Foundation:
The foundations for the BWSL project consist of:
i. 2000-mm diameter piles numbering 120 for the
cable-stayed bridges.
ii. 1500-mm diameter piles numbering 484 for the
approach bridges which is four per pier.
Segments:
The segments are used to form the road way in the
bridge.
They weigh around 120-140 tonnes each.
From pier to pier 17 segments form a span.
The segment length varies from 3000 mm to 3200 mm.
Deck post tensioning is performed at the completion.
The Pre-Cast segments are joined together using high
strength epoxy grout with nominal pre-stressing initially.
Cable-stayed bridge:
The cable-stayed portion of the Bandra channel is 600
meters and consists of two 250-meter cable supported
main spans flanked by 50 meters conventional
approach spans.
The cable-stayed portion of the Worli channel is 350
meters in overall length and consists of one 150 meters
cable supported main span flanked by two 50 meters
conventional approach spans.
Tower:
A center tower, with an overall height of 128 meters above
pile cap level, supports the superstructure by means of four
planes of cable stay in a semi-harp arrangement.
Bandra :
The tower is cast in-situ reinforced concrete using the
climbing form method of construction.
The overall tower configuration is an inverted Y shape
with the inclined legs oriented along the axis of the bridge.
Tower cable anchorage recesses are achieved by use of
formed pockets.
Worli:
The cable-stayed portion of the Worli channel is 350
meters in overall length.
consists of one 150 meters cable supported main span
flanked by two 50 meters conventional approach spans.
the tower here is also cast in-situ reinforced concrete
using the climbing form method of construction but the
overall tower configuration is I shape with the inclined
legs.
Materials used:
Concrete:
A high performance concrete of grade M60 mixed with micro
slurry silicate is used to plug gaps and make it water proof.
To protect the rebar from cold sea water concrete is mixed
with fly ash as it is an excellent agent for delaying
carbonation.
Galvanised rebar
Epoxy coated rebar
Subjected to uv damage
Not required
Stay cables:
High tensile steel cables are used.
These are the cables which support the bridge
deck on the sea.
The stays transfer their loads on to the pylons.
One end of the stay cable is attached to the
tower and the other end with the bottom of the
segment.
Epoxy grout:
The Pre-Cast segments are joined together using high
strength epoxy grout with nominal prestressing initially.
Epoxy grout
Early hardening
No sealing required
Cement grout
Slow hardening
Difficult in maintaining
Sealing required