Beruflich Dokumente
Kultur Dokumente
Hammer Delivery
Service Record
HAMMER DELIVERY
SERVICE RECORD
DLR CODE
HAMMER MODEL
SERIAL NO.
HOURS
DELIVERY DATE
/
/
WEIGHT
HOURS
CARRIER
IDENTIFICATION:
MAKE
MODEL
SERIAL NO.
INSTALLATION
INFORMATION:
MOUNTING BRACKET:
CAT DLR
QUARRY DEMOLITION
TUNNELING
OTHER
High Idle
TEST DATA
NOTE:
HAMMER DATA:
BAR/PSI
BAR/PSI
BAR/PSI
LPM/GPM
BAR/PSI
BAR/PSI
BAR/PSI
BAR/PSI
BAR/PSI
C / F
YES
YES
YES
MACHINE DATA:
NO
NO
NO
Flow
(GPM)
Pressure
@ Flow Meter
Free flow
500
1000
1500
1800
2000
2300
2400
2500
Back Pressure
Oil Temperature
Test Purposes:
- Verify flow at pressure
- Verify back pressure in hammer
return line
- Verify relief setting in hammer circuit
Both hammer
test ports are
4BSPP
Test Purposes:
- Verify average operating pressure to specification
- Confirm pressure adjusting valve set properly
Flow Meter
Flow
(GPM)
Pressure
@ Flow Meter
Free flow
500
1000
1500
1800
2000
2300
2400
2500
Back Pressure
Oil Temperature
Test Purposes:
- Verify flow at pressure
- Verify back pressure in hammer
return line
- Verify relief setting in hammer circuit
Test port is
4BSPP
Pressure Gauge
Test Purposes:
- Verify average operating pressure to specification
- Confirm pressure controller set properly
Cracking
Point
100
60
40
20
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
3200
Flow (gpm)
80
Flow (gpm)
Pressure (psi)
Transducer
Test
CORRECT
PRESSURE
RELIEF SETTING
SAFETY MARGIN
PEAK PSI
PRESSURE
3000 PSI
TIME
INCORRECT
PROBLEMS:
- OVERHEATING
- SLOW HAMMER
PEAK PSI
TIME
Basic Trouble
Shooting
Oil Warms Up
Relief Valve Opens
Too Low Cooling Capacity
Too Low Oil Viscosity
Faulty Hydraulic Installation
Internal Leak
Basic Trouble
Shooting
1. Carrier System
Electrical.
Relief setting.
Flow setting.
Filter.
2. Hydraulic Kit
Quick coupler failure.
Damaged or pinched hose.
Ball valve closed.
3. Hammer