Beruflich Dokumente
Kultur Dokumente
5S
TEAM
WELCOMES
YOU ALL
keeping together is
progress;
working together is
success.
2
ETL 5S
TEAM
A USHA RANI
Sr. Technician
(LEADER)
M V SRINIVASU
Foreman
(MEMBER)
P SURYA NARAYANA
Foreman
(MEMBER)
Say YES
to 5S
K HARI
Chargeman
(MEMBER)
P GANGA RAJU
Dy. Technician
(MEMBER)
3
ETL
DEPARTMENT
PROVIDES
SERVICE
SUPPORT
TO SHOP
ELECTRICAL
OF ALL
PRODUCTION
UNITS
IN THE
FIELD OF
POWER
ELECTRONIC
EQUIPMENTS
AROUND
1200
THYRISTO
R
CONTROL
DRIVES.
AROUND
300 PLCs.
AROUND
30 CNCs.
DRIVES
Siemens
AEG
NGEF
ANSALDO
ABB
SQUARE-D
CGEE-ALSTOM
BHEL
Russian
systems
Yaskawa
PLC
Siemens
Allen Bradley
GE Fanuc
Telemechaniqu
e
Honey Well
Schneider
ABB
6
UPS
Siemens
Power One
DB
Vistar
Emerson
HIREL
APLAB
Numeric
CNC
Siemens
Lynx
Burney
ESAB
Maintains Electronic
Laboratories for repair of
Printed Circuit Boards.
OUTLINES
5S MANUAL
5S STEERING COMMITTEE
5S ZONES
ORGANIZATION STRUCTURE
5S AWARENESS ACTIVITIES
5S SUSTENANCE
PROMOTIONAL ACTIVITIES
SPECIAL INITIATIVES
MILESTONES
BENEFITS OF 5S
5S MANUAL
OBJECTIVE
To define, document and communicate the
roles, responsibility and authority in order
to facilitate effective implementation of
5S - the work place management system.
10
STEERING COMMITTEE
CHAIRMAN:
HOD
CONVENER:
DEPARTMENT 5S COORDINATOR
MEMBERS:
11
5S ZONES
ETL OFFICE
ETL STORES
ETL LABORATORIES
12
5S Zonal
Co-ordinators
13
5S ???
14
1S-SEIRI
SORTING
15
STEPS TO 1S:
Segregate Wanted & Un-Wanted things .
Remove Un-Wanted ones.
Benefits:
Space Saving & Improvement in Work
Efficiency
16
SEIRI AT LAB:
Before 1S
Wanted & Unwanted material was
at same area
REDTAG PHOTO
AT MAIN LABORATORY
17
E WASTE
No
Decided to
Relocate
Yes
18
LISTING OF E-WASTE
EWASTE
DISPOSAL
19
STORAGE POLICY:
PRIORITY
FREQUENCY OF
USE
HOW TO USE
HIGH
LOCATE AT THE
WORK PLACE
AVERAGE
STORE TOGETHER
NEAR TO WORK
PLACE
20
SCRAP DISPOSAL
FREQUENCY
1. Dust Bins (organic)
Every day
2. Dust Bins (in-organic)
Twice in a week
3. Disposal of Hazardous
scrap yearly
4. Solid electronic waste
once in a year
21
22
STEPS TO 2S
Decide the Place & Arranging in order.
A place for every thing and every
23
BEFORE 2 S
AFTER 2 S
24
SEITON AT LAB:
Before 2S
ALL THE PROBES WERE MIXED
25
2S IN OFFICE
BEFORE 2S
AFTER 2S
26
2S AT
BEFORE 5S
LAB:PEEP
AFTER 5S
27
2S IN STORES
28
2S in Stores
Before
After
29
30
3S-SEISO:
STEPS TO 3S ????
Dust Free Equipment / Work Place.
Make it easy to Clean.
Make it easy to Inspect Abnormalities.
Benefits:
Healthy Work environment
Abnormalities are Visible & Corrected.
32
3S AT LAB:
22.02.15
33
34
4S-SEIKETSU
STANDARDISATION
35
STEPS TO 4S
Standard Procedure for all activities.
Review of Procedures and Work
36
ARRANGEMENT AT LAB
37
38
39
STANDARD PRACTICES
40
5S-SHITSUKE
SUSTENANCE &
SELF DISCIPLINE
41
STEPS TO 5S
Actions to be taken:
Forming the Habit / Culture.
Regular Training & Update.
Follow the decided things.
