Welcome AFLCMC/HBA - Col Leonard
Introductions/Agenda AFLCMC/HBAN Mr. Thorp
Organizational Conflict of Interest (OCI) Briefing AFMC 66 ABG/JA
Iraqi Program Overview AFLCMC/HBAN Mr. Thorp
Technical Requirements Mr. Thorp
Contracting AFLCMC/HBAK Mr. Foster
Acquisition and Site Visits
Additional Contractor Questions & Answer Session
Prime Contractor One-on-One 20-minute Sessions
23 July 2015
0800 1100 Prime Contractor One-on-One 20-minute Sessions
Welcome
Col Norman Leonard
Senior Material Leader
Aerospace Management Systems Division
AFLCMC/HBA
4
Industry Day
AFLCMC/HBAN assumes all questions are non-proprietary. Contractor must indicate if a question has
proprietary information
Question/Comment Sheets
Company Name: __________________________________
Your Phone:
Questions?
12
Organizational Conflict of
Interest (OCI) Briefing
Office of the Staff Judge Advocate
AFMC 66 ABG/JAN
13
OCI Mitigation at
AFLCMC
Office of the Staff Judge Advocate
Hanscom AFB, MA
15
16
17
18
19
Conclusion
AFLCMC OCI Review Process
Obtain OCI Mitigation Plan Outline
Submit plans to the Contracting Officer
20
21
Organizational Structure
Overarching System Description
Requirements
Q&A
22
23
Program Background
Signed Letter of Offer and Acceptance (LOA) 23
June 2014
Funding for effort received 23 Jan 2015
Requirements Definition Feb May 2015
Sources Sought June 2015
Industry Day July 2015
24
Organizational Structure
Senior Material Leader
Col Leonard
Represented today:
OSD
SAF
FFRDCs
Contracting Office
Lead: Mr. Peter Foster
Buyer: Mr. Terry Kirkwood
25
Systems Engineering
Lead: Ms. Janna Miller
Mr. Ted Papadopoulos
Overarching System
Description/Requirements
Government of Iraq (GoI) requires the contractor provide:
Site Survey Reports
Evaluation of ATCT equipment, Adecel MaxSim Tower Simulator System
(TSS), and AutoTrak II (AT2) Radar Simulator System (RSS)
Repair or Procure non-functioning equipment
26
3. Air Base One :Al Sahra (Tikrit) Air Base. The contractor shall conduct a site survey of
the ATCT equipment, AWOS, Adecel MaxSim tower simulator (TSS), and the AutoTrak II
(AT2) radar simulator systems to determine what equipment and services are required to
restore operations and to provide on-site CLS. The ATCT equipment and ATC training
systems were bought and installed under Foreign Military Sales (FMS) program G3-D-QAI.
27
28
29
Technical Requirements
31
CY16
CY17
CY18
CY19
J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M
Site Survey
Repair or
purchasing
new equipment
CLS
1 Year CLS
Oper/Maint
Training
Warranty
2 Year Warranty
Schedule is not direction but for illustration of major phases and events
The contractor must provide their own schedule of their plan.
32
33
Other Requirements
Mr. Joseph Thorp
Iraq Program Manager
AFLCMC/HBAN
34
Iraq Program
Other Requirements Topics
35
Program Management
Design and Installation
Training
Maintenance and Warranty
Program Management
Meetings and Reviews
Types of Meetings and Reviews
36
http://
iraq.usembassy.gov/consular/us/resources/security_
companies.html
37
38
39
40
41
Contracting
Mr. Peter Foster
Iraq PCO
AFLCMC/HBAK
42
All Contractor incurred costs associated with this Acquisition will not be
reimbursed by the Government
Evaluation of Proposals:
45
46
47
48
Acquisition Strategy
There is no approved Acquisition Strategy
49
Acquisition Process
Acquisition Phases
Market Research
Request For Proposal (RFP) and
Source Selection
Contract Award
Install Equipment
Testing/Certification
Operations/Sustainment
50
I n t e g r i t y - S e r v i c e - E x c e l l e n50c e
Acquisition Process
DRAFT Schedule
Contract Award Activities (Sept 15 Apr 15)
51
Acquisition Schedule
CY15
Jun
Jul Aug
CY16
Dec Jan Feb
LOA/IPD
SourcesSought
IndustryDay
RFPRelease
SourceSelection
ContractAward
SiteSurvey
CLS
52
Acquisition Process
US Government not responsible for any contractor costs
associated with site visits prior to contract award
USG will not sponsor/support pre-contract site visits
53