

4.

Does the process provide what the customers expect and need?
How do you know?

Integrity

Is the relationship with the customer centered on trust?


How do you know?

Delivery

Does the process meet the customers time frame?


How do you know?

Expense

Does the customer perceive value for cost?


How do you know?

LSS Black Belt v11.1 MT - Define Phase

12

Open Source Six Sigma, LLC

What is a Customer?

Different types of customers dictate how we interact


with them in the process. In order to identify customer
and supplier requirements we must first define who the
customers are:
External
Direct: those who receive the output of your services, they
generally are the source of your revenue
Indirect: those who do not receive or pay for the output of
your services but have a vested interest in what you do
(government agencies)
Internal
- those within your organization
who receive the output of your
work
LSS Black Belt v11.1 MT - Define Phase

13

Open Source Six Sigma, LLC

Value Chain
The relationship from one process to the next in an organization
creates a Value Chain of suppliers and receivers of process outputs.
Each process has a contribution and accountability to the next to
satisfy the external customer.
External customers needs and requirements are best met when all
process owners work cooperatively in the Value Chain.

Careful
each move
has many
impacts!

LSS Black Belt v11.1 MT - Define Phase

14

Open Source Six Sigma, LLC

What is a CTQ?

Critical to Quality (CTQs) are measures we use to capture


VOC properly. (also referred to in some literature as CTCs
Critical to Customer)
CTQs can be vague and difficult to define.
The customer may identify a requirement that is difficult to
measure directly so it will be necessary to break down what is
meant by the customer into identifiable and measurable
terms
Service:
Product:

Performance
Features
Conformance
Timeliness
Reliability
Serviceability
Durability
Aesthetics
Reputation
Completeness

LSS Black Belt v11.1 MT - Define Phase

15

Competence
Reliability
Accuracy
Timeliness
Responsiveness
Access
Courtesy
Communication
Credibility
Security
Understanding
Open Source Six Sigma, LLC

Developing CTQs

Step
1

Identify Customers
Listing
Segmentation
Prioritization

Step
2

Capture VOC
Review existing performance
Determine gaps in what you need to
know
Select tools that provide data on gaps
Collect data on the gaps

Step
3

Validate CTQs
Translate VOC to CTQs
Prioritize the CTQs
Set Specified Requirements
Confirm CTQs with customer

LSS Black Belt v11.1 MT - Define Phase

16

Open Source Six Sigma, LLC

Cost of Poor Quality (COPQ)

COPQ stands for Cost of Poor Quality


As a Six Sigma Belt one of your tasks will be to estimate
COPQ for your process
Through your process exploration and project definition
work you will develop a refined estimate of the COPQ in
your project
This project COPQ represents the financial opportunity of
your teams improvement efort (VOB)
Calculating COPQ is iterative and will change as you learn
more about the process
No, not that kind

of cop queue!
LSS Black Belt v11.1 MT - Define Phase

17

Open Source Six Sigma, LLC

The Essence of COPQ

The concepts of traditional Quality Cost are the foundation


for COPQ.
External, Internal, Prevention, Appraisal

A significant portion of COPQ from any defect comes from


efects that are difficult to quantify and must be estimated.
COPQ helps us understand the financial impact of problems
created by defects.
COPQ is a symptom, not a defect
Projects fix defects with the intent of improving symptoms.

LSS Black Belt v11.1 MT - Define Phase

18

Open Source Six Sigma, LLC

COPQ - Categories

Internal COPQ
Quality Control Department
Inspection
Quarantined Inventory
Etc

Detection
Supplier Audits
Sorting Incoming
Parts
Repaired Material
Etc

External COPQ
Warranty
Customer Complaint
Related Travel
Customer Charge Back
Costs
Etc

LSS Black Belt v11.1 MT - Define Phase

Prevention
Error Proofing
Devices
Supplier
Certification
Design for Six Sigma
Etc

19

Open Source Six Sigma, LLC

COPQ - Iceberg
Warranty

Inspection

Recode

Rejects

Rework

Visible Costs
(Hard Costs)

Lost sales

Engineering change orders


Time value of money

(less obvious)

More set-ups

(Soft Costs)
LSS Black Belt v11.1 MT - Define Phase

Expediting costs

Excess inventory

Working Capital
allocations

Hidden Costs

Late delivery

Long cycle times


Excessive Material
Orders/Planning
Lost Customer Loyalty

20

Open Source Six Sigma, LLC

COPQ and Lean

Waste does not add, subtract or otherwise modify the


throughput in a way that is perceived by the customer
to add value.

