Sie sind auf Seite 1von 37

GE Confidential

TCS
Internal

balan babu
Oracle CoE Seepz ODC
30-6-2004

What Is AIM?
Oracles Application Implementation Method
(AIM) is a proven approach for implementing
Oracle Applications.

GE Confidential
TCS
Internal

Oracle Application Implementation Methodology


Processes

GE Confidential
TCS
Internal

Phases

PHASES

GE Confidential
TCS
Internal

Where this fits?

GE Confidential
TCS
Internal

Phase I - Definition
During the definition phase, the business and the system
requirements are analysed. Based on the future business model,
the technical architecture is decided.

Deliverables:
"Current Business Baseline" (RD020) for signoff of Phase I

GE Confidential
TCS
Internal

Phase II - Operation Analysis


Based on the business requirements from the phase I, the
project team develop business scenarios to assess the level of fit
between the business requirements & the standard functionality
available. Gaps are identified & corresponding solutions are
developed.
Deliverables:
Signoff documents for phase II -"Business Requirement Definition RD050
"Business Requirement Mapping BR030
"Customisation Plan
GE Confidential
TCS
Internal

Phase III - Solution Design


In this phase, detailed designs for the optimal solutions to meet
the business requirements will be done. Detailed narratives for
the process solutions developed in the analysis phase are also
created by the process team.
Deliverables:
Signoff documents for phase III
Create Application Extensions Functional Design- MD.050
Create Application Extensions Technical Design- MD.070

GE Confidential
TCS
Internal

Phase IV - Build
The testing of all customisations, data conversions and
interfaces is done in this phase. Policies & procedures related to
the business process modifications are also developed. The
business system testing & performance testing of the system is
also done in this phase.
Deliverables:
Signoff documents for phase IV
" Conference Room Pilot Testing Signoff "
" User Acceptance Test Signoff "

GE Confidential
TCS
Internal

Phase V - Transition
The finished solution is deployed in this phase. The project
team trains the end users & the technical team configures the
production environment & converts the data.

Deliverables:
Signoff documents for phase V
"Training Schedule"
" User Manual"

GE Confidential
TCS
Internal

Phase VI - Production
This phase starts when the users start performing the
transactions in the new system. The activities included in this
phase are the refinements in the processes & the performance
measurement steps.

Deliverables:
ins Direction Recommendations
" End Report " for sign off of Phase VI .

GE Confidential
TCS
Internal

Processes

GE Confidential
TCS
Internal

Business Process Architecture (BP)


- Understanding of the organizations business processes
- Determine the change required and to design the new or changed
business processes.
Documents:
BP.010 - Define Business and Process Strategy (Optional)
BP.020 - Catalog and Analyze Potential Changes (Optional)
BP.030 - Determine Data Gathering Requirements (Optional)
BP.040 - Develop Current Process Model (Optional)
BP.050 - Review Leading Practices (Optional)
BP.060 - Develop High-Level Process Vision (Optional)
BP.070 - Develop High-Level Process Designs (Core)
BP.080 - Develop Future Process Model (Core)
BP.090 - Document Business Procedures (Core)
GE Confidential
TCS
Internal

Business Requirement Definition (RD)


Business Requirements Definition defines the business needs that must
be met by the implementation project.
The business processes are documented after identifying the
business events and detailing the process steps that respond to
the business events.
Documents:

RD.010 - Identify Current Financial and Operating Structure (Core)


RD.020 - Conduct Current Business Baseline (Core)
RD.030 - Establish Process and Mapping Summary (Optional)
RD.040 - Gather Business Volumes and Metrics (Core)
RD.050 - Gather Business Requirements (Core)
RD.060 - Determine Audit and Control Requirements (Core)
RD.070 - Identify Business Availability Requirements (Core)
GE Confidential
TCS
Internal - Identify Reporting and Information Access Requirements (Core
RD.080

Business Requirement Mapping (BR)


The business requirements stated would be compared with the
software standard functionality and gaps that must be addressed
to meet the business requirements are identified. These gaps
will be resolved by documenting the workarounds or by changing
the underlying business process. However, if a customisation
is required, the efforts for the same will be estimated separately.
The work may be started after sign off on the business
requirement definition.
Documents:
BR.010 - Analyze High-Level Gaps (Core)
BR.020 - Prepare Mapping Environment (Core)
BR.030 - Map Business Requirements (Core)
BR.040 - Map Business Data (Core)
GE Confidential
TCS
Internal

Business Requirement Mapping (BR)


