NATIONAL HIGHWAYS
IN NAGALAND .
INTRODUCTION
A full fledged National Highways
Wing
headed
by
Chief
Engineer(NH) was created in the
year
2008
to
monitor
and
supervise all National Highway
projects
and
other
related
projects under State PWD funded
by the Ministry of Road Transport
& Highways (MORTH),Govt. of
India.
Sl.
No
NH / Route
Under
NPWD
NH No.
Under
BRO
Existing NH
Amguri (Assam)- TuliMokokchung-Wokha1
Kohima-Mao gate
(Manipur)
Mokokchung-Tuensang2 Kiphire-Meluri-Jessami
(Manipur)
Diphu Road Dillia Gate Tragopan Hotel Jn
3 Dimapur--KohimaChizami-Jessami NH202 (Manipur)
Tragopan Hotel Jn
4 Dimapur-Nagaland Gate
Golaghat Road
NH-2
(Old 61
&39)
NH-202
(Old
155)
240.00
30.50
0.00
270.50
326.50
0.00
0.00
326.50
NH-29
(Old 39
& 150)
8.67
195.00
0.00
203.68
NH-129
(Old 39)
0.00
1.30
0.00
1.30
801.98
575.17
226.8
Length in Kms
Sl.
No
NH / Route
Peren-Jalukie-Pilma
Junction -Razaphe
Junction- NH 29 near
Dimapur
NH-2 Near Changtongya
connecting LonglengAboi-Mon- Tizit
( Nagaland)
NH 2 near
Mokokchung-Zunheboto
and from Chazuba Meluri via ThevopheshuPhek -Kotisu Tezatse226
Tuensang- Longling
Mokokchung to NH 715
Total
NH 129A
71
71
NH-702
177
177
NH-702A
260
260
NH-702B
104
104
NH-702D
85
85
71
71.00
697
1498.97
626
0
1201.17 226.80
Length in Kms
Sl.
No
NH / Route
16
Total
Grand Total NH
10
11
12
13
14
15
NH No.
49.00
49
167
167
200
200
280
280
2.7
2.7
75
75
0
773.7
71
71
71
844.7
1974.70
0
0
255.3
142.00
2372.00
Length in Kms
Sl.
No
National Highways
& SARDP Roads
Under Under Under Total Road
NH / Route
NH No.
In Nagaland
NPWD
BRO
NHIDCL
Length
SARDP-NE Phase A
Pfustero to Phek
Chakabama - Chozuba
-Zunheboto
Changtonyga to
Longleng
Mon-Wakching-TamluMerangkong
Kohima-Peren
Total
SARDP
NH702A
/SH
NH-702
42.86
42.86
66
66
128
128
35
35
100
100
96
96
329
96
42.86
467.86
SARDP
SARDP
Sl.
No
NH / Route
NH No.
Under
NPWD
Under
BRO
SARDP-NE Phase-B
g
h
i
Pfustero -Zhamai
Athibung-Khelma
Amguri(Tuli) NH-61(02)
to Nuiland
SARDP
SARDP
SARDP
Total
Grand Total NH& SARDP
18
18
55
55
189
189
262
262
2565.70
351.3
0
184.86
3101.86
NH: 702
143
NH: 702A
Ongoing Projects-NH(O)
Sl. Sche
No. me
1
NH(O)
NH(O)
NH(O)
NH(O)
NH(O)
NH(O)
NH(O)
Name of Project
3
Strengthening of existing two lane pavements
from km 6.00 to km 40.00 of NH-61 under NH
division, Kohima in the State of Nagaland
Construction of composite Bridge over river
Tsusangra at Km 219.500(Design Km 210.120)
Reconstruction of Major Bridge over River
Doyang on NH-61 at Km 105/00 under NH
Division Kohima in the State of Nagaland
Repair and rehabilitation of Doyang Bridge
(NH-2) and Dhansiri Bridge (NH-29) under NH
Division Kohima in the state of Nagaland
Improvement of Sharp curves on various
locations and improvement of drainage with
RCC cover slab within Kohima Town from Km
0.00 to km 6.00 on NH-61 during 2015-16
under NH Division No.1 Kohima in the State of
Nagaland
Repair and rehabilitation of existing 3 (three)
Nos. of Steel Bridges on NH-202 (NH-155 old)
from km 177.00 to Km 326.00 under NH(O) for
the year 2015-16 in the State of Nagaland
Rehabilitation of existing 7 (seven) no's of
steel bridges at km 12.50, km 15.83, km
20.51, km 32.80,km 42.87, km 61.15 and km
165.80 on NH-155 (202 New) under NH
division Tuensang in the state of Nagaland
Leng
Physic Financ
th Date of
NH
al
ial
Remar
(Km)/ Sanctio
No.
