Beruflich Dokumente
Kultur Dokumente
Version Introduction
Version
R1.0
Date
2009-06-04
Author
Li Chang
Reviewed by
Gan Wenjun
Amendment
Records
First edition
Course Objectives
To be familiar with test schemes
To master methods to prepare
test and to collect test data
To master methods of test data
analysis and report export
Contents
Test Scheme
Test Preparation
Test Data Collection
Test Analysis Report
Test Scheme
Evaluation test of
network performance
Categorized according to
the test purpose
Network
optimization
test
Contrastive test of
network performance
Test Scheme
DT (Drive Test)
It can be
divided into two
categories according
to the test method
CQT (Call Quality
Test)
Test Scheme
DT Test for CS
Test Method
Vehicle Speed:
Constant speed
Test Mode:
MOC/MTC
Call Method:
Continuous call
and short call
Test Route:
Test Time:
Even coverage, Depends on
avoid repetition requirements
when possible by the Operator
Test Scheme
DT test for
Data Service
Test environment
Test items
Test Scheme
CQT Test for CS
Test Method
Test Scheme
CQT Test for Data Service
Test environment :
Test spots:
Test items:
Attach test
PDP context activation test
WAP test
Ping test
FTP download test
Multimedia message end-to-end test
Contents
Test Scheme
Test Preparation
Test Data Collection
Test Analysis Report
Test Preparation
Test equipment
TEMS (Ericsson)
E7478A (Agilent)
Nemo (Nokia)
Test Preparation
Test Preparation
Test Preparation
Environment
familiarization
and map collection
Atlas
Electrical map in
mapinfo format, etc.,
Human and geographical
environment
Project parameter
collection
The latitude &
longitude of the cell,
azimuth, downtilt
angle, antenna height
and type, etc.
Radio parameter
collection
Including LAC, CI,
BCCH, and BSIC, etc.
Contents
Test Scheme
Test Preparation
Test Data Collection
Test Analysis Report
CS statistics
Number of calls
Number of call completions
Number of call drops
Rx level
Intermittent voice
Background noise
Monologue
Echo
Crosstalk
PDP activation
rate, activation time,
WAP refresh
success rate
Data Service
Statistics
FTP download
rate, RLC throughput
and BLER
Contents
Test Scheme
Test Preparation
Test Data Collection
Test Analysis Report