Documents:
BR.050 - Conduct Integration Fit Analysis (Optional)
BR.060 - Create Information Model (Optional)
BR.070 - Conduct Reporting Fit Analysis (Core)
BR.080 - Test Business Solutions (Optional)
BR.090 - Confirm Integrated Business Solutions (Core)
BR.100 - Define Application Setups (Core)
BR.110 - Design Security Profiles (Core)

GE Confidential
TCS
Internal

Application and Technical Architecture (TA)


A plan will be made for deploying and configuring the information
system architecture to meet the defined business requirements.
This work will be done along with the business requirement
definition and mapping process.
Documents:
TA.010 - Define Architecture Requirements and Strategy (Core)
TA.020 - Identify Current Technical Architecture (Optional)
TA.030 - Develop Preliminary Conceptual Architecture (Optional)
TA.040 - Define Application Architecture (Optional)
TA.050 - Define System Availability Strategy (Core)

GE Confidential
TCS
Internal

Application and Technical Architecture (TA)


Documents:

TA.060 - Define Reporting and Information Access Strategy (Optional)


TA.070 - Revise Conceptual Architecture (Optional)
TA.080 - Define Application Security Architecture (Optional)
TA.090 - Define Application and Database Server Architecture (Optional
TA.100 - Define and Propose Architecture Subsystems (Optional)
TA.110 - Define System Capacity Plan (Core)
TA.120 - Define Platform and Network Architecture (Core)
TA.130 - Define Application Deployment Plan (Optional)
TA.140 - Assess Performance Risks (Core)
TA.150 - Define System Management Procedures (Core)
GE Confidential
TCS
Internal

Module Design and Build (MD)


Custom software solutions like forms, reports; triggers, and alerts
will be built for gaps in functionality identified in Business
Requirement Mapping.
Documents:
MD.010 - Define Application Extension Strategy (Optional)
MD.020 - Define and Estimate Application Extensions (Optional)
MD.030 - Define Design Standards (Optional)
MD.040 - Define Build Standards (Optional)

GE Confidential
TCS
Internal

Module Design and Build (MD)


Documents:
MD.050 - Create Application Extensions Functional Design (Optional)
MD.060 - Design Database Extensions (Optional)
MD.070 - Create Application Extensions Technical Design (Optional)
MD.080 - Review Functional and Technical Designs (Optional)
MD.090 - Prepare Development Environment (Optional)
MD.100 - Create Database Extensions (Optional)
MD.110 - Create Application Extension Modules (Optional)
MD.120 - Create Installation Routines (Optional)

GE Confidential
TCS
Internal

Data Conversion (CV)


A high-level data conversion plan will be developed during analysis
stage of the project.
Work on analysis, design, construction, testing, integration and
implementation of data conversion process, manual and/or
automated, as defined by the business system requirements will be
taken up subsequently.
Identification of interface points with the legacy system, if any,
will be done during analysis stage of the project. Work on analysis,
design, construction, testing, integration and implementation of
interfaces will be taken up subsequently.

Documents:
CV.010 - Define Data Conversion Requirements and Strategy (Optional)
CV.020 - Define Conversion Standards (Optional)
GE Confidential
TCS
Internal

Data Conversion (CV)


Documents:
CV.030 - Prepare Conversion Environment (Optional)
CV.040 - Perform Conversion Data Mapping (Optional)
CV.050 - Define Manual Conversion Procedures (Optional)
CV.060 - Design Conversion Programs (Optional)
CV.070 - Prepare Conversion Test Plans (Optional)
CV.080 - Develop Conversion Programs (Optional)
CV.090 - Perform Conversion Unit Tests (Optional)
CV.100 - Perform Conversion Business Object Tests (Optional)
CV.110 - Perform Conversion Validation Tests (Optional)
CV.120 - Install Conversion Programs (Optional)
CV.130 - Convert and Verify Data (Optional)
GE Confidential
TCS
Internal

Documentation (DO)
A detailed user and technical documentation tailored to the
implementation will be prepared by the core team for all the above
said processes.
Documents:
DO.010 - Define Documentation Requirements and Strategy (Core)
DO.020 - Define Documentation Standards and Procedures (Optional)
DO.030 - Prepare Glossary (Core)
DO.040 - Prepare Documentation Environment (Optional)
DO.050 - Produce Documentation Prototypes and Templates (Optional)
DO.060 - Publish User Reference Manual (Optional)
DO.070 - Publish User Guide (Optional)
DO.080 - Publish Technical Reference Manual (Optional)
DO.090 - Publish System Management Guide (Optional)
GE Confidential
TCS
Internal

Business System Testing (TE)


