Sie sind auf Seite 1von 17

Schlumberger WELL

ACTIVITIES
Schlumberger Private

Schlumberger Activities slide 1

Schlumberger WELL
ACTIVITIES

Schlumberger Activities slide 2

Schlumberger Private

The little man pictured here will


help you understand where the
business begins and ends

Schlumberger WELL
ACTIVITIES
SEISM
IC
Schlumberger Private

Schlumberger Activities slide 3

Schlumberger WELL
ACTIVITIES
SEISM
IC

This provides a subterranean picture of


a possible resource.

Schlumberger Activities slide 4

Schlumberger Private

The generation of acoustic waves that


travel into the earth and reflect back to
the surface to be recorded by sensors
and interpreted by computers.

Schlumberger WELL
ACTIVITIES
DRILLING & WELL

2 CONSTRUCTION

Schlumberger Private

Schlumberger Activities slide 5

Schlumberger WELL
ACTIVITIES
DRILLING & WELL

2 CONSTRUCTION

Schlumberger Activities slide 6

Schlumberger Private

The use of a rig and crew for the


drilling, suspension, completion,
production testing, capping,
deepending, plugging back,
sidetracking, redrilling or reconditioning
of a well.

Schlumberger WELL
ACTIVITIES
WELL

3 LOGGING

Schlumberger Private

Schlumberger Activities slide 7

Schlumberger WELL
ACTIVITIES
WELL

3 LOGGING

The term comes from the word log used


in the sense of a record or a note.
Wireline logs are taken downhole,
transmitted through a wireline to surface
and recorded there.

Schlumberger Activities slide 8

Schlumberger Private

The measurement of one or more


physical quantities in or around a well.

Schlumberger WELL
ACTIVITIES
WELL

4 TESTING

Schlumberger Private

Schlumberger Activities slide 9

Schlumberger WELL
ACTIVITIES
WELL

4 TESTING

-including pressure, temperature, flow rate


and fluid properties
-while the well is either flowing or shut in.

Schlumberger Activities slide 10

Schlumberger Private

Well Testing involves providing access to


and measurement of dynamic reservoir
data

Schlumberger WELL
ACTIVITIES
WELL

5 COMPLETION

Schlumberger Private

Schlumberger Activities slide 11

Schlumberger WELL
ACTIVITIES
WELL

5 COMPLETION

This work includes running the pipe and


jewelry, perforating, setting packers,
tubing hangers and Christmas trees in
place.
Schlumberger Activities slide 12

Schlumberger Private

The work done on a wellbore to establish


safe production of the resource or
injection of fluids after the production
casing string has been set, cemented and
pressure tested.

Schlumberger WELL
ACTIVITIES
ARTIFICIAL

6 LIFT

Schlumberger Private

Schlumberger Activities slide 13

Schlumberger WELL
ACTIVITIES
ARTIFICIAL

6 LIFT

Schlumberger Activities slide 14

Schlumberger Private

Systems that are placed in the wellbore


to lift fluids because the reservoir lacks
the energy to cause the natural flow of
fluid to surface, such as gas lift or
electrical submersible pumps.

Schlumberger WELL
ACTIVITIES
PRODUCTION &

7 PRODUCTIVITY

Schlumberger Private

Schlumberger Activities slide 15

Schlumberger WELL
ACTIVITIES
PRODUCTION &

7 PRODUCTIVITY

Productivity is the measure of a well


completions ability to produce, expressed
in volume of gross liquid produced per day
per unit of differential pressure between
the static reservoir pressure & the wells
flowing bottomhole pressure (drawdown).
Schlumberger Activities slide 16

Schlumberger Private

Production is the stage in the reservoir


life during which hydrocarbons are
brought from the reservoir through the
completion and surface facilities to be
sold.

Schlumberger WELL
ACTIVITIES

Schlumberger Activities slide 17

Schlumberger Private

The END

Das könnte Ihnen auch gefallen