progre progre
ks
Span
n
ss %
ss %
(m)
4
5
6
7
8
9
61
34 Km
04-022014
100%
95.58%
61
27 m
07-012014
58%
56.32%
Ongoing
Project
61
78.44
m
19-112015
18%
Nil
Ongoing
Project
61 &
29
31-032016
Under
Tenderin
g
61
31-032016
Under
Tenderin
g
155
31-032016
Under
Tenderin
g
155
31-032016
Under
Tenderin
g
Ongoing Projects-PR/IRQP
Sl.
Schem
N
e
o.
1
Name of Project
Lengt
Date Physic Financi
h
NH
of
al
al
Remar
(Km)/
No.
Sancti progr progre
ks
Span
on
ess % ss %
(m)
4
61
20-112015
97%
91%
Ongoing
Project
61
21-112015
5%
Nil
Ongoing
Project
61
22-112015
55%
Nil
Ongoing
Project
155
14
31-032015
86%
76%
Ongoing
Project
155
20
14-012015
55%
20%
Ongoing
Project
155
14
14-012015
90%
20%
Ongoing
Project
Schem
e
CRF
CRF
CRF
CRF
CRF
CRF
CRF
Name of Work
Leng
th
(Km)
/
Span
(m)
Date of
Sanction
Remarks
28-12-2015
Ongoing Project
29-12-2015
Ongoing Project
28.07.2015
Bridge
28-07-2015
28-07-2015
28-12-2015
29-12-2015
Bridge
Bridge
Bridge
Flyover
Name of Work
Lengt
h
Date of Remar
(Km)/
Sanction
ks
Span
(m)
CRF
30 m
10
CRF
20 m 8-01-2016
11
CRF
45 m
29-122015
Bridge
12
CRF
27 m
28-122015
Bridge
13
CRF
60 m
08-012016
Bridge
14
CRF
17 Km
17-022014
15
CRF
16
CRF
22 Km
17 Km
80.5
Km
8-01-2016 Bridge
17-022014
10-102014
Bridge
Schem
Sl.
e
No
E&I
E&I
E&I
E&I
E&I
E&I
E&I
E&I
Name of Work
Length
(Km)/ Date of Rema
Span Sanction rks
(m)
Construction of road from Akuluto Town to Mukhami (NH61) via Tishi valley, Lotisami, Lotisami old, Lotisami New
Village (32 km) under Economic Importance (EI) Scheme 32 Km
2015-16 (32 Km)
Construction of 26 Km long road from Kijumetuoma to
Ghathashi via Phuyeqa including 2 (two) Nos. of 25 meters 26 Km
span bridge under E&I Scheme ( 26 Km)
Construction of road from Mongtikang village to Dikhu
River, Longleng (length 11 Kms) under E&I Scheme
Construction of road from Botsa Seiyhama-Ziezu
Improvement of road from Aghunato to Asuto via Satami
11 Km
11 Km
16 Km
146.00
Km
31-032016
11-052016
27-052016
24-032006
24-032006
24-042016
30-102006
07-012008
Bridge
&
Road
Scheme
Sl.
No
32.6 Km
25-112010
21 Km
22-022012
25 Km
31-012014
125 m
06-062014
ISC
30 Km
28-102015
ISC
2.5 Km
01-062015
ISC
ISC
ISC
ISC
5
6
Name of Work
ISC
Length
(Km)/ Date of Remar
Span Sanction
ks
(m)
11-052016
Bridge
Bridge
&
Road
Achievements
CONCLUSION
The Government of Indias sincere commitment
to improve the infrastructure facilities in the North
East has boosted the prospects of Construction
and Improvement of National Highways in the
state
There are a lot of shortcomings and the
challenges are manifold. However under the
dynamic leadership of our Honble Minister(NH),
tremendous changes are taking place . Further ,we
commit ourselves to improving National Highways
connectivity to acceptable standards within the
state in the next 2 to 3 years.
THANK YOU !