In some cases, waste may be


necessary but should be
recognized and explored:

Inspection, Correction,
Waiting in suspense
Decision diamonds, by
definition, are non-value
added

Often waste can provide


opportunities for additional
defects to occur.
We will discuss Lean in more
detail later in the course.
LSS Black Belt v11.1 MT - Define Phase

21

Lean Enterprise
Seven Elements of Waste *
u
Correction
u
Processing
u
Conveyance
u
Motion
u
Waiting
u
Overproduction
u
Inventory
*Womack, J. P., & Jones, D. T. (1996). Lean
Thinking. New York, NY: Simon & Schuster

Open Source Six Sigma, LLC

COPQ Hard and Soft Savings

While Hard Savings are always more


desirable because they are easier to
quantify it is also necessary to think about
Soft Savings.
COPQ Hard Savings

COPQ Soft Savings

Labor Savings
Cycle Time Improvements
Scrap Reductions
Hidden Factory Costs
Inventory Carrying Cost

LSS Black Belt v11.1 MT - Define Phase

22

Gaining Lost Sales


Missed Opportunities
Customer Loyalty
Strategic Savings
Preventing Regulatory
Fines

Open Source Six Sigma, LLC

COPQ Exercise

Exercise objective: Identify current


COPQ opportunities in your direct area.
1. Brainstorm a list of COPQ opportunities.
2. Categorize the top 3 sources of COPQ
for the four classifications:

LSS Black Belt v11.1 MT - Define Phase

Internal
External
Prevention
Detection

23

Open Source Six Sigma, LLC

The Basic Six Sigma Metrics

In any process improvement endeavor the


ultimate objective is to make the process:
Better: DPU, DPMO, RTY (there are others, but they derive
from these basic three)
Faster: Cycle Time
Cheaper: COPQ

IfIfyou
youmake
makethe
theprocess
processbetter
betterby
byeliminating
eliminatingdefects
defectsyou
youwill
willmake
make
ititfaster.
faster.
IfIfyou
youchoose
chooseto
tomake
makethe
theprocess
processfaster
fasteryou
youwill
willhave
haveto
toeliminate
eliminate
defects
defectsto
tobe
beas
asfast
fastas
asyou
youcan
canbe.
be.
IfIfyou
youmake
makethe
theprocess
processbetter
betteror
orfaster
fasteryou
youwill
willnecessarily
necessarilymake
makeitit
cheaper.
cheaper.

The
The metrics
metrics for
for all
all Six
Six Sigma
Sigma projects
projects fall
fall into
into
one
one of
of these
these three
three categories.
categories.
LSS Black Belt v11.1 MT - Define Phase

24

Open Source Six Sigma, LLC

Cycle Time Defined

Think of Cycle Time in terms of your product or


transaction in the eyes of the customer of the
process:
It is the time required for the product or transaction to go through the entire
process from beginning to end
It is not simply the touch time of the value-added portion of the process

What is the cycle time of the process you mapped?


Is there any variation in the cycle time?
Why?

LSS Black Belt v11.1 MT - Define Phase

25

Open Source Six Sigma, LLC

Defects Per Unit (DPU)


Six Sigma methods quantify individual defects and not just
defectives ~
Defects account for all errors on a unit
A unit may have multiple defects
An incorrect invoice may have the wrong amount due and the
wrong due date
Defectives simply classifies the unit bad
Does not matter how many defects there are
The invoice is wrong, causes are unknown
A unit:
Is the measure of volume of output from your area.
Is observable and countable. It has a discrete start and stop
point.
It is an individual measurement and not an average of
measurements.
Two Defects
One Defective

LSS Black Belt v11.1 MT - Define Phase

26

Open Source Six Sigma, LLC

First Time Yield

FTY is the traditional quality metric for yield


Unfortunately it does not account for any necessary rework

FTY =
Units in = 100
Units Out = 100
Process A (Grips)

Defects Repaired
40

Total Units Passed


Total Units Tested

Units in = 100
Units Out = 100
Process B (Shafts)

Defects Repaired
30

Units in = 100
Units Out = 100
Process C (Club Heads)

Defects Repaired
20

Units Tested = 100


Units Passed = 100
Final Product (Set of Irons)

FTY = 100 %

*None of the data used herein is associated with the products shown herein. Pictures are no more than illustration to make a point to teach the
concept.

