CHLORIDE CORROSION
ANALYSIS
CHLORIDE CORROSION
ANALYSIS
CHLORIDE CORROSION
ANALYSIS
CHLORIDE CORROSION
ANALYSIS
And by this way we obtain the values of chloride ions
measurements.
REPAIR METHODS
1. For the cracks with less chloride ions percent that
maximum value:
- Injecting cracks according to principle 4.5. of EN1504
2. For the cracks with higher chloride ions percent that
maximum value:
- Remplacing contaminated concrete according to
principle 7.2. of EN-1504
For both, increase the coating according to principle
7.1. of EN-1504.
The products and methods selected will be explained next.
INJECTING CRACKS
For the repair methods and products, we select a
guide of a Spanish company - SIKA
SIKA guide for injecting cracks in principle 4.5
INJECTING CRACKS
Requirements and concrete preparation:
The concrete slab must have at least 28 days.
The concrete surface must have a clean surface
around all the crack. And must be health, clean
and free of loose material.
If it was necessary clean the interior of the crack
with compressed air or water.
INJECTING CRACKS
First, apply the surface sealant.
Surface sealant:
We use the product of SIKA SIKADUR 31 HMG
INJECTING CRACKS
Next, inject the product.
Sealing of crack :
We use the product of SIKA SIKADUR 52
Mix the product.
Inject at constant preassure.
Start injecting at the lowest point until the fluid brim in the
next nuzzle.
To finish, When the resin is hard, remove the surface
sealant and finish to seal the crack until the same altitude
as the concrete surface.
INJECTING CRACKS
COATING INCREASE
For the process of coating increase, we select a
guide of a Spanish company - SIKA
SIKA guide for injecting cracks in principle 7.1.
COATING INCREASE
Support preparation:
It must be clean and without friable material. If it
was necessary, it will be prepare with mechanic
methods.
Wetting the surface until saturation.
Product mix:
Mix it with water according to the consistency
that you want to achieve.
Mix during 2-3min.
COATING INCREASE
Application:
Apply the product manually or with mechanic
projection.
Its important take into account the working times,
and do the job and expansion boards.
Concrete curing:
It must be protected of sun, wind and freeze
during its hardening.
Avoid the formation of cracks with a good cured,
with water contributions.
COATING INCREASE
Remove concrete
Clean Steel bars
Coating steel bars
Put new concrete
Prepare cracks
Clean surface
Aply the surface sealant
Injecting cracks
Clean surface
Wet surface
Aply the coating product
Cured
Paint the lines
24-48h
48h
24h
24h
48h
48h
WORK TIMES
WAITING TIMES
96h
TOTAL TIME
150h