Beruflich Dokumente
Kultur Dokumente
2.Function Descriptions(1)
Function Descriptions(2)
Print (3 printers)the log sheet in real time
Degasser efficiency correction
Calculate 3 kind of lag time automatically
More than 20 applications
3 Composition(Block
Diagramm
) is the block diagram of the unit
The following
(the power supply is not included)
analyzer(FID)
Non-hydrocarbon
analyzer(TCD)
Control panel
Gas pump
Degasser
Composition(computer system)
3 computers linked on
Windows network(1of 3
is industrial computer)
4 colour printers
3 for real-time sheet
1 for applications
Real-time software
system
Applications
Database
Composition(monitoring workstation)
The monitoring workstation displays
real-time mud logging parameters and
curves, manages real - time data.
The data displaied on the screen can be selected from
Parameter list,
the curve screen can
select between
logarithm and
linearity , and the
measureme nt scale
can be changed
Composition(app
work station)
Composition(interface panel)
Interfaces include Engineering Unit and
Drilling Fluid/Geological Unit. The interfaces are
unitarily designed, which have high level of
modularity, can be
connected and
disconnected with
power on, safe and
reliable. The signal
cable adopts bus type,
which is easy to rig up and service.
Composition(sensors)
The sensor group is composed of engineering
sensors and drilling mud sendors. All together
there are 22 sensors, which are
Composition(sensors)
Composition(power supply)
Composition(H2 generator)
per cycle
Non-hydrocarbon---2
min per cycle
Automatically control
the degasser and pump
Control
12bit A/D convertor
Chart recorder
Constant temperature
500.5
minimum concentration
to the full scale
Calibration only need 2
points(8 points max.).
*Online
*Manual
*Auto
LED display
* Constant temperature( 2 )
* TCD current
Button for ignition
computers,
and can be changed to other data format
such as Access ,Excel,etc.
in real time
Clients can configure
the printed sheet
List of applications
No.
Item
No.
Item
Carbonate
11
Bit Report
12
Deviation
Kick Control
13
Daily Report
Drilling Optimization
14
Cementing
Formation Pressure
15
Casing
16
Datebase Editor
Gas Evaluation
17
REPLAY
Hydraulics
18
LogMaster
Gas mV Value
19
10
Drilling Engineering
Diagram
20
Setup Program
Thank you!