Benefits:
Habit of doing it Right First Time and Every
Time .
Total Employees Involvement.
42
43
44
45
46
BY CONDUCTING SELFAUDIT:
Before:
Before:
After:
After:
47
INSPECTION
BY
STEERING
COMMITTEE
48
5S SUSTENANCE AT ETL
DEPARTMENT
49
50
MAINTAINING 5S CORNER
51
5S AT SURROUNDING
AREA
52
5S AT GARDENS
BEFORE 5S
14.04.07
04.04.14
53
5S AT GARDENS
AFTER 5S
04.04.14
54
55
PROMOTIONAL ACTIVITIES
56
57
58
WINNERS OF 5S COMPETITIONS
59
MILESTONES OF 5S:
Improvements through Kaizens
2017
2016
2015
2014
2005
steering
Re-certification
Certification
Committee
formed
60
KAIZEN 1
TITLE : Easy simulation of Russian PCBs by making test jig
Problem:
Russian PCBs
Male edge
connector is having densely populated
and congested pins which causes short
circuit of connected wires and damage to
the PCB.
Solution:
REPAIR : 10DAYS
NO DAMAGE TO THE PCB
62
KAIZEN 2
Implemented by
team
Benefits:
Quality of card repair is improved
No strain on eyes
63
KAIZEN 3
Implemented by
team
Benefits:
No quality complaints
Easy simulation of PCBs
64
KAIZEN 4
charges.
1
CCD1
EMS
DRIVE
DRIVE
ABB ACS-800
RDCU02
C
OL
BOARD
WITH
EMS
SOFTW
ARE
ARXR
7210
POWER
SUPPLY
15
PLC
GE VERSAM IC200
FANUC
AX
PWR 102
PC
The
and it captures
all the
CO&format is self-explanatory,
SCHN
BMXP34
CPU
3
2,3,C
CCP
C4
PLC
EIDER
M340
2020
M340
1
0
vital points.
1
262
19
65
KAIZEN 5
TITLE : Refurbishing of ETL notice board
Problem: Difficulty in reading circulars which
are kept in notice board
Solution: Background card board is fixed and
is covered with velvet cloth
Electrical wiring has been done
Tube light holder arrangement fixed
66
KAIZEN 6
Problem: There was no proper method for calculating equipment up time for
TOTAL
the equipment maintained by Contract.
DAYS
DATE OF
EQUIPME
JOB
DATE OF
THE
EQUIPME
BREAKDO REFERRAL
DATE
NT
ORDER
ITS
EQUIPM
NT
S.NO
WN
TO
OF in MS EXCEL format which REMARKS
Solution:
A
proper
summary
sheet
was
prepared
REFEREN
REFERE
AVAILABI
ENT
AVAILABI
DATE/TIME MAITENANCE
REPAIR
CE availability of the equipment
NCE
LITY
NOT
LITY
shows the
CONTRACT
AVAILAB
LE
VSP/ETL/M
VSP/ETL/
05/07/2014;
05/07/2014;
SMPS FAN
Implemented
by
:
Smt
Sesha
Kumari
&
team 05-07- 05-071 MSM/ECR3
MMSM/E
_
100%
10.00AM
10.00AM
2014
2014
CLEANED
/25
CR3/25
PC MOTHER
Benefits:
VSP/ETL/M
VSP/ETL/
BOARD AND
05/07/2014; 05/07/2014;
05-0705-072 MSM/ECR3
MMSM/E
_
100%
HARD DISK
10.00AM
10.00AM
2014
2014
Monitoring
/44
CR3/44
NOT
is easy
REPAIRABLE
SMPS
Monitoring is accurate
PROBLEM.
VSP/ETL/
VSP/ETL/
(CAPACITOR
Higher uptime
04/09/2014; 04/09/2014; WRM/CS 04-0910-093 WRM/CSR/
5
94.5%
1000MFD 10V
9.10 AM
9.10 AM
R/PG
2014
2014
PG KIT /04
& DIODE IN
KIT /04
5361B715
REPLACED)
67
KAIZEN 7
68
Rs. 5,04,000
Rs. 8000
18.12 Lakhs
69
INTANGIBLE BENEFITS:
70
71
72
ELECTRO
TECHNICAL
LABORATORY
CONTINUAL
IMPROVEMENT
HOUSE
KEEPIN
G
SWACH
H
BHARAT
H
TRAINING
KAIZEN
5S
73
74
75
ANY
SUGGESTIONS???
76