LSS Black Belt v11.1 MT - Define Phase

27

Open Source Six Sigma, LLC

Rolled Throughput Yield

RTY is a more appropriate metric for problem solving


It accounts for losses due to rework steps

RTY = X1 * X2 * X3
Units in = 100
Units in = 100
Units in = 100
Units W/O Rework = 60 Units W/O Rework = 70Units W/O Rework = 80
RTY = 0.7
RTY = 0.8
RTY = 0.6
Process A (Grips)

Defects Repaired
40

Process B (Shafts)

Defects Repaired
30

Process C (Club Heads)

Defects Repaired
20

Units Passed = 34
Units Tested = 100

Final Product (Set of Irons

RTY = 33.6 %

*None of the data used herein is associated with the products shown herein. Pictures are no more than illustration to make a point to teach the concept.

LSS Black Belt v11.1 MT - Define Phase

28

Open Source Six Sigma, LLC

RTY Estimate

In many organizations the long term data


required to calculate RTY is not available. We can
however estimate RTY using a known DPU as long
as certain conditions are met.
The Poisson distribution generally holds true for
the random distribution of defects in a unit of
product and is the basis for the estimation.
The best estimate of the proportion of units
containing no defects, or RTY, is:
-dpu
RTY = e-dpu

The mathematical constant e is the base of the natural logarithm.


e 2.71828 18284 59045 23536 02874 7135

LSS Black Belt v11.1 MT - Define Phase

29

Open Source Six Sigma, LLC

Deriving RTY from DPU


The Binomial distribution is the true model for defect data but the
Poisson is the convenient model for defect data. The Poisson does a
good job of predicting when the defect rates are low.
Poisson
Poisson VS
VS Binomial
Binomial (r=0,n=1)
(r=0,n=1)

120%
120%
100%
100%

Yield(RTY)
(RTY)
Yield

Yield
Yield (Binomial)
(Binomial)
Yield
(Poisson)
Yield (Poisson)

80%
80%
60%
60%
40%
40%
20%
20%
0%
0%
0.0
0.0

0.1
0.1

0.2
0.2

0.3
0.3

0.4
0.4

0.5
0.5

0.6
0.6

Probability
Probabilityof
ofaadefect
defect

0.7
0.7

0.8
0.8

0.9
0.9

1.0
1.0

Binomial

Poisson
n
r
p
q

= number of units
= number of predicted defects
= probability of a defect occurrence
=1-p

For low defect rates (p < 0.1) the Poisson approximates the Binomial fairly well.
LSS Black Belt v11.1 MT - Define Phase

30

Open Source Six Sigma, LLC

Deriving RTY from DPU - Modeling


Unit
Opportunity

For the unit shown the following


data was gathered:

60 defects observed

60 units processed
What is the DPU?

RTY for DPU = 1

0.368
0.364

Yield

Basic Question: What is the likelihood


of producing a unit with zero defects?

0.36
0.356
0.352

What is probability that any given


opportunity will be a defect?

What is the probability that any


given opportunity will NOT be a
defect is:

The probability that all 10


opportunities on single unit will be
defect-free is:

LSS Black Belt v11.1 MT - Define Phase

0.348
10
10

100
100

1000
1000

10000
10000

100000
100000

1000000
1000000

Chances Per Unit

If we extend the concept to an infinite


number of opportunities, all at a DPU of
1.0, we will approach the value of 0.368.
31

Open Source Six Sigma, LLC

RTY Prediction Poisson Model

Use the binomial to estimate the probability of a discrete


event (good/bad) when sampling from a relatively large
population,
n > 16, & p < 0.1.

When r = 0 we compute the probability of finding zero


defects per unit (called rolled throughput yield).

r dpu
e
(dpu)
The table to the right shows the proportion of product Y =
which will have
r r! p[r]

0 defects (r = 0)

1 defect (r = 1)

2 defects (r = 2), etc

When DPU = 1

When on average we have a process with 1 defect per


unit then we say there is a 36.79% chance of finding a
unit with zero defects. There is only a 1.53% chance of
finding a unit with 4 defects.

