Beruflich Dokumente
Kultur Dokumente
Use in PP/DS
If you do not enter any value for the PP/DS horizon or if
you enter the duration '0', the system automatically
uses the SNP production horizon as the PP/DS horizon.
Therefore, the PP/DS horizon is as long as the SNP
production horizon. This means the planning intervals
for SNP and PP/DS are sequenced with no gaps or
overlaps.