Beruflich Dokumente
Kultur Dokumente
Panel Serging
10/26/15
Panel serging
1 thread O/L
2 thread O/L
3 thread
O/L
10/26/15
1.
2.
3.
4.
10/26/15
Machine Used
SUPPLIER: JUKI
COST: $499
SUPPLIER:
BRAITHWAITE
COST: $459
10/26/15
10/26/15
Features
10/26/15
Features
10/26/15
Intermediate level of
technology
A 2/3/4- thread overlock machine with motor driven system for lifting
the needle.
10/26/15
10
10/26/15
11
Machine Used
12
Specification
10/26/15
13
Supplier
HOSEKI brand by
GEMSY 757G Super
High-Speed Overlock
Sewing Machines
Series
SUPPLIER:
GEMSY 757G
COST: $799
10/26/15
14
Specifications
Model
No. Of needles
No. Of threads
Needle gauge
Stitch width
Stitch length
Differential ratio
Height of presser foot
Needle
Motor
Sewing speed
757G
2
5
3mm
5mm
3.6mm
0.7-2
5.5mm
DCx27 #11-#18
3450 r.p.m. clutch
motor
7500 s.p.m.
10/26/15
15
10/26/15
16
The machine comes with an air-blow table,which issues a jet of air from
its air nozzles at three locations to contribute to smoother handling of
material.
10/26/15
17
The operator simply places the fabric on the machine, and starts the
machine.
10/26/15
18
Supplier: JUKI
ASN-690 series
10/26/15
Specification
19
Model name
Machine head
Application
Max. sewing speed
Stitch length
Over edging width (mm)
Differential feed ratio
ASN-690
MO-6904S (super high speed,1needle overlock m/c)
Serging of pants , skirts , jeans etc
8,000 sti/min
0.8 to 4 mm
4.0,4.8,5.6
For gathering 1:2 (max 1:4),for stitching 1:0.7 (max
1:0.6)
Needle
DC x 27 (#11) #9,#14
Thread trimming device Exclusive pneumatic side cutter
Lubrication
Automatic
Lubrication oil
ISO VG 18
Compressed air
0.5 Mpa
Power consumption
590 VA
Power requirement
Single-phase 200 to 240V,3-phase 200 to 380V
10/26/15
Machine Weight
Long table-160kg,short table-110kg
20
10/26/15
21
10/26/15
22
SAM value for serging both the front panels = 0.75 min
10/26/15
23
Keeping all this in mind, we can calculate the ROI for the highest level of
technology and find out how effective it is for an industry
10/26/15
24
SAM value for serging both the front panels = 0.30 min
10/26/15
25
Formulas to be used:
DR = Depreciation rate
n = Number of years
ROI for any year= [CM Price from total machine - total operator
salary till that year] Depreciated value of total machine,
expressed as a percentage
10/26/15
Basic Level of
Technology
0.75
640
26
12
199680
1.44
Advanced Level of
Technology
0.30
1600
26
12
499200
1.44
71885
1600
3
24000
72000
0.15
62609
3000
108000
215654
107654
171.95%
0.67
311500
1600
1
1500000
1500000
0.15
1304348
3000
36000
718848
682848
52.35%
2.20
10/26/15
27
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
10/26/15
Basic Level of Technology
28
Dep. Rate
Initial Value
0.15
Value Year 1
7200062608.70
Value Year 2
Value Year 3
Value Year 4
Value Year 5
54442.34
47341.17
41166.23
35796.72
Total CM Earned
862617.60
862617.60
862617.60
862617.60
862617.60
Expenses
108000.00
108000.00
108000.00
108000.00
108000.00
754617.60
754617.60
754617.60
754617.60
754617.60
ROI
1205.29
1386.09
1594.00
1833.10
2108.06
Cummulative Return
1205.29
2591.38
4185.38
6018.47
ROI in Year
0.08
Number of Months
1.00
10/26/15
29
Dep. Rate
0.15
Value Year 1
15000001304347.83
Value Year 2
Value Year 3
Value Year 4
Value Year 5
1134215.50
986274.35
857629.87
745765.10
Total CM Earned
718848.00
718848.00
718848.00
718848.00
718848.00
Expenses
36000
36000.00
36000.00
36000.00
36000.00
682848.00
682848.00
682848.00
682848.00
682848.00
ROI
52ti.35
60.20
69.24
79.62
91.56
Cummulative Return
52.35
112.56
181.79
261.41
ROI in Year
1.91
Number of Months
22.92
10/26/15
30
Thank you
10/26/15