Configuration of some selected business scenarios will be done
as per the business requirements and demonstrated to
business users in a Conference Room Pilot (CRP) session.
Minor gaps may be identified during CRP session, which shall be
addressed by required change in configuration and final CRP.
Documents:
TE.010 - Define Testing Requirements and Strategy (Core)
TE.020 - Develop Unit Test Script (Optional)
TE.030 - Develop Link Test Script (Optional)
TE.040 - Develop System Test Script (Core)
TE.050 - Develop Systems Integration Test Script (Optional)

GE Confidential
TCS
Internal

Business System Testing (TE)


Documents:
TE.060 - Prepare Testing Environments (Core)
TE.070 - Perform Unit Test (Optional)
TE.080 - Perform Link Test (Optional)
TE.090 - Perform Installation Test (Optional)
TE.100 - Prepare Key Users for Testing (Core)
TE.110 - Perform System Test (Core)
TE.120 - Perform Systems Integration Test (Optional)
TE.130 - Perform Acceptance Test (Core)

GE Confidential
TCS
Internal

Performance Testing (PT)


Integrated business cycle testing will be conducted to verify the
technical and functional performance of the system.
Any architecture or functional changes if required will be done to
meet the requirements.
Documents:
PT.010 - Define Performance Testing Strategy (Optional)
PT.020 - Identify Performance Test Scenarios (Optional)
PT.030 - Identify Performance Test Transaction Models (Optional)
PT.040 - Create Performance Test Scripts (Optional)
PT.050 - Design Performance Test Transaction Programs (Optional)

GE Confidential
TCS
Internal

Performance Testing (PT)


Documents:
PT.060 - Design Performance Test Data (Optional)
PT.070 - Design Test Database Load Programs (Optional)
PT.080 - Create Performance Test Transaction Programs (Optional)
PT.090 - Create Test Database Load Programs (Optional)
PT.100 - Construct Performance Test Database (Optional)
PT.110 - Prepare Performance Test Environment (Optional)
PT.120 - Execute Performance Test (Optional)
PT.130 - Create Performance Test Report (Optional)

GE Confidential
TCS
Internal

Adoption and Learning (AP)


Work instructions and user manuals will be tailored for the
end users by the core team. The end users will also be trained
by the core team to perform the necessary business functions.
Documents:
AP.010 - Define Executive Project Strategy (Optional)
AP.020 - Conduct Initial Project Team Orientation (Core)
AP.030 - Develop Project Team Learning Plan (Core)
AP.040 - Prepare Project Team Learning Environment (Core)
AP.050 - Conduct Project Team Learning Events (Core)

GE Confidential
TCS
Internal

Adoption and Learning (AP)


Documents:
AP.060 - Develop Business Unit Managers' Readiness Plan (Optional)
AP.070 - Develop Project Readiness Roadmap (Core)
AP.080 - Develop and Execute Communication Campaign (Core)
AP.090 - Develop Managers Readiness Plan (Optional)
AP.100 - Identify Business Process Impact on Organization (Optional)
AP.110 - Align Human Performance Support Systems (Optional)
AP.120 - Align Information Technology Groups (Optional)
AP.130 - Conduct User Learning Needs Analysis (Optional)
AP.140 - Develop User Learning Plan (Core)
AP.150 - Develop User Learning ware (Optional)
AP.160 - Prepare User Learning Environment (Core)
AP.170 - Conduct User Learning Events (Core)
AP.180 - Conduct Effectiveness Assessment (Core)
GE Confidential
TCS
Internal

Production Migration (PM)


The finished solution will be deployed in the organization after
ascertaining the production readiness. The transition will be
completed when the data is migrated to the new system and the
users start performing transactions in the new system.
Documents:
PM.010 - Define Transition Strategy (Core)
PM.020 - Design Production Support Infrastructure (Core)
PM.030 - Develop Transition and Contingency Plan (Core)
PM.040 - Prepare Production Environment (Core)
PM.050 - Set Up Applications (Core)

GE Confidential
TCS
Internal

Production Migration (PM)


Documents:
PM.060 - Implement Production Support Infrastructure (Core)
PM.070 - Verify Production Readiness (Core)
PM.080 - Begin Production (Core)
PM.090 - Measure System Performance (Optional)
PM.100 - Maintain System (Core)
PM.110 - Refine Production System (Optional)
PM.120 - Decommission Former Systems (Optional)
PM.130 - Propose Future Business Direction (Optional)
PM.140 - Propose Future Technical Direction (Optional)

GE Confidential
TCS
Internal

AIM Implementation Approaches

GE Confidential
TCS
Internal

Project
Approach
Paths

GE Confidential
TCS
Internal

GE Confidential
TCS
Internal

GE Confidential
TCS
Internal

GE Confidential
TCS
Internal

GE Confidential
TCS
Internal

Das könnte Ihnen auch gefallen