When r = 1 this equation simplifies to: (dpu)*edpu

To predict the % of units with zero defect (i.e., RTY):

count the number of defects found

count the number of units produced

compute the dpu and enter it in the dpu equation

LSS Black Belt v11.1 MT - Define Phase

32

0
1
2
3
4
5
6
7
8

0.3679
0.3679
0.1839
0.0613
0.0153
0.0031
0.0005
0.0001
0.0000

Open Source Six Sigma, LLC

Six Sigma Metrics Calculating DPU


The DPU for a given operation can be calculated by dividing the
number of defects found in the operation by the number of units
entering the operational step.
100 parts built
2 defects identified and corrected
dpu = 0.02
So RTY for this step would be e-.02 (.980199) or 98.02%.

RTY1=0.98
dpu = .02

RTY2=0.98
dpu = .02

RTY3=0.98
dpu = .02

RTY4=0.98
dpu = .02

RTY5=0.98
dpu = .02

RTY
=0.90
RTYTOT
TOT=0.90
4
4
dpu
= .1
dpuTOT
TOT = .1

If the process had only 5 process steps with the same yield the process.
RTY would be: 0.98 * 0.98 * 0.98 * 0.98 * 0.98 = 0.903921 or 90.39%. Since
our metric of primary concern is the COPQ of this process we can say less than
9% of the time we will be spending dollars in excess of the pre-determined
standard or value added amount to which this process is entitled.

Note: RTYs must be multiplied across a


process, DPUs are added across a
process.
33

LSS Black Belt v11.1 MT - Define Phase

Open Source Six Sigma, LLC

Focusing our Effort FTY vs. RTY

Assume we are creating two products in our


organization that use similar processes.

Product A
FTY = 80%
Product B
FTY = 80%

How do you know what to work on?


*None of the data used herein is associated with the products shown herein. Pictures are no more than illustration to make a point to teach the concept.

LSS Black Belt v11.1 MT - Define Phase

34

Open Source Six Sigma, LLC

Focusing our Effort FTY vs. RTY

Lets look at the DPU of each product assuming equal


opportunities and margin
Product A

Product B
dpu 100 / 100 = 1 dpu

dpu 200 / 100 = 2 dpu

Now, can you tell which to work on?


the product with the highest DPU? think again!
How
How
How
How
How

much more time and/or raw material are required?


much extra floor space do we need?
much extra staf or hours are required to perform the rework?
many extra shipments are we paying for from our suppliers?
much testing have we built in to capture our defects?

*None of the data used herein is associated with the products shown herein. Pictures are no more than illustration to make a point to teach the concept.
LSS Black Belt v11.1 MT - Define Phase

35

Open Source Six Sigma, LLC

Summary

At this point you should be able to:


Describe what is meant by Process Focus
Generate a High Level Process Map
Describe the importance of VOC, VOB and VOE, and CTQs
Explain COPQ
Describe the Basic Six Sigma metrics
Explain the diference between FTY and RTY
Explain how to calculate Defects per Unit DPU

LSS Black Belt v11.1 MT - Define Phase

36

Open Source Six Sigma, LLC

IASSC Certified Lean Six Sigma Black Belt (ICBB)


The International Association for Six Sigma Certification (IASSC) is a Professional
Association dedicated to growing and enhancing the standards within the Lean Six Sigma
Community. IASSC is the only independent third-party certification body within the Lean Six
Sigma Industry that does not provide training, mentoring and coaching or consulting
services. IASSC exclusively facilitates and delivers centralized universal Lean Six Sigma
Certification Standards testing and organizational Accreditations.
The IASSC Certified Lean Six Sigma Black
Belt (ICBB) is an internationally recognized
professional who is well versed in the Lean
Six Sigma Methodology. The Certified Black
Belt Exam, is a 4 hour 150 question
proctored exam.

Learn about IASSC Certifications and Exam options at


http://www.iassc.org/six-sigma-certification/
LSS Black Belt v11.1 MT - Define Phase

Open Source Six Sigma, LLC

Das könnte Ihnen auch gefallen