Technical Review
Committee Report
Our Mission
The High Rock Lot RFP Technical Review Committee
(TRC) was appointed by the City Council in late 2015
to produce a clear, understandable, and objective
comparison of the two proposals received in response
to a RFP issued by the City, seeking a mixed-use
project that would also accommodate a variety of
parking needs.
After several months of meetings and examining the two
proposals, we are pleased to make this informational
presentation to the public and the City Council this
evening.
Who We Are
Overview
While parking is clearly not required for projects in the T-6 zone, if we
employ parking standards that are applicable in other zones, we
estimate that up to 400-500 more spots may be needed if the needs
of the City and the City Center were met in addition to forthcoming
mixed-use demand.
Urban Form
Paramount Realty Group LLC/The Community
Builders
Proposes internally-oriented residential village; residential and retail uses; retail on
Lake and
Maple Aves; multi-level parking accessed from High Rock; upper level residential
units
Internally connected with open pedestrian bridges
Access: Parking only from High Rock Ave; pedestrian access on York St, High Rock, Maple and Lake Aves
Streetscape:
- Retail on Lake Ave and, presumably, on Maple
- No liner buildings on High Rock Ave; streetscape is essentially a 2-3-story parking structure with 3-story staircase
water feature; no residential/commercial activity at High Rock street level
- Pedestrian amenities/activities generally oriented towards inside of complex; minimal east-west pedestrian access
- Significant physical separation between streetscape and interactive activities within center of site
Massing:
- Creates appearance of a super-block with little faade interruption along length of Maple, High Rock Aves
- 5+ story structure adjacent to York St and north; No real transition from total building height to street grade
- Presents much differently from historic urban pattern; large, connected structures have uniform faades and
rooflines
Public amenities:
- Proposes diversity of targeted housing including senior, workforce and market-rate; seniors are physically
separated from other housing in Lake Ave tower.
- Proposes internal promenade as Greenbelt integration with staircase connection to points north
Urban Form
Hyman Hemispheric/Sequence Development
Plan presents a general massing approach to the redevelopment of this site.
Approx. square footage of mixed uses provided little specifics on
architectural details, building materials, etc. Applicants suggest flexibility
In working with the City to establish final build-out, design, etc.
Streetscape:
- Includes liner buildings with office and retail uses along High Rock; includes street-level
retail along Lake Ave
- Parking generally handled below grade or toward center of parcel
- Identifies east-west arcade pedestrian connector from High Rock to Maple/City Center
and Broadway
Massing:
- Overall massing is broken up by a series of building forms of varying heights; more
consistent with historic pattern of multiple individual buildings
- Building form heights generally transition to street level along east and north sides
- Proposes area of surface parking on north end adjacent to York St.
Public amenities:
- Identifies opportunity for open space, rooftop gardens and terraces at multiple
locations on site
- Identifies parking/flex space on north end for civic events, farmers market, etc.
- Suggests to funnel Greenbelt path along High Rock Ave corridor
Engineering
Hyman Hemispheric/Sequence Development
Suggests excavation of the rock along the portion of the lot that is adjacent to
Maple Ave. This would involve digging back into the slope from High Rock
toward Maple while maintaining the elevation of High Rock as the base elevation
Paramount Realty Group LLC/The Community Builders
Proposes excavating into the grade of the existing lot to an elevation well below
High Rock . An entire level of parking is proposed below the existing grade and
in their response letter Paramounts states that, no rock removal is expected.
Finance
Tax Revenues
Land Acquisition
See Present Value Calculation workbook
Hyman/Sequence $2.6 million purchase
Paramount Realty Group - 30 year lease, $1.2 million property value
Finance
IDA Financing
While approval for any project rests solely with the IDA,
it is our collective understanding that residential
projects featuring non-market rate units would not fit
the types of projects IDA is interested in financing.
Thank You
Our thanks to the City Council for allowing us to
make this presentation this evening. Our
hope is that this information was helpful to
you and the public as we consider our options
for developing this significant piece of cityowned land.