Presentation

on
summer training
Presented by
Vivek Jain

Construction of Bridge Over Hindon River


Near Parthala-Khanjarpur in Greater Noida
Under

Introduction to company
Establishment in 1973 year
Up state govt. accelerate the activities of
design and construction of bridges in the
state.
Management:
Project manager : Mr. Ashesh srivastava
Assistant engineer : Mr. Surendra
srivastava
Junior engineer : Mr. kavindra Kumar

Introduction to site
Name of Bridge

Construction of bridge over


hindon on both side service
road near village parthalakhanjarpur, in Greater Noida

Design Discharge

4000 Cumecs

Formation Level

206.190

M.S.L.

177.990

Vertical Clearance

1.20 M

Length of Bridge

211.530 M

Road Width

2X7.50 M Clear road way

No. of Carriage way

2X2 lane

Span Arrangement

2 X7 X28.25 M C/C Bearing

Foundation

5.50 M Outer dia. RCC wall


foundation

Sub-Structure

1 No. of 2.50 M Dia Circular pier

Super-Structure

3 No. of PSC beams with RCC


deck slab

General Drawing of Service Road

Construction Of Bridge
Foundation : foundation is provided to transfer
the loads from the superstructure to the soil.
In the construction of bridge well foundation is
used which is generally a type of deep foundation
.
Sub structure: It is that part of the structure
which transfers the structural loads to the
foundation. i.e. pier, pier cap, abutment.
Super structure : super structure that part of the
bridge structure which supports traffic. i.e. deck
slab, beams.

Construction Area
Well cap: It transmit the load from pier to the
body of the well.
Abutment : Support at beginning or end of the
bridge integrated with ground.
Beam : It is that part of super structure which is
under bending along the span. It is the load
bearing member which supports the span.
Cross beam : It is the part of the structure which
connect two beams.
Slab : It is the bridge floor which carrying load.
Deck transfer the load to the girder.

Const Heigh
ructio t
n area Thick
ness

Diame Lengt
ter
h

Well
cap

1.20 M

5.50 M

Abutm
ent

86 CM

Beam/
girder

1.80 M

Deck
slab

20 CM

Cross
beam

Width Grade Grade


of
of
concre steel
te

Dia.
Of
bars

M 35

Fe 500

16,25
mm @
110 c/c
spacin
g

M 45

Fe 500

25, 32
mm

28.25
M c/c
bearin
g

1.10 M M 45

Fe 500

12, 10
mm
@200
mm

30.40
M

7.50

M 45

Fe 500

10,12,
16,25
@200
mm

1.90 M

25 CM

M 45

Fe 500

16, 20
mm @

86 CM

Reinforcement

Reinforcement cont.

Concreting

Curing
Curing is very important
It maintain water cement ratio ( if
evaporation takes place)
It prevent drying shrinkage cracks in
concrete.

Cube testing
This site has quality control lab for the in-situ
testing of concrete .
Compression test

Prestressing
All the beams are casted in cast in situ condition
acc. To post tensioning method.
In presterssing 12 T 13 system of prestress was
used.
After prestressing grouting was done .

Prestressing